100% found this document useful (1 vote)
59 views57 pages

Pdf24 Merged

Uploaded by

arpitha hosamane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
59 views57 pages

Pdf24 Merged

Uploaded by

arpitha hosamane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 57

SJB SAP |SEM 06

ARPI
THAH
1J
A20AT007
INDEX

SL NO TOPIC
1 SITE PLAN APARTMENT PROJECT
2 FLOOR PLANS SL NO TOPIC
3 COLUMN LAYOUT 1 SITE PLAN

4 SLAB PROFILE 2 BASEMENT FLOOR PLAN

5 BEAM LAYOUT 3 GROUND FLOOR PLAN

6 SHUTTERING DETAIL 4 TYPICAL FLOOR PLAN

7 LOFT AND LINTEL DETAIL 5 FOURTH FLOOR PLAN

8 SECTIONS 6 TERRACE FLOOR PLAN

9 ELEVATIONS 7 ELECTRICAL PLAN - BASEMENT FLOOR

10 STAIRCASE DETAIL 8 ELECTRICAL PLAN - GROUND FLOOR

11 LIFT DETAIL 9 ELECTRICAL PLAN - TYPICAL FLOOR

12 KITCHEN PLAN 10 ELECTRICAL PLAN - FOURTH FLOOR

13 KITCHEN SECTION 11 PLUMBING PLAN

14 ELECTRICAL PLANS

15 PLUMBING PLANS

16 DRAINAGE PLANS
ARPITHA H
17 WATER SUPPLY PLANS 1JA20AT007
SEM 06
24384

1500
1500
1500
18288

REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT

2000
ENTRY EXIT

6000
6MWIDE ROAD
24384

PARKING
RAMP
5M 1:10 SLOPE

LVL -1.8
LIFT UP
1.5 X 1.5
18288

REV: DESCRIPTION: BY: DATE:

SECURITY ROOM
RESIDENCE PROJECT
4M X 6M

BATHROOM
2M X 3M

LVL +0

ENTRY EXIT

6MWIDE ROAD
UTILITY
3.5M X 5M
BATHROOM BEDROOM
3M X 5M 5.5M X 5M

LIFT UP DOWN
1.5 X 1.5

REV: DESCRIPTION: BY: DATE:

FAMILY ROOM RESIDENCE PROJECT


8.5M X 6M
KITCHEN
5M X 6M

ENTRY EXIT
6MWIDE ROAD
BEDROOM BATHROOM BATHROOM BEDROOM
5.5M X 5M 3M X 5M 3M X 5M 5.5M X 5M

LIFT UP DOWN
1.5 X 1.5 REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT

LIVING ROOM
BEDROOM BATHROOM
8.5M X 6M
5M X 5M 3M X 5M
DRESSING
2M X 5M
LIFT UP DOWN
1.5 X 1.5

TERRACE REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT
A B C D E F G H
START FROM HERE

5230 3859 1370 1755 3720 2010 3100 1610

22

1620
1735

90
2
487
1 1620
PARKING
RAMP
5M 1:10 SLOPE
5040

LVL -2
2
LIFT UP
1980

1.5 X 1.5 REV: DESCRIPTION: BY: DATE:

3
RESIDENCE PROJECT
2500

4
SECURITY ROOM
4M X 6M
4800

BATHROOM
2M X 3M
5
506
2230

2120
95

1
25

LVL +0

1619

ENTRY EXIT

6MWIDE ROAD
A B C D E F G H
START FROM HERE

5230 3859 1370 1755 3720 2010 3100 1610

22

1620
1735

90
2
487
1 1620
5040

UTILITY
3.5M X 5M
BATHROOM BEDROOM
3M X 5M 5.5M X 5M

2
LIFT UP DOWN
1980

1.5 X 1.5
REV: DESCRIPTION: BY: DATE:
3
2500

RESIDENCE PROJECT

FAMILY ROOM
8.5M X 6M
4800

KITCHEN
5M X 6M

5
506

2120
95
2230

1
25

1619

6MWIDE ROAD
A B C D E F G H
START FROM HERE B'

5230 3860 1370 1755 3720 2010 3100 1610

22

1620
1735

90
2
487
1 1620
5040

BEDROOM BATHROOM BATHROOM BEDROOM


5.5M X 5M 3M X 5M 3M X 5M 5.5M X 5M

2
LIFT UP DOWN
1980

1.5 X 1.5 REV: DESCRIPTION: BY: DATE:

3 RESIDENCE PROJECT
2500

4
LIVING ROOM
BEDROOM BATHROOM
8.5M X 6M
5M X 5M 3M X 5M
DRESSING
4800

2M X 5M

5
506
2230

2120
95

1
25

1619
A B C D E F G H
START FROM HERE

5230 3859 1370 1755 3720 2010 3100 1610


22
1735

90

F1 450 F1 F1
1200

F1 F1 F1
1 1620 2380

200
C1 C1 C1 C1 C1 C1
1200 F1
A A

2380
450
5040

200

C1

TYP. FOOTNG PLAN


3200
F1 F1 F1
COLUMN

COLUMN
F1 F2 F1
2 C1
FFL
C1 C1 C1 C1 C1

3000
1980

C1 REV: DESCRIPTION: BY: DATE:


GFL
F1

300
PLINTH BEAM
3 C1 C1 RESIDENCE PROJECT
C1

1500
2500

PEDESTAL

400
F1 F1 F1 F1 RCC
F1 PCC 1:4:8
4

200
SECTION AA
C1 C1 C1 C1 C1
FOUNDATION DETAIL
4800

F1 F1 F1 F1 F1
5
C1 C1 C1 C1 C1
2230
A B C D E F G H

START FROM HERE

5230 3859 1370 1755 3720 2010 3100 1610


22
1735

718
90

1620
1
1620
5040

200

400
1600
2 1620 PLAN
1980

REV: DESCRIPTION: BY: DATE:


3
183
2500

RESIDENCE PROJECT

600 650
4

3200
4800

1550
1600

300
5
SECTION
2230

RETAINING WALL
·

·
A B C D E F G H
·

·
5230 3860 1370 1755 3720 2010 3100 1610
SLAB
·

150

150
·
1735

SUNKEN SLAB SLAB

1 ·

·
SUNKEN SLAB DETAIL

RAMP
5M 1:10 SLOPE

4805
5040

STAIRCASE
LVL -1.8
2
LIFT 3100
1.5 X 1.5 REV: DESCRIPTION: BY: DATE:
1980

3
RESIDENCE PROJECT
2500

9505
4800

LVL -150MM LVL -150MM


5
2230

LVL +0
·

·
A B G
·

·
1725 5230 3860 1370 1755 3720 2010 3100 1610
·

·
1735

SLAB

150

150
1 ·

SUNKEN SLAB SLAB ·


3520

2990 2870
RAMP SUNKEN SLAB DETAIL
5M 1:10 SLOPE

4815
4810

4810
5040

LVL -150MM LVL -150MM STAIRCASE


2
LIFT 3100
1.5 X 1.5 REV: DESCRIPTION: BY: DATE:
1980

3
RESIDENCE PROJECT
2500

9505
4800

LVL -150MM

5
2230
·

A B C D E F G H ·

·
SLAB
5230 3860 1370 1755 3720 2010 3100 1610
·

150

150
1735

SUNKEN SLAB SLAB ·

·
1 SUNKEN SLAB DETAIL
3520 2990 2872

3100

4810
4810

4810
5040

150
2700
STAIRCASE
LVL -150MM LVL -150MM

850
2 REV: DESCRIPTION: BY: DATE:
LIFT 3100
1.5 X 1.5
1980

RESIDENCE PROJECT

3
2500

SKY LIGHT DETAIL

9505
2840
4800

4930

SKY LIGHT

LVL -150MM LVL -150MM


5
2230
·

·
A B C D E F G H
·

SLAB
·

150

150
5230 3860 1370 1755 3720 2010 3100 1610 ·
SUNKEN SLAB SLAB
·
1735

SUNKEN SLAB DETAIL


·

1 ·

2870

3100

4805
5040

150
2700

850
STAIRCASE

2
LIFT REV: DESCRIPTION: BY: DATE:
3100
1.5 X 1.5
1980

RESIDENCE PROJECT
3
TERRACE

SKY LIGHT DETAIL


2500

9505
4800

SKY LIGHT

5
2230
·
A B C D E F G H
·

5230 3860 1490 1755 3720 2010 3100 1610 ·

1735
·

1
·

3520 2990 5500 2870 ·

4810

4810

4810
5040

2
4980 5240 LIFT
1980

1770
1.5 X 1.5
REV: DESCRIPTION: BY: DATE:
3

4985 7240
2500

RESIDENCE PROJECT

9055
4 7050

7050
4800

5
2230

LVL +0
·

A B C D E F G H ·

5230 3770 1455 1755 3720 2010 3100 1610 ·

1735 ·

1
5000 3520 3515 1774 2872 ·

4810

4810
4810

4810

4810

4810
5040

2
5005 5240 LIFT 2870
1980

1770
1.5 X 1.5
REV: DESCRIPTION: BY: DATE:
4125

3
5000 5240 1770
2500

RESIDENCE PROJECT
2125

2125

2130
4

9285
5000 1965 2840 5240 1770
4800

4930
4930

4930

5
2230
·

·
A B C D E F G H ·

·
B'
·

·
5230 3860 1370 1755 3720 2010 3100 1610
·
1735
·

·
1
·
5510 5240 1775
4810

4815

4810

4810

4805
5040

2
LIFT 2870
1980

1.5 X 1.5 REV: DESCRIPTION: BY: DATE:


4160

4160
3
RESIDENCE PROJECT
2500

9285
5527 4490 5240 1765
4800

4930

4930

4927
5
2230
·

·
A B C D E F G H
·

5230 3770 1455 1755 3720 2010 3100 1610 ·

·
1735

1 ·

2870

4805
5040

2
LIFT 3100 REV: DESCRIPTION: BY: DATE:
1980

1.5 X 1.5

3 RESIDENCE PROJECT
TERRACE
2500

9505
4800

5
2230
·

·
3520 2990 5500 2870
·

4815
4810

4810

4810
4980 5240

1770

1770
REV: DESCRIPTION: BY: DATE:

4985 7240
RESIDENCE PROJECT

9055
7050

7050
·

5000 3520 2990 3515 1774 2872


·

4810

4810

4810

4810

4810

4810
5000 5005 5240 2870

1775

1770
4125

REV: DESCRIPTION: BY: DATE:

5000 5240 1770

2130
2125

2125
RESIDENCE PROJECT

9285
5000 1965 2840 5240 1770
4930

4930

4930

4930
·

5510 4490 5240 1775 2870


·

·
4810

4815

4810

4810

4805
5506 4490 5240 2870
4160

4160
1765 REV: DESCRIPTION: BY: DATE:

2160
RESIDENCE PROJECT

9285
5527 4490 5240 1765
4930

4930

4927
·

REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT
24384 ·

PARKING ·

RAMP ·

5M 1:10 SLOPE
·

LVL -1.8
LIFT UP
1.5 X 1.5
18288

REV: DESCRIPTION: BY: DATE:

SECURITY ROOM RESIDENCE PROJECT

4M X 6M

BATHROOM
2M X 3M

LVL +0

ENTRY EXIT

6MWIDE ROAD
·

·
UTILITY
3.5M X 5M ·

·
BATHROOM BEDROOM
3M X 5M 5.5M X 5M

LIFT UP DOWN
1.5 X 1.5

REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT
KITCHEN FAMILY ROOM
5M X 6M 8.5M X 6M

ENTRY EXIT
6MWIDE ROAD
·

BEDROOM
BEDROOM
5.5M X 5M
5.5M X 5M

BATHROOM BATHROOM
3M X 5M 3M X 5M

LIFT UP DOWN
1.5 X 1.5
REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT

LIVING ROOM
BATHROOM
8.5M X 6M
3M X 5M
DRESSING
2M X 5M

BEDROOM
5M X 5M
·

UP
·

KEY PLANS
B C E F G
A

LIFT
ROOM

TERRACE FLOOR
REV: DESCRIPTION: BY: DATE:
LVL 7500
3000

RESIDENCE PROJECT

BEDROOM
BEDROOM
D4 D4
FIRST FLOOR
LVL 4500
3000

UTILITY BEDROOM

D2 D4
GROUND FLOOR
LVL 1500

RAMP
3000

5M
LEVEL O 1:10 SLOPE GL

LEVEL -2
BASEMENT
LVL -2800

1500
300
100

SECTION AA'
·

·
KEY PLANS
·

C D
A B E F G

LIFT

3000
ROOM

1200
TERRACE FLOOR
150

LVL 7500
REV: DESCRIPTION: BY: DATE:
BEDROOM BATHROOM

3150
5M X 5M 3M X 5M LIVING ROOM
DRESSING LIFT
8.5M X 6M 1.5 X 1.5 RESIDENCE PROJECT
2M X 5M
SUNKEN SLAB D4
LEVEL -150 MM
FIRST FLOOR
LVL 4500

3000
FAMILY ROOM LIFT
8.5M X 6M
1.5 X 1.5

D2 D4
GROUND FLOOR
LVL 1500
RAMP
LEVEL O 5M 1:10 SLOPE
LIFT

3150
GL
BATHROOM
SECURITY ROOM 1.5 X 1.5
2M X 3M
4M X 6M

SUNKEN SLAB
LEVEL -1.8 LEVEL -150 MM BASEMENT
LVL -2800
·

KEY PLANS

REV: DESCRIPTION: BY: DATE:

3000
RESIDENCE PROJECT

TERRACE FLOOR
32001000

LVL 7500

V1
W1 W2
8500

FIRST FLOOR
LVL 4500
3200
4350

W1 W2

GROUND FLOOR
LVL 1500

GL

FRONT ELEVATION
·

KEY PLANS

REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT
TERRACE FLOOR
32001000

LVL 7500

10600
D1
FIRST FLOOR
LVL 4500
3200

2750

D1
GROUND FLOOR
1200

LVL 1500

GL

SIDE ELEVATION
·

2000 2000 2000 ·

2 2 2 ·

·
MACHINE

3000

2000

2000

2000

1750
ROOM ·

·
3 3 3
·
1500 1500 1500 ·

1700
BASEMENT FLOOR PLAN BASEMENT FLOOR PLAN
1.5M X 1.5M 1.5M X 1.5M
·

·
2500

2000 2000 18
17
TERRACE FLOOR TERRACE FLOOR PLAN
LVL 7500
2 2 1.5M X 1.25M 16
15

2000

2000
14
13
3000

12

3 3 11
10
1500 1500 REV: DESCRIPTION: BY: DATE:
9
BASEMENT FLOOR PLAN BASEMENT FLOOR PLAN 8
1.5M X 1.5M 1.5M X 1.5M 7
FIRST FLOOR 6 RESIDENCE PROJECT
LVL 4500 5
4

WATER PROOFING AS PER DETAIL 3


LIFT WELL 2
3000

UP

MACHINE
ROOM
GROUND FLOOR
LVL 1500
3000

RAILING AS PER
DETAIL LIFT WELL

METAL STAIRCASE
BASEMENT AS PER DETAIL
150

LVL -2800
1500

LIFT PIT
300

SECTION ELEVATION B
100
·

982
·

11 11 11 11 ·
10 12 10 12 TREAD = 300MM
·
9 13 9 13 WIDTH = 1000MM
8 14 8 14
NO. OF RISERS = 21
·

900
7 15 7 15

18
6 16 27 16 ·
TERRACE FLOOR 66 UP
5 17 26 17
LVL 7500 18 MM THK GRANITE
4 18 25 18
3 19 24 19
60
2 20 23 20
1 21 22 21

55
BASEMENT GROUND FLOOR UP DOWN

UP

150
PLAN
50
CEMENT SCREED
300
900
900

FIRST FLOOR 44
25MM BULL NOSING PROJECTION
LVL 4500 32 32 53 53 REV: DESCRIPTION: BY: DATE:
31 33 52 54
38 30 34 51 55
DETAIL
1000 29 35 50 56
RESIDENCE PROJECT
28 36 49 57
33
48 37 48 58

47 38 47 59

28 46 39 46 60
45 40 45 61
900
900

900
44 41 44 62
23 10MM DIA
43 42 43 63
22 CONNECTING PIPE 22
GROUND FLOOR 21 50MM DIA 21
20 MS PIPE 20
LVL 1500 19 FIRST FLOOR
UP DOWN
SECOND FLOOR
UP DOWN
19
18 18
17 17
16 16
15 15

150
14 1000 0.50 300 14
50MM DIA MS PIPE 1000
13 13
12 12
11 25MM DIA 11
10 CONNECTING PIPE
10

1200
9 9
8 8
7 7

150
900

6 6
5 5
1500

1540
850

TREAD = 300MM 4 4
900

900
3 3
WIDTH = 1000MM 2 2
1 1
NO. OF RISERS = 21
BASEMENT
LVL -2800
SECTIONAL ELEVATION
RAILING DETAIL PARAPET WALL
SECTIONAL ELEVATION
A B
·

·
1 ·

UTILITY ·
3.5M X 5M
BATHROOM BEDROOM

600
3M X 5M 5.5M X 5M ·

LIFT UP DOWN ·
1.5 X 1.5
·

KITCHEN ·

FAMILY ROOM
5M X 6M

1000
8.5M X 6M
KITCHEN
5M X 6M

900 600
KEY PLAN

600
SCALE:1:150 2
REV: DESCRIPTION: BY: DATE:

PLAN AT SILL LEVEL


A B A B
RESIDENCE PROJECT

1 1
600

600
KITCHEN KITCHEN
5M X 6M 5M X 6M

590 570 560 840 560


350 1200
600

800 700 900 650 1200


2 2
300

PLAN BELOW SILL LEVEL PLAN ABOVE SILL LEVEL


·

OPEN ·

OPEN

650
OPEN ·

OPEN OPEN
·

610
2100

840
600 580 575 350 850 560 807 560
REV: DESCRIPTION: BY: DATE:
SECTIONAL ELEVATION-A

RESIDENCE PROJECT

650 455
OPEN
2460

610
2100
900

840
1000 400 560 600
SECTIONAL ELEVATION-B
24384

CEILING MOUNTED LIGHT FIXTURE

MIRROR LIGHT FIXTURE

WALL MOUNTED LIGHT FIXTURE @ GENERAL AREA

BAJAJ/WIPO 11W LED DROP LIGHT

CEILING FAN POINT

CHANDLIER LIGHT POINT

EXHAUST FAN @ TOILET


PARKING
SINGLE POLE SWITCH @ GENERAL AREA'S
RAMP
5M 1:10 SLOPE 16A SWITCH FOR GEYSER & INSTANT GEYSER

20A SWITCH FOR AC @ BEDSIDE

FAN REGULATOR WITH SWITCH @ GENERAL AREA'S

FAN REGULATOR WITH SWITCH @ BED SIDE

TELEVISION OUTLET @ LIVING

TELEVISION OUTLET @ BEDROOMS

BELL PUSH

CALLING BELL

M/O MICRO OVEN


ES ELECTRIC STOVE

CH CHIMNEY

LVL -1.8 AG AQUAGUARD

MIX MIXER
W/M WASHING MACHINE
FR FRIDGE

LIFT G GYSER
UP
1.5 X 1.5
18288

REV: DESCRIPTION: BY: DATE:

SECURITY ROOM
4M X 6M
RESIDENCE PROJECT

BATHROOM
2M X 3M

LVL +0

ENTRY EXIT
CEILING MOUNTED LIGHT FIXTURE

MIRROR LIGHT FIXTURE

WALL MOUNTED LIGHT FIXTURE @ GENERAL AREA

BAJAJ/WIPO 11W LED DROP LIGHT

CEILING FAN POINT

CHANDLIER LIGHT POINT

W/M
EXHAUST FAN @ TOILET

SINGLE POLE SWITCH @ GENERAL AREA'S

16A SWITCH FOR GEYSER & INSTANT GEYSER

20A SWITCH FOR AC @ BEDSIDE

UTILITY FAN REGULATOR WITH SWITCH @ GENERAL AREA'S

3.5M X 5M
FAN REGULATOR WITH SWITCH @ BED SIDE

TELEVISION OUTLET @ LIVING

TELEVISION OUTLET @ BEDROOMS

BELL PUSH

BATHROOM BEDROOM
CALLING BELL
3M X 5M 5.5M X 5M

G M/O MICRO OVEN


ES ELECTRIC STOVE

CH CHIMNEY

AG AQUAGUARD

MIX MIXER
W/M WASHING MACHINE
LIFT
UP DOWN FR FRIDGE
1.5 X 1.5
G GYSER

REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT
FAMILY ROOM
8.5M X 6M

FR
KITCHEN
5M X 6M

AG
M/O
ES
CH

ENTRY EXIT

6MWIDE ROAD
CEILING MOUNTED LIGHT FIXTURE

MIRROR LIGHT FIXTURE

WALL MOUNTED LIGHT FIXTURE @ GENERAL AREA

BAJAJ/WIPO 11W LED DROP LIGHT

CEILING FAN POINT

CHANDLIER LIGHT POINT

EXHAUST FAN @ TOILET

SINGLE POLE SWITCH @ GENERAL AREA'S

16A SWITCH FOR GEYSER & INSTANT GEYSER

20A SWITCH FOR AC @ BEDSIDE

FAN REGULATOR WITH SWITCH @ GENERAL AREA'S

FAN REGULATOR WITH SWITCH @ BED SIDE

TELEVISION OUTLET @ LIVING

TELEVISION OUTLET @ BEDROOMS

BELL PUSH

CALLING BELL

M/O MICRO OVEN


ES ELECTRIC STOVE

CH CHIMNEY

AG AQUAGUARD

MIX MIXER
W/M WASHING MACHINE
FR FRIDGE
G GYSER

BEDROOM BATHROOM BATHROOM BEDROOM


5.5M X 5M 3M X 5M 3M X 5M 5.5M X 5M

G G

LIFT
UP DOWN
1.5 X 1.5

REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT

LIVING ROOM
8.5M X 6M

BATHROOM
BEDROOM 3M X 5M G
5M X 5M

DRESSING
2M X 5M
CEILING MOUNTED LIGHT FIXTURE

MIRROR LIGHT FIXTURE

WALL MOUNTED LIGHT FIXTURE @ GENERAL AREA

BAJAJ/WIPO 11W LED DROP LIGHT

CEILING FAN POINT

CHANDLIER LIGHT POINT

EXHAUST FAN @ TOILET

SINGLE POLE SWITCH @ GENERAL AREA'S

16A SWITCH FOR GEYSER & INSTANT GEYSER

20A SWITCH FOR AC @ BEDSIDE

FAN REGULATOR WITH SWITCH @ GENERAL AREA'S

FAN REGULATOR WITH SWITCH @ BED SIDE

TELEVISION OUTLET @ LIVING

TELEVISION OUTLET @ BEDROOMS

BELL PUSH

CALLING BELL

M/O MICRO OVEN


ES ELECTRIC STOVE

CH CHIMNEY

AG AQUAGUARD

MIX MIXER
W/M WASHING MACHINE
FR FRIDGE
G GYSER

LIFT
UP DOWN
1.5 X 1.5

REV: DESCRIPTION: BY: DATE:


TERRACE

RESIDENCE PROJECT
COLD WATER SUPPLY

FLUSHING WATER SUPPLY


IC HOT WATER SUPPLY

SOIL PIPE
WASTE PIPE

110Ø SOIL PIPE

75Ø WASTE PIPE


PARKING COLD WATER SUPPLY PIPE

RAMP HOT WATER SUPPLY PIPE

EUROPEAN WATER CLOSET


5M 1:10 SLOPE HEALTH FAUCET

FLOOR TRAP

WASH BASIN

SINK

SHOWER

SOAP DISH

INSPECTION CHAMBER

LVL -1.8

LIFT UP
1.5 X 1.5

REV: DESCRIPTION: BY: DATE:


SECURITY ROOM
4M X 6M
RESIDENCE PROJECT

BATHROOM
2M X 3M

LVL +0

ENTRY EXIT

6MWIDE ROAD
COLD WATER SUPPLY

FLUSHING WATER SUPPLY


HOT WATER SUPPLY

SOIL PIPE
WASTE PIPE
IC
110Ø SOIL PIPE

75Ø WASTE PIPE

COLD WATER SUPPLY PIPE

HOT WATER SUPPLY PIPE

EUROPEAN WATER CLOSET


HEALTH FAUCET

FLOOR TRAP

WASH BASIN

SINK
UTILITY SHOWER

3.5M X 5M SOAP DISH

INSPECTION CHAMBER

BATHROOM BEDROOM
3M X 5M 5.5M X 5M

LIFT UP DOWN
1.5 X 1.5

REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT

FAMILY ROOM
8.5M X 6M
KITCHEN
5M X 6M

ENTRY EXIT
6MWIDE ROAD
COLD WATER SUPPLY

FLUSHING WATER SUPPLY


HOT WATER SUPPLY

SOIL PIPE
WASTE PIPE

110Ø SOIL PIPE

75Ø WASTE PIPE

COLD WATER SUPPLY PIPE

HOT WATER SUPPLY PIPE

IC EUROPEAN WATER CLOSET


HEALTH FAUCET

FLOOR TRAP

WASH BASIN

SINK

SHOWER

SOAP DISH

INSPECTION CHAMBER

BEDROOM BATHROOM BATHROOM BEDROOM


5.5M X 5M 3M X 5M 3M X 5M 5.5M X 5M

LIFT UP DOWN
1.5 X 1.5

REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT

LIVING ROOM
8.5M X 6M

BATHROOM
BEDROOM 3M X 5M
5M X 5M
DRESSING
2M X 5M
COLD WATER SUPPLY

FLUSHING WATER SUPPLY


HOT WATER SUPPLY

SOIL PIPE
WASTE PIPE

110Ø SOIL PIPE

75Ø WASTE PIPE

COLD WATER SUPPLY PIPE

IC HOT WATER SUPPLY PIPE

EUROPEAN WATER CLOSET


HEALTH FAUCET

FLOOR TRAP

WASH BASIN

SINK

SHOWER

SOAP DISH

INSPECTION CHAMBER

UTILITY REV: DESCRIPTION: BY: DATE:

3.5M X 5M
BATHROOM RESIDENCE PROJECT

3M X 5M
COLD WATER SUPPLY

FLUSHING WATER SUPPLY


HOT WATER SUPPLY

SOIL PIPE
WASTE PIPE

110Ø SOIL PIPE

75Ø WASTE PIPE

COLD WATER SUPPLY PIPE

HOT WATER SUPPLY PIPE

EUROPEAN WATER CLOSET


HEALTH FAUCET

FLOOR TRAP

WASH BASIN

SINK

SHOWER

SOAP DISH

INSPECTION CHAMBER

REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT

KITCHEN
5M X 6M
COLD WATER SUPPLY

FLUSHING WATER SUPPLY


HOT WATER SUPPLY

SOIL PIPE
WASTE PIPE

IC 110Ø SOIL PIPE

75Ø WASTE PIPE

COLD WATER SUPPLY PIPE

HOT WATER SUPPLY PIPE

EUROPEAN WATER CLOSET


HEALTH FAUCET

FLOOR TRAP

WASH BASIN

SINK

SHOWER

SOAP DISH

INSPECTION CHAMBER

UTILITY
3.5M X 5M REV: DESCRIPTION: BY: DATE:

BATHROOM
3M X 5M RESIDENCE PROJECT
COLD WATER SUPPLY

FLUSHING WATER SUPPLY


HOT WATER SUPPLY

SOIL PIPE
WASTE PIPE

110Ø SOIL PIPE

75Ø WASTE PIPE

COLD WATER SUPPLY PIPE

HOT WATER SUPPLY PIPE

EUROPEAN WATER CLOSET


HEALTH FAUCET

FLOOR TRAP

WASH BASIN

SINK

SHOWER

SOAP DISH

INSPECTION CHAMBER

REV: DESCRIPTION: BY: DATE:

RESIDENCE PROJECT

KITCHEN
5M X 6M
REV: DESCRIPTION: BY: DATE:

APARTMENT PROJECT

SITE DRAWING
N - .

CANALETA
REV: DESCRIPTION: BY: DATE:

APARTMENT PROJECT

N - .

BASEMENT

SHEMATIC
BASEMENT FLOOR
UTILITY
TOILET 2.5mX3m
1.25mX2.5m UTILITY
2.1mX3.1m

BEDROOM
2.25mX2.5m

BEDROOM TOILET TOILET


2.mX2.25m 1.25mX2.5m
KITCHEN 1.3mX2.5m
TOILET
2.1mX2.6m
0.850mX1.9m KITCHEN
STUDY
2mX3.8m
2.4mX2.5m

BEDROOM
3.37mX3.6m
TOILET BEDROOM
2.5mX1.25m 3.75mX3.6m REV: DESCRIPTION: BY: DATE:
LIVING
3.9mX4m
BEDROOM LIVING
2.9mX2.5m 4.75mX3.5m APARTMENT PROJECT
TOILET
1.3mX1.5m

SEHEMATIC
GROUND FLOOR
BEDROOM
UTILITY
3.75mX3.6m TOILET 2.5mX3m
1.25mX2.5m

UTILITY
2.1mX3.1m

BEDROOM TOILET
TOILET
2.25mX2.5m 1.25mX2.5m 1.3mX2.5m
TOILET KITCHEN
0.850mX1.9m 2.6mX2.1m
STUDY
2.4mX2.5m
KITCHEN
2mX3.8m

BEDROOM
3.37mX3.6m BEDROOM
TOILET
2.5mX1.25m 3.75mX3.6m
REV: DESCRIPTION: BY: DATE:
BEDROOM LIVING
3.75mX3.6m 3.8mX5.5m LIVING
4.75mX3.5m

TOILET APARTMENT PROJECT


1.3mX1.5m

SEHEMATIC
TYPICAL FLOOR PLAN
BEDROOM
UTILITY
3.75mX3.6m TOILET 2.5mX3m
1.25mX2.5m

UTILITY
2.1mX3.1m

BEDROOM TOILET
2.25mX2.5m 1.25mX2.5m
TOILET KITCHEN
0.850mX1.9m 2.6mX2.1m
STUDY
2.4mX2.5m
KITCHEN
2mX3.8m

BEDROOM
3.37mX3.6m
REV: DESCRIPTION: BY: DATE:
TOILET BEDROOM
2.5mX1.25m 3.75mX3.6m

BEDROOM LIVING
3.8mX5.5m LIVING APARTMENT PROJECT
3.75mX3.6m
4.75mX3.5m

TOILET
1.3mX1.5m

SEHEMATIC
FOURTH LEVEL
REV: DESCRIPTION: BY: DATE:

APARTMENT PROJECT

SEHEMATIC
ROOF PLAN
N - .

CANALETA
REV: DESCRIPTION: BY: DATE:

APARTMENT PROJECT

N - .

ELECTRICAL
BASEMENT
REV: DESCRIPTION: BY: DATE:

APARTMENT PROJECT

ELECTRICAL
GROUND FLOOR
REV: DESCRIPTION: BY: DATE:

APARTMENT PROJECT

ELECTRICAL
TYPICAL FLOOR PLAN
REV: DESCRIPTION: BY: DATE:

APARTMENT PROJECT

ELECTRICAL
FOURTH LEVEL
REV: DESCRIPTION: BY: DATE:

APARTMENT PROJECT

No. DESCRIPTION

01 110Ø SOIL PIPE

02 75Ø WASTE PIPE


03 COLD WATER SUPPLY PIPE
04 EUROPEAN WATER CLOSET
05 TOWEL ROD

06 FLOOR TRAP
07 SOAP DISH

PLUMBLING
08 IC INSPECTION CHAMBER
09 GT GULLEY TRAP
10 TOWEL RING
11

CWS
SHOWER

COLD WATER SUPPLY TYPICAL FLOOR PLAN


HWS HOT WATER SUPPLY