Modern Building Contracting LLC
Health Safety and Environment
HSE Temporary Induction Record
Vg
Location: Al Barsha South Third
Project: Proposed G+2 &G+6 Residential Building & Retail Building Dubai, UAE.
Company name: EMT /JUBAILI BROS Date: 14 - 02 - 2024 Time: 6:30AM
Topics to be discussed during HSE Induction:
- Company HSE Policy - Accident Prevention &
- Project details Reporting - Traffic Management
- First Aid/Medical Facilities - Working at heights - Confined Spaces
- Welfare facility - Scaffolding (and tags) - Hazardous Materials
- Emergency Procedure & contact - Housekeeping (COSHH)
Numbers - Crane Operations - Competency
- Smoking Policy - Environmental Protection - Waste Management
- Fire Prevention - Excavation Safety - PPE
- Work Permits - Electrical Safety - Attendee Questions
- Hot Works - Electrical and Hand Tools
I/We hereby agree to adhere to the Health Safety and Environmental outlined during the workplace HSE induction and will comply with instructions of the
company. I understand and agree that my failure to comply with the HSE rules and regulations presented during induction are ground for my immediate
violation penalty or dismissal.
SIGNATUR
S/N NAME EMPLOYEE ID DESIGNATION
E
DOMMUEL GIM BIHAG GURAPO 784-1998-5417-0937 GENERATOR
1
TECH
SURJIT KUMAR GURBACHAN 784-1997-0879-0421 GENERATOR
2 CHAND TECH
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Modern Building Contracting LLC
Health Safety and Environment
HSE Temporary Induction Record
Vg
Conducted By Safety Officer: Signature