WORK INSPECTION REQUEST - WIR
Construction of Townhouses & semi-detached Villas
Project Name
(412) for Phase 1B & 1C WIR Ref.No: RHP1P2-BW-TGC-4TV-00-WI-EL-00014
Contract No
Request Submission
Employer Reem Hills Sole-Proprietorship LLC 25-Jun-24
(Date & Time)
PMC Royal Development Company Inspection 26-Jun-24
PMC Royal Architect Project Management (Date & Time ) 10:25AM
Engineer AECOM Middle East LLC Rev No: 0
Main Contractor Trojan General Contracting LLC WIR Submitted By: M/s.TROJAN
MEP Contractor Royal Advance Electro Mechanical Works LLC WIR Submitted To: Consultant-AECOM
Part A: By the Contractor:
B.O.Q Ref: N/A Discipline:
B.O.Q. Description of Works to be inspected and / or tested: General MCC Works
Civil Landscaping
Storm Water Architectural
Description of Works to be inspected and /or tested: Sewer Dredging
Water Highway Bridge Works
Irrigation LRT Bridge Works
Inspection Request for Installation of Under Ground Electrical Telephone MSE Wall
Signal Works Provisional Sum
Duct pipes, As per Attached Highlighted Drawing
Electrical Other (state)
Street Lighting
Works Location: Twin Villa-369, 4BR (Mirror) Landscape Lighting Drainage
Works Quantity: Gas Network
Drawing attached to show the location(s) Yes No Checklist attached Yes No
Attached Test Certificates Yes No
Shop Drawing Ref: RHP1P2-BW-TGC-4TV-FN-SD-EL-00001-Rev-01 Method Statement Ref: RHP1P2-BW-TGC-ZZ-XX-MS-EL-00001
Type of Attachment: Check list ITP Ref: ITP-01 Rev.02
Eng. Dayal Pushpakumar
(QA/QC Manager )
Date & Signature
Part B: By the Engineer:
Received by Engineer on: Date: Time: Signed by:
Engineer's Comments:
1. Only Ducts has inspected as per attached highlighted drawings.Subject to further Ducts
connection and installation approval.
2. Relevant shop drawing is still under Code-C, Contractor sole responsible for any rectification works
required upon the approval of the drawing.
3. All pipe ends to be covered to avoid pipe blockages during casting.
4. All pipes to be restrained not to dislocate during casting.
5. Pipe trench shall be compacted and clean with no stones / debris prior to laying the pipes.
6. Back-filling surrounds the pipes shall be done with clean and soft sand.
7. Attach survey report for pipe invert level and coordinates.
8. Refer to the comments on the attached checklist and shop drawings and comply with.
Note: Refer to the attached photos.
Irfan/Emad ali
26-06-2024
Name: Date & Signature
Discipline Engineer Decision:
A - Approved
B - Approved with comments
C - Revise & Resubmit
D - Rejected
Sr.Resident Engineer / Resident Engineer :
Name : Suheib Aboamir 27/06/2024
Date & Signature