Inspection Request For Installation and Leak Test of Under Ground Drainage Pipes, As Per Attached Highlighted Drawing

Uploaded by

Waqar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views1 page

Inspection Request For Installation and Leak Test of Under Ground Drainage Pipes, As Per Attached Highlighted Drawing

Uploaded by

Waqar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WORK INSPECTION REQUEST - WIR

Construction of Townhouses & semi-detached Villas


Project Name
(412) for Phase 1B & 1C WIR Ref.No: RHP1P2-BW-TGC-4TV-00-WI-DR-00016

Contract No
Request Submission
Employer Reem Hills Sole-Proprietorship LLC 24-Jun-24
(Date & Time)
PMC Royal Development Company Inspection 25-Jun-24
PMC Royal Architect Project Management (Date & Time ) 11:00AM
Engineer AECOM Middle East LLC Rev No: 0
Main Contractor Trojan General Contracting LLC WIR Submitted By: M/s.TROJAN

MEP Contractor Royal Advance Electro Mechanical Works LLC WIR Submitted To: Consultant-AECOM

Part A: By the Contractor:


B.O.Q Ref: N/A Discipline:
B.O.Q. Description of Works to be inspected and / or tested: General MCC Works
Civil Landscaping
Storm Water Architectural
Description of Works to be inspected and /or tested: Sewer Dredging
Water Highway Bridge Works
Irrigation LRT Bridge Works
Inspection Request for Installation and leak test of Under Telephone MSE Wall
Signal Works Provisional Sum
Ground Drainage Pipes , As per Attached Highlighted Drawing
Electrical Other (state)
Street Lighting
Works Location: Villa-370 4BR (Normal) Landscape Lighting Drainage

Works Quantity: Gas Network

Drawing attached to show the location(s) Yes No Checklist attached Yes No


Attached Test Certificates Yes No

Shop Drawing Ref: PHP1P2-BW-TGC-4TV.M-00-SD-DR-0001 Method Statement Ref: RHP1P2-BW-TGC-ZZ-XX-MS-ME-00002_00

Type of Attachment: Check list ITP Ref: ITP-01-Rev-0

Eng. Dayal Pushpakumar


(QA/QC Manager )

Date & Signature


Part B: By the Engineer:
Received by Engineer on: Date: Time: Signed by:
Engineer's Comments:

1.Separate WIR shall be submitted for the remaining piping upon completion.
2.There is no surveyor marking provided for the outlets (FD/FCO/SD/WC etc.). Instead, verification is done from the
respective grid lines only.
3.All outlets (FD/FCO/WC/SD etc.) shall be matching with the approved tiling layout. The Contractor will remain responsible
for any modification, at no extra time/ cost tothe project, if the piping is not matching as per the latest approved respective
tile layout drawings.
4.The floor drain, floor clean out, WC piping and pipe riser shall be provided at floor penetration with polystyrene or any
other feasible material, for future flexibility.
5.Contractor shall maintain the water within the pipes to ensure that there are no damages occurs during the civil activities
on the site.
6.Branch piping connection from FD to main line, to be laid at max higher level, in sense to avoid reverse flow through floor
trap. Also avoid steep slope in the branch piping.

Name: Date & Signature


Discipline Engineer Decision:
A - Approved
25-06-2024
B - Approved with comments

C - Revise & Resubmit

D - Rejected

Sr.Resident Engineer / Resident Engineer :

Name : Suheib Aboamir 26/06/2024 Date & Signature