Work Receipt Format
Work Receipt Format
Code FO-IVDT-003
Version.3   Entry date                                 FO-IVDT Request for Receipt of Construction Works
            Validity: August 11/2011                                                                                                                   Yo
                                                                                                                                                  Medellin's town hall
      1 APPLICANT INFORMATION
                ADMINISTRATIVE PLANNING DEPARTMENT                                 Interested:
                   MONITORING AND CONTROL UNIT                                     Mailing Address:
          Email:
■ Proof ofProject's
            payment name:
                      for Urban Planning Obligations No.                                                 Stage/Substage:  of
                                                                                                                                               day month Year
                                                                                                                      the
         Address:
  by value $                                                                                             Neighborhood/Sidewalk:
■ PaymentPlanning license/resolutions:
            agreement   for Urban Planning Obligations No.:                                                                        of
                                                                                                                                             day month Year
                                                                                                                            the
           Project
    by value $     features:
           Lot area:
    Mandatory   transfer areas established in the license:                                               Total built area:
■
    1. Deed of assignment No.:                              of the   day month Year            of the Notary                       of          City
          I certify as the professional(s) responsible for the execution of the works, that the constructed project complies with the conditions of the resolution or license and the
          approved plans, and that during construction it was subjected to the technical supervision process, specified in Title I of the NSR-10. (Buildings with less than 3000 m2 of
          constructed area, and structures designed and built in accordance with Title E of the Regulations, are exempt from Technical Supervision of construction, according to
          Article 18 of Law 400 of 1997, as long as it involves less than 15 housing units).
          From the above, it is evident that the construction of the structure and non-structural elements was carried out according to the level of quality required and specified
          through the control of plans, specifications, materials, quality and execution.
              Explanatory
              annexes:
                     Name and surname of technical supervisor of the                             Signature                                   Professional card
                     work                                                                                                                    number
FILLING INSTRUCTIONS:
Filing Space                                                                                where compliance with the requirements of the work receipt that are applicable to the specific
This space is for the exclusive use of the Builder's Single Window, to locate the           request is recorded.
sticker on which the date and time of delivery of the application is recorded along         Request Form for the Appraisal Resolution of the Property No.: To request receipt of work, the
with a number that determines the type of procedure and a consecutive number for            builder must have previously requested the appraisal of the property with a minimum notice of
assignment and monitoring. .                                                                15 calendar days, therefore, indicate the file number of the property. application for an
                                                                                            appraisal resolution, or the Resolution number, if available.
      1. Applicant Information                                                              Certificate of being up to date with the industry and commerce tax for Work Receipt: Indicate
Interested party : Enter the name of the person making the request here, taking             the consecutive number and date of issue of the certificate.
special care to fill out the surnames first and then the full names. If it belongs to the   Proof of payment for Urban Planning Obligations No.: the number of the payment voucher
company, fill out the name as it appears registered with the Chamber of Commerce.           with which the urban planning obligations for Green Zones and Construction of Facilities were
CC/NIT Identification : Identification number of the person or company registered           paid.
in the previous point, either CC. Citizenship Card or NIT Tax Identification Number.        Payment Agreement for Urban Planning Obligations No .: If you have requested a payment
Correspondence Address : address for sending physical mail of response or                   facility to cancel the urban planning obligations, indicate the number of the Resolution by which
requirements regarding the procedure in process, at an address that may be the              it was authorized and the value of the facility.
same or different from the location of the project.                                         Mandatory Transfer Areas, Real Estate Registrations and Deed: Indicate the number of the real
Email : email address that is active and reviewed periodically to send notices or           estate registration(s) of the area(s) transferred to the Municipality, and the number that
responses regarding the process.                                                            identifies the public deed of assignment.
Telephone/Cell Phone : Contact number of the person requesting the procedure.               Record of Receipt of the Construction of Equipment : Indicate the number of the record and
                                                                                            mark with an X the Secretariat or Decentralized Entity that issues it.
       2. Project Information                                                               Record of Receipt of Urban Planning and Civil Works of the Secretariat of Public Works No.:
Project Name : Name of the project or how it is registered in the Urban Curatorship         Indicate the number and date of the record issued.
that issued the license.                                                                    Certificate of Peace and Safety of the Public Space of the Secretariat of Public Works No.:
Stage/Sub-stage : If the project is carried out in stages, it must be indicated for         Indicate the number and date of the certificate issued.
which of them the procedure is requested.                                                   Request to the Geodesia del Visto Bueno Group for the final geodesic mooring: it is a
Address/Location :       Indicate the nomenclature where the                                requirement for projects with lots larger than 2000 m 2. Indicate the filing number and exact
project, indicated in the urban planning license.                                           date of the request.
Neighborhood/Town : urban or rural location of the project.                                 Explanatory annexes : Only if strictly essential, attach documents that clarify the requirements
Urban Planning License : indicate the number of the resolution of the Urban                 established to carry out the work receipt process according to the specific case, and indicate the
Curatorship through which the urbanization and simultaneous construction license            number of pages attached.
or the construction license was granted, which corresponds to the executed works
that are the subject of the request.
Lot Area: Size of the lot in square meters (m2) indicated in the planning license.
Total Built Area: Area indicated in the urban planning license.
Project Characteristics: Describe the project according to its use, its destinations
(homes, private and visitor parking spaces) and number of floors that comprise it.          ONCE THIS FORM HAS BEEN COMPLETED, SUBMIT IT AT THE BUILDER'S SINGLE
                                                                                            WINDOW, LOCATED ON THE FIRST FLOOR OF THE MUNICIPAL ADMINISTRATIVE
      3. List of documents associated with the application.                                 CENTER.
Indicate the consecutive (numbers), dates and values of the documents