Time of Concentration, tc = to + td
Where,
                    L = Overland sheet flow path length (m) =                             59.70 m
                    n = Manning's roughness value for the surface =                       0.035 (Table 2.2 MSMA 2)
                    S = Slope of overland surface (%) =                                 256.000
                                         107 x 0.011 x 8.801/3
                                 =
                                                3.331/5
                               to=             4.83 min
Where,
                    L = Length of reach (m) =                                        6          m
                    n = Manning's roughness coefficient =                            0.035      (Table 2.3 MSMA 2)
                    S = Friction slope (m/m) =                                       0.0033
                    R = Hydraulic radius (m) =                                       1.104      m
Flow time in channel, td =                                        n x Ld
                                                              60 x R2/3 x S1/2
                                     =                          0.011 x 83
                                                          60 x 0.5332/3 x 0.0021/2
                                     =                        0.06 min
                         tc = tcs = to + td
                                 =             4.89 min (Assume 10 min)
Major storm =                                            10 years
Rainfall intensity =                                 232.83 mm/hr
Runoff coefficient,                 C = 0.35 (Open space - Bush Cover, 0.40 - Grass cover)
                                      = 0.90 (Commercial & Business Centre)
                       Qy =                  cxixA
                                                                                 Rational Method
                                                360
   Development                 Impervious Area                      Pervious Area                          I         Q
      Status                                                                                  CA
                              C           A (m2)                  C           A (m2)                    (mm/hr)    (l/s)
Pre-development               0.9                       -         0.4       122,200.00       48,880.0     232.8   3,161.3
Post-development              0.9                    97,760       0.5         24,440.00     100,204.0     232.8   6,480.6
                              Qpost             >            Qpre, SUSToM facilities is required
Using Equation 19.1 with Equation 19.1a and 19.1b for below ground storage (MSMA)
                                    a - (a2 - 4b)
             PSD =
                                          2
                a=
                   =    5539.66 *             ( 1.62 +          3.50 +          6.50 )
                   =    64,395.15
                 b = 8.548 Qa Qp
                   =           8.55 *        6480.65 *          3,161.29
                   =                    175,124,755.76
             PSD =          64,395.15 - (64,395.15 - 4 x 175,124,755.76)
                                                  2
                   =     2,845.25 l/s
     70% PSD is adopted for tank sizing, PSD70 =                2845.25 * 0.7
                                                         =       1991.67 l/s