0% found this document useful (0 votes)
428 views15 pages

Risk Assesment - Production

Uploaded by

cghodake1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
428 views15 pages

Risk Assesment - Production

Uploaded by

cghodake1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 15

Grading of Probability/ Occurrence Grading of Impact/ Severity

Scale Meaning Scale Meaning (Delay)


Almost NIL (Never occurred in
1 1
Past) No Impact
Low Chance - Unlikely. Low Impact- delay by 1-2 Hrs./
2 (Occurred in less than 5% of 2 Impact will not pass on up to
cases) customer

Medium Chance- Unlikely. Medium Impact- delay by 24 hrs./


(Occurred in less than 10% of manageable/ Impact may dissatisfy
cases) customer
3 3
High Chance-(Occurred in less High Impact- delay by 3-5 days/
4 4
than 20% of cases) Customer dissatisfied
Extremely serious Problem/ Delay
Almost Certain-(Occurred in
5 5 by more than 1 Week/ Customer
50% of cases)
highly dissatisfied

Risk Gradation
Scale Meaning
<20 Low
20-40 Medium
>40 High

QF/QMS/18
QF/QMS/18/00/01.01.2018

Prepared By: Admn. Head

Approved by: Pla


Grading of Control/ Detection

Scale Meaning
Available & effective at source (No effect in Quality
1
& Delivery)
Has in-built secondary control / Contingency plan
2 available at In-House (No effect in quality &
delivery)

Control needs human Intervention / Contingency


plan available / can get help from outsourced (No
effect in quality & Delivery)
3
Mechanism in place but lead time to implement is
4
more than 8 Hrs.
Absent or no effective control- Lead time to
5 implement more than 2 working days- customer
dissatisfied

Prepared By: Admn. Head with Core Team

Approved by: Plant Head


Premier Seals (India) PVT. LTD

Risk Assessment and Management


Production

Cause of Risk/ Reason

Control / Prevention
Impact/ Severity (I)

Current Process
Occurrence (P)
Probability/
Detection/
Sr. No. Risk Event :Consequence Effect of Risk
Control ©

1. Customer
1. Schedule V/s.
schedule not
dispatch
1 No production plan 1. Delay dispatches reviewed. 2.
monitoring
Schedule not
record
monitoring

3 2 3

1. Capacity
1. In-proper planning 2.
1. Not fulfilment of customer Daily production
2 Over commitment schedule / planning 3.
requirements planning feasibility Customer
review schedule
monitoring
4 3 3
1. Non fulfilment of
1. No daily 1. Written
3 Vague /incomplete Instruction production plan 3. Not product plan
meeting customer schedule production plan

3 3 3

1. Only
controlled copy
doc. displayed
2. Competent
programmer 3.
1. Wrong process Competency
sheet/ control plan validated at the
1. Production of NC. Products displayed 2. Wrong/ time of
Errors in manufacturing &
4 2. N.C. products dispatched Old drawings issued interview 4. 1st
testing of WIP products 3. Incompetent QA piece In-process
to customer
person 4. Purchase & final
order not reviewed inspection is in
place 5.
Documents
issue control
record
maintained.

4 3 3
1. Only
controlled copy
doc. displayed
1. Wrong process 2. Competent
sheet/ control plan programmer 3.
1. Production of NC. Products displayed 2. Wrong/ Competency
Misunderstanding of
5 2. N.C. products dispatched Old drawings issued validated at the
customer requirements 3. Incompetent QA time of
to customer
person 4. Schedule interview 4.
order not reviewed Customer
schedule v/.s
delivery
monitoring.

4 3 3

1. Packing
1. Packing standard standard
Mismatch between packing 1. Wrong packing 2. Parts not communicated defined during
6 2. Packing material PPAP stage. 2.
instructions damaged not available in Inventory
stores monitoring by
store keeper
4 3 3

1. Invoice made
1. Violence's of legal 1. Manual entry 2. in ERP/ Tally 2.
Wrong taxation or address or
7 requirements 2. Wrong Wrong data entry in Data entry as
improper documents ERP/ Tally per purchase
delivery
order
4 3 3
1. Non fulfilment of 1. No daily
Production plan not Production plan
8 production plan 3. Not production plan
communicated down the level made
made & issued
meeting customer schedule
3 3 3

1. Customer
1. Schedule V/s.
schedule not
dispatch
9 No production as per plan 1. Delay dispatches reviewed. 2.
monitoring
Schedule not
record
monitoring

3 2 3

1. Customer
schedule not 1. Schedule V/s.
Delay in dispatches/ Failure in 1. Customer dissatisfied 2. reviewed. 2. dispatch
10 Schedule not monitoring
on-time delivery Line stoppage monitoring 3. record 2. Daily
Production plan not production plan
made
4 2 3

1. Customer
complain
1. Customer handling
complaint not logged mechanism
Increase in customer 1. Customer dissatisfied. 2. Issue defined in QMS.
& attend. 2. Issue not
11 not get closed in stipulated time. 3.
complaints Line stoppage. review regularly 3. In 2. 8 'D' analysis
proper root cause & closure
analysis & CA. monitored
against
complaints.

4 3 3
1. Process
1 Process Validation validation done
for each
products 2. Skill
1. Process matrix
validation not done evaluated for
Lack of awareness of Process 2. Process operators 3.
1 1. N.C. products produced validation chart not Process chart
validation
displayed 3. Skill displayed
matrix not through control
4 evaluated 2 plan 3

Inadequate competency 1. N.C. products produced 2. 1. Competency


2 matrix & skill
validation of operators Customer Complaints
1. Competency matrix defined
4 criteria not defined 3 for operators 2

1. N.C. products produced 2. 1. Irrelevant 1. On-job


3 Improper operator training
Customer Complaints training topics 3. training 2.
Training plan not Training plan as
4 made 3 per skill matrix 3

Identification

Incoming, WIP & finished 1. Area not 1. Identified


1. Processing of rejected demarcated 2. ID with tags 2.
1 parts not identification by
parts 2. Mix-up tags not defined in Area
Tags
3 QMS 3 demarcated 3
1. Rejected parts dispatched 1. Area not 1. Identified
Identification label not puts demarcated 2. ID with tags 2.
2 to customer 2. Traceability
on finished parts tags not defined in Area
not maintained
5 QMS 3 demarcated 3

Preservation
1. Racks & Bins
made 2. Rust
1. Rusty/ damage material 2. 1. Proper storage preventive oil
1 In-proper storage of materials
Material detoriate facility not provided used for metal
parts whenever
needed
4 3 3

PSIPL/QMS/21/00/01.01.2018
Prepared By: DH Production

Approved by: Plant Head


LTD Updated On : 01.01.2018

ment

Residual Risk Assessment

Impact/ Severity

Occurrence (P)
Residual Any Review

Probability/
RPN Recommended Opportunities

Detection/
Control ©
Risk Gradation Mitigation RPN Risk Remarks (Ref.
=PxIxC Action identified ref
= P x I x Gradation MRM MOM)

®
C

1. On-time delivery
performance
monitoring 2.
Customer data for
delivery
performance
1. Daily
18 Medium production plan 0

1. Daily
monitoring of
customer 1. Plant capability
schedule & planning
delivery
requirement
36 Medium 0
1. Daily
monitoring of
customer
schedule &
delivery
27 Medium requirement 0

1. 1st piece / In-


process inspection
report 2. Daily 1. KPI monitoring
production plan
V/s. Actual

36 Medium 0
1. 1st piece / In-
process inspection
report 2. Daily
production plan
V/s. Actual

36 Medium 0

1. Displayed at 1. Minimum
various station inventory level 2.
2. Stock register Product audit

36 Medium 0

Latest ver. Of
ERP/ Tally

36 Medium 0
1. Daily
monitoring of
customer
schedule &
delivery
27 Medium requirement 0

1. On-time delivery
performance
monitoring 2.
Customer data for
delivery
performance
1. Daily
18 Medium production plan 0

1. On-time delivery
performance
1. Daily monitoring 2.
monitoring of Customer data for
customer delivery
schedule & performance
delivery
24 Medium requirement 0

1. Written Displayed at Various


communication & Location and
CC to all. Available on LAN/

36 Medium 0
0

Criteria for
validation &
1. Displayed revalidation defined
near every
24 Medium machines 0

Validation &
1. Process revalidation criteria
24 Medium validation report 0 in QMS

1. Annual
36 Medium training plan 0

0
Parts with ought
1. Procedure for having ID label
Identification & treated as suspect
traceability products. FIFO
27 Medium 0 System.
Parts with ought
1. Procedure for
Ensure PDIR for every having ID label
Identification &
lots treated as suspect
traceability
45 High 5 3 2 30 Medium products. F

0
5 'S' system
followed.

36 Medium FIFO System 0

tion

ad