Percentage Boq: Validate Print Help

23 estimate

Uploaded by

santosh yevvari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views11 pages

Percentage Boq: Validate Print Help

23 estimate

Uploaded by

santosh yevvari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

Validate Print Help Percentage BoQ

Tender Inviting Authority: MANAGING DIRECTOR OF OCC LTD.

Name of Work: Construction of Concrete Dam and Spillway Component Structure of Chheligada Irrigation Project

Contract No: e-procurement notice No. 10/OCCL/2024-25 (on-line)

Name of the
Bidder/
Bidding Firm /
Company :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the
Bidder Name and Values only )

NUMBER # TEXT # NUMBER # TEXT # NUMBER NUMBER # TEXT #


Sl. Item Description Quantity Units Estimated Rate TOTAL AMOUNT Without Taxes in TOTAL AMOUNT
No. in Rs. P In Words
Rs. P

1 2 3 4 5 6 7
1 Clearing and grubbing road land including uprooting rank vegetation, 60.700 Ha. 110011.60 6677704.12 INR Sixty Six Lakh Seventy Seven Thousand Seven
grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal Hundred & Four and Paise Twelve Only
of stumps of trees cut earlier and disposal of unserviceable materials
and stacking of serviceable material to be used or auctioned, with all
leads and lifts including removal and disposal of top organic soil with
all labours T&P, Cess etc. complete as per direction of Engineer-in-
charge.

2 Cutting of trees and removing the cut trees 900 to 1800mm girth 300.00 Each 1257.90 377370.00 INR Three Lakh Seventy Seven Thousand Three
making good to the damage to ground and clearing the debris clear Hundred & Seventy Only
from work site with supply of all equipments T&P ,labour required for
the work including all taxes to complete in all respect as per the
direction of Engineer-in-charge.
3 Excavation of foundation in all kinds of soil including stoney earth but 46333.679 Cum 83.70 3878128.93 INR Thirty Eight Lakh Seventy Eight Thousand One
excluding all kinds of rocks by mechanical means loading into and Hundred & Twenty Eight and Paise Ninety Three Only
transportation by mechanical means and unloading the soil with all
leads & lift,s delifts in the dumping area as specified including levelling
the same in all heights including all lifts,delift and rough dressing to
sides and bed of the excavated area with construction,maintainace
and removal of cofferdam, haul roads dewatering, lighting the
excavated area including mobilisation and demobilisation with all
incidental charges, Labour Cess etc.complete in all respect.and as per
direction of Engineer-in-charge.
4 Excavation of foundation in all types of D.I. rocks by mechanical means 47341.115 Cum 104.80 4961348.85 INR Forty Nine Lakh Sixty One Thousand Three
not requiring blasting to be removed by pickaxes and crowbars in both Hundred & Forty Eight and Paise Eighty Five Only
wet and dry condition including shuttering ,propping bullah,piling,and
removal of cofferdam, dewatering if required, rough dressing and
depositing the excavated materials with all leads, lifts/delifts in the
dumping area with all leads as specified including levelling the same in
all heights and rough dressing to the useful materials including hire and
running charges of all machineries, mobilisation and demobilisation
with all incidental charges, Cess etc.complete in all respect.and as per
direction of Engineer-in-charge.

5 Excavation in foundation in hard rock of all toughtness and boulders 45571.769 Cum 545.70 24868514.34 INR Two Crore Forty Eight Lakh Sixty Eight Thousand
above 0.03 cum in volume within 50 meter initial lead and 1.5 meter Five Hundred & Fourteen and Paise Thirty Four Only
initial lift including rough dressing as per specification of the
department including stacking useful stones and disposal of rock
manually with all lead, lifts, delifts & desposing the debries away from
the work site with all leads including hire and running charges of all
mechinaries, Mobilisation & demobilisation including construction and
removal of cofferdam with all labour, T&P, Cess etc.complete in all
respect.and as per specification and direction of Engineer-in-charge
(Recovery of useful materials of all size with normally be 0.70
cum/cum of excavation measures in dump condition at sites)

6 Excavation of Hard rock with rock breaker(Blasting prohibited) in canal 5063.530 Cum 928.00 4698955.84 INR Forty Six Lakh Ninety Eight Thousand Nine
of all toughness in canal and cutoff trench of canal and other deep Hundred & Fifty Five and Paise Eighty Four Only
cutting sections by mechanical means with initial lead, lift and delifts,
loading into and transportation by transport vehicle with all leads and
depositing the excavated materials neatly in specified dump yard and
spreading by Dozer including all incidental charges, T&P, Cess etc.
complete as per specifications and as directed by the Engineer-in-
charge and trimming of bed and slope to the design finished section by
manually, if necessary complete. (Recovery of useful materials of all
size with normally be 0.50 cum/cum of excavation measures in
dump condition at sites)

7 Preparation of foundation bed of spillway by wedging and barring in 2381.478 Cum 2264.90 5393809.52 INR Fifty Three Lakh Ninety Three Thousand Eight
hard rock including removal of loose rock by manual/mechanical Hundred & Nine and Paise Fifty Two Only
means including stacking of useful materials in regular stacks by
manual/mechanical means with all leads/lifts/delifts including cost of
dewatering including all incidental charges, Cess etc. complete as per
direction of Engineer-in-charge.

8 Preparation of foundation in hard rock requiring chiselling 7938.260 Sqm. 292.41 2321226.61 INR Twenty Three Lakh Twenty One Thousand Two
hammering, tempering, brushing, air & water jetting by Hundred & Twenty Six and Paise Sixty One Only
mechanical/manual means including hire and running charges of all
equipments and T&P etc. complete for dams and spillway works over
rock foundation including stacking of useful materials and disposal of
debris if any by manual/mechanical means with cost of dewatering,
lighting, all incidental charges, Cess etc. complete as per the direction
of Engineer-in-charge.
9 Clearance of slush and muck from foundation pit by manual means 23814.780 Cum 345.00 8216099.10 INR Eighty Two Lakh Sixteen Thousand &Ninety Nine
including removal of debris with all leads and lifts including cost of all and Paise Ten Only
labour, cess etc. as directed by the Engineer-in-charge.
10 Excavation in any approved type of soil in approved borrow areas by 132909.95 Cum 172.10 22873802.40 INR Two Crore Twenty Eight Lakh Seventy Three
mechanical means including stripping of borrow area and borrowing Thousand Eight Hundred & Two and Paise Forty Only
earth within 3 Km. lead to the work site as required for the work
including cost of construction and maintenance of haul roads and
approach roads from the borrow area to work site including watering if
required in borrow area loading and transporting the excavated
materials by mechanical means and laying on properly prepared and
scientifically approved surface having 0.6 m to 0.90 m extra width on
both side of the embankment beyond design section of bank of canal
in filling reaches and levelling the earth in 22.5 cm layer by mechanical
means including rehandiling the soil if required ( to make the fill ready
for watering and compaction) to proper shape & size with all leads, lifts,
delifts and cost of dewatering if any cost of all materials all taxes on
materials including the cost of mobilisation and demobilisation
supplying operation maintenance of all machineries equipments and
labour required for the work inclusive of supervision charges complete
including cost of all labour, materials, royalty, EMF, DMF, additional
charges as applicable as per direction of Engineer-in-charge complete
in all respect (Payment will be made on finished design section,
contractor has to arrange borrow earth at his own cost.)

11 Watering earth work up to OMC condition and compaction by sheep 132909.95 Cum 47.20 6273349.64 INR Sixty Two Lakh Seventy Three Thousand Three
foot rollers or vibro roller and dozer or by any other mechanical means Hundred & Forty Nine and Paise Sixty Four Only
in layers not exceeding 22.5 cm to required density to achieve 95%
compaction including hire and running charges of all machineries
including cost of fuel and lubricants, with cost of mobilisation,
demobilisation, cess and all incidental charges to complete the item of
work as per direction of the Engineer-in-charge. (measurement to be
taken on finished compacted section of the fill under O.M.C. condition)

12 Providing and placing in position Plain Cement Concrete (PCC) M-15 46693.67 Cum 6945.67 324318822.91 INR Thirty Two Crore Forty Three Lakh Eighteen
grade with crushed granite coarse aggregate (CB ) of size 80mm down Thousand Eight Hundred & Twenty Two and Paise
grade mixed in batching and mixing plant, transporting mixed concrete Ninety One Only
by machanical means using Tower Crane / Excavator and with cooling
of concrete arrangements including cost of all materials,admixture,
labour and machineries, including cost ,carriage, royalty, DMF, EMF,
Additional charges as applicable, taxes, cess etc , vibrating, finishing,
curing, clearing the site with all leads, lifts and delifts for all materials
as per approved drawings and specifications in sub- structure and
super structure of the flared out walls etc. of the Dam, Spillway, Head
Regulator including cost of construction, maintenance and dismantiling
of coffer dam & illuminations, cleaning of slush & muck etc dewatering
with all incidental charges complete and as per the direction of
Engineer-in-Charge.
13 Reinforced Cement Concrete M-25 grade with 20mm downgraded size 1325.55 Cum 7323.81 9708076.35 INR Ninety Seven Lakh Eight Thousand &Seventy Six
hard granite (CB) aggregates free from weathered surfaces ,dust and and Paise Thirty Five Only
any other deleterious materials including cost ,carriage, royalty,DMF,
EMF, Additional charges as applicable, taxes, cess etc of all materials
(except cost of reinforcement MS bar) including machine mixing ,cost
of all labour with all leads ,lifts ,delifts of materials upto mixing yard
,transportation of mixed concrete with all leads, lifts,delifts by
mechanical means for hoisting and placement in position with cooling
of concrete and watering, compaction with vibrator for smooth surface
with cost of hire and running charges of all machineries, dewatering if
required with construction and removal of cofferdam , curing,
illumination, dewatering, cleaning of slush and muck, etc complete as
per specification ,drawing etc.complete as per direction of Engineer-in-
Charge.

14 Reinforced Cement Concrete M-25 grade with 40mm downgraded size 63451.015 Cum 7867.91 499226875.43 INR Forty Nine Crore Ninety Two Lakh Twenty Six
hard granite (CB) aggregates free from weathered surfaces ,dust and Thousand Eight Hundred & Seventy Five and Paise
any other deleterious materials including cost ,carriage, royalty, DMF, Forty Three Only
EMF, Additional charges as applicable, taxes, cess of all materials
(except cost of reinforcement MS bar)including machine mixing ,cost of
all labour with all leads ,lifts ,delifts of materials upto mixing yard
,transportation of mixed concrete with all leads, lifts,delifts by
mechanical means for hoisting and placement in position with cooling
of concrete and watering, compaction with vibrator for smooth surface
with cost of hire and running charges of all machineries, dewatering if
required with construction and removal of cofferdam , curing,
illumination,dewatering, cleaning of slush and muck, etc complete as
per specification ,drawing etc.complete as per direction of Engineer-in-
Charge.

15 Reinforced Cement Concrete M-20 grade with 40mm downgraded size 4918.23 Cum 6431.38 31631006.06 INR Three Crore Sixteen Lakh Thirty One Thousand
hard granite (CB) aggregates free from weathered surfaces ,dust and &Six and Paise Six Only
any other deleterious materials including cost ,carriage, royalty, DMF,
EMF, Additional charges as applicable, taxes, cess etc of all materials
(except cost of reinforcement MS bar)including machine mixing ,cost of
all labour with all leads ,lifts ,delifts of materials upto mixing yard
,transportation of mixed concrete with all leads, lifts,delifts by
mechanical means for hoisting and placement in position with cooling
of concrete ,watering, compaction with vibrator for smooth surface with
cost of hire and running charges of all machineries, dewatering if
required with construction and removal of cofferdam , curing,
illumination, dewatering, cleaning of slush and muck, etc complete as
per specification ,drawing etc.complete as per direction of Engineer-in-
Charge.
16 Cement Concrete M-30 grade for RCC works with 20mm downgraded 178.09 Cum 7332.30 1305809.31 INR Thirteen Lakh Five Thousand Eight Hundred &
size hard granite (CB) aggts free from weathered surfaces ,dust and Nine and Paise Thirty One Only
any other deleterious materials including rigid and smooth centering &
shuttering, cost ,carriage, royalty, DMF, EMF, Additional charges as
applicable, taxes, cess etc of all materials (Except cost of
reinforcement MS bar) including machine mixing ,cost of all labour with
all leads ,lifts ,delifts of materials upto mixing yard ,transportation of
mixed concrete with all leads, lifts,delifts by mechanical means for
hoisting and placement in position , watering, compaction with vibrator
for smooth surface with cost of hire and running charges of all
machineries, dewatering if required with construction and removal of
cofferdam ,curing,illumination,dewatering, cleaning of slush and muck,
etc including cost ,carriage, royalty, taxes etc complete as per
specification ,drawing etc.complete as per direction of Engineer-in-
Charge .

17 R.C.C. work of M-40 grade with 20mm downgraded size hard granite 5.04 Cum 7527.90 37940.62 INR Thirty Seven Thousand Nine Hundred & Forty and
(CB) aggts free from weathered surfaces ,dust and any other Paise Sixty Two Only
deleterious materials including rigid and smooth centering & shuttering,
cost ,carriage, royalty, DMF, EMF, Additional charges as applicable,
taxes, cess etc of all materials (Except cost of reinforcement MS bar)
including machine mixing ,cost of all labour with all leads ,lifts ,delifts of
materials upto mixing yard ,transportation of mixed concrete with all
leads, lifts,delifts by mechanical means for hoisting and placement in
position , watering, compaction with vibrator for smooth surface with
cost of hire and running charges of all machineries, dewatering if
required with construction and removal of cofferdam
,curing,illumination,dewatering, cleaning of slush and muck, etc
including cost ,carriage, royalty, taxes etc complete as per specification
,drawing etc.complete as per direction of Engineer-in-Charge .
18 Cement Concrete M-50 grade (High performance concrete with 2625.00 Cum 7923.00 20797875.00 INR Two Crore Seven Lakh Ninety Seven Thousand
Silica Fume) cooling with 20mm downgraded size hard granite (CB) Eight Hundred & Seventy Five Only
aggts free from weathered surfaces ,dust and any other deleterious
materials including cost ,carriage, royalty,20mm downgraded size hard
granite (CB) aggts free from weathered surfaces ,dust and any other
deleterious materials including rigid and smooth centering & shuttering,
cost ,carriage, royalty, DMF, EMF, Additional charges as applicable,
taxes, cess etc of all materials (Except cost of reinforcement MS bar)
including machine mixing ,cost of all labour with all leads ,lifts ,delifts of
materials upto mixing yard ,transportation of mixed concrete with all
leads, lifts,delifts by mechanical means for hoisting and placement in
position , watering, compaction with vibrator for smooth surface with
cost of hire and running charges of all machineries, dewatering if
required with construction and removal of cofferdam
,curing,illumination,dewatering, cleaning of slush and muck, etc
including cost ,carriage, royalty, taxes etc complete as per specification
,drawing etc.complete as per direction of Engineer-in-Charge . etc of all
materials (except cost of reinforcement MS bar) including machine
mixing ,cost of all labour with all leads ,lifts ,delifts of materials upto
mixing yard ,transportation of mixed concrete with all leads, lifts,delifts
by mechanical means for hoisting and placement in position, watering,
compaction with vibrator for smooth surface with cost of hire and
running charges of all machineries, dewatering if required with
construction and removal of cofferdam ,curing,illumination,dewatering,
cleaning of slush and muck, etc complete as per specification ,drawing
etc. as per direction of Engineer-in-Charge charge.

19 Straightening, cutting, bending, binding & tying the grills and placing in 23225.69 Qntl 10988.20 255208526.86 INR Twenty Five Crore Fifty Two Lakh Eight Thousand
position for fabrication, fixing of reinforcement including lapping Five Hundred & Twenty Six and Paise Eighty Six Only
whenever necessary, supply of binding wire with all leads and lifts from
bending yard to placement spot including cost of MS rod/tor rod with all
leads lifts and all accessories including mobilisation and demobilisation
of men materials and machineries including cost ,carriage, cess, taxes
etc of all materials etc, and providing illumination if required,
construction of approach road to site including clearance of slush and
muck after rainy seasons etc complete as per direction of Engineer-in
Charge.

20 Providing contraction joint in spillway by installation of two line 'Z' type 463.22 Rmt 12404.70 5746105.13 INR Fifty Seven Lakh Forty Six Thousand One Hundred
copper sealing strips of 1.633mm thickness of approved quality,GI & Five and Paise Thirteen Only
pipes opf 20mm dia and filling with asphalt of approved grade including
necessary fabrication work cost ,conveyance and storage and taxes of
all materials,all labours, cess and machineries required to complete the
work as per specifications and drawings and direction of Engineer-in-
charge.
21 Rough stone dry packing in aprons , revetments and slope to design 1332.00 Cum 2148.72 2862095.04 INR Twenty Eight Lakh Sixty Two Thousand &Ninety
thickness using 15 cm. to 30 cm. Size hard broken granite stone of Five and Paise Four Only
approved quality from approved quarry free from weathered skin and
any other deleterious materials including filling the interstices with
small stones, spalls etc. and wedging with hammer and placing the
surface to proper line and level, fixing key stones including dewatering,
if any with cost, conveyance and with all leads, lifts and delifts,
royalties.DMF, EMF, Additional charges as applicable, Cess and taxes
of all materials and labour, T&P etc complete in all respect as per
approved drawing,specification and direction of the Engineer-in-
Charge.

22 Fixing 32mm dia anchor bars in foundation rock including drilling 16530.00 Rmt 532.10 8795613.00 INR Eighty Seven Lakh Ninety Five Thousand Six
35mm dia holes upto required depth as per specification, wedged Hundred & Thirteen Only
anchor and grouting with cement mortar (1:4) including cost
conveyance & all taxes of materials (except cost of M S rod) and hire
and running charges of all machineries and all labour charges for
spillway structure including pullout testing of at least 30% of anchors
etc. complete, construction of approach road to site including clearance
of slush and muck, cost, conveyance, taxes of all materials, cess etc.
and as per the direction of Engineer-in-charge.

23 Providing weep holes in Brick masonry/Plain/ Reinforced concrete 882.00 Rmt 127.85 112763.70 INR One Lakh Twelve Thousand Seven Hundred &
abutment, wing wall/ return wall with 100mm dia PVC pipe, extending Sixty Three and Paise Seventy Only
through the full width of the structure with slope of 1V:20H towards D/s
face. Complete including cost of all labour, materials, cess etc as per
drawing and Technical Specification.

24 Back filling with sand behind abutment, wing wall and return wall 5040.17 Cum 2501.90 12610001.32 INR One Crore Twenty Six Lakh Ten Thousand &One
complete as per drawing and Technical Specification etc., complete and Paise Thirty Two Only
including cost conveyance, royalty EMF, DMF, additional charges of all
materials, labour, cess etc. complete as per direction of the Engineer-in-
charge.

25 Providing block out in concrete for fixing embedded parts in gate 615.23 Sqm 2134.50 1313208.44 INR Thirteen Lakh Thirteen Thousand Two Hundred &
grooves and other embedment for dams and barrages etc, with Eight and Paise Forty Four Only
wooden flanks with cost of all materials labour charges, cess, T&P
etc,complete including fixing anchor rods complete as directed by
Engineer-in-charge.
26 Supplying, Manufacturing and fixing embedded parts in concrete 166.25 Qntl. 13460.30 2237774.88 INR Twenty Two Lakh Thirty Seven Thousand Seven
including anchoring and placing in specified position including supply of Hundred & Seventy Four and Paise Eighty Eight Only
all materials, labour, T&P, cess etc for manufacturing embedded parts,
as per design and fixing in position in proper alignment by welding
rigidly to reinforcement as directed by Engineer in charge.

27 Providing form work for concrete with F1 finish for upstream faces of 11593.00 Sqm 1137.50 13187037.50 INR One Crore Thirty One Lakh Eighty Seven
dam, spillway,Head Regulators unexposed surfaces of foundation, Thousand &Thirty Seven and Paise Fifty Only
block joints etc. with steel shutters rigidly fixed and removal of forms
and making good to the surfaces where necessary complete with all
labour, materials, cess and T&P complete as directed by Engineer in
charge.
28 Providing form work for concrete with F2 finish for all permanantly 40912.77 Sqm 1233.70 50474084.35 INR Five Crore Four Lakh Seventy Four Thousand
exposed surface to public view such as in Concrete Dam , bridge, &Eighty Four and Paise Thirty Five Only
retaining walls, spillway, Head Regulators with steel shutter, or ply
wood shutter including supply or rigid tie and supports with all labour
materials & and T&P, cess complete including finishing complete as
directed by Engineer in charge.

29 Providing form work for concrete with F2 finish for all permanantly 1413.68 Sqm 1260.30 1781660.90 INR Seventeen Lakh Eighty One Thousand Six
exposed surface to public view such as in Bucket, Ogee, Pier, Noses Hundred & Sixty and Paise Ninety Only
and other Curved surfaces with steel shutter or ply wood shutter
including supply or rigid tie and supports with all labour materials & and
T&P, cess complete including finishing complete as directed by
Engineer in charge.

30 Providing,fitting,fixing angle iron expansion joints with MS angle of size 92.80 Rmt 3114.50 289025.60 INR Two Lakh Eighty Nine Thousand &Twenty Five
75mm x75mm x 6mm thick M.S plate and 12mm dia HYSD bars, and Paise Sixty Only
including all labour materials and T&P, cess complete as directed by
Engineer in charge.

31 Providing & fixing 25mm Bitumenous board in contraction joints 17.65 Sqm. 1604.90 28326.49 INR Twenty Eight Thousand Three Hundred & Twenty
including all cost, carriage, all labour materials & T&P, cess complete Six and Paise Forty Nine Only
as directed by Engineer in charge.

32 Providing & fixing Neoprene bearing on piers to receive beam of the 42.00 Each 11596.50 487053.00 INR Four Lakh Eighty Seven Thousand &Fifty Three
bridge including cost, carriage, including all labour materials, cess & Only
and T&P complete as directed by Engineer in charge.

33 Providing PVC water stop for drainage gallery as per approved design 1516.01 Rmt 1223.90 1855444.64 INR Eighteen Lakh Fifty Five Thousand Four Hundred
including fixing in proper alignment joining with araldite etc including & Forty Four and Paise Sixty Four Only
cost of PVC water stop and all labour materials & and T&P, cess
complete as directed by Engineer in charge as directed by the
Engineer-in-charge.

34 Pressure drilling by suitable drill machine with NX/BX size drill holes 13581.33 Rmt 12201.56 165713412.87 INR Sixteen Crore Fifty Seven Lakh Thirteen Thousand
either vertical or inclined with all accessories for drilling in rock/ Four Hundred & Twelve and Paise Eighty Seven Only
concrete etc.complete including transportation for cosolidation
grouting, running maintenance of equipments, cost of drilling bits & and
other consumable materials etc. and positioning of drilling machines,
arrangement of water supply for drilling including mobilisation and
demobilisation of men/ materials, cess etc complete as per direction of
Engineer-in-charge.

35 Consolidation pressure grouting in drill holes using NX/BX size facers 5521.90 Rmt 5014.80 27691224.12 INR Two Crore Seventy Six Lakh Ninety One Thousand
in upper and lower up the packer rods at a suitable interval with Two Hundred & Twenty Four and Paise Twelve Only
cement in a proportion fixed by the Dept. with water and agitating the
mix continuously including ,transportation, hire and running charges of
grout pump set etc, arrangement of water supply and its carriage to
work site and cost of all other materials, equipments excluding cost of
cement etc, including dewatering and making necessary diversion etc
complete including cess as directed by Engineer-in Charge.(Inside
Drainage Gallery)

36 Pre and post water loss test in drill holes using NX/BX size facers in 2936.00 Rmt 3707.60 10885513.60 INR One Crore Eight Lakh Eighty Five Thousand Five
upper and lower up the packer rods at a suitable interval with water Hundred & Thirteen and Paise Sixty Only
including ,transportation, hire and running charges of test equipments,
arrangement of water supply and its carriage to work site and cost of all
other materials & labour, cess etc complete as directed by Engineer-in
Charge.
37 Supply of PSC/OPC cement grade of approved brand confirming to IS 11044.00 Bag 405.78 4481434.32 INR Forty Four Lakh Eighty One Thousand Four
specification including cost, conveyance and all taxes with all leads lifts Hundred & Thirty Four and Paise Thirty Two Only
etc. required for consolidation grouting as per direction of Engineer-in-
Charge.

38 Providing RCC railings in bridges, spillways as per IRC standard 200.00 Rmt. 2201.10 440220.00 INR Four Lakh Forty Thousand Two Hundred & Twenty
design and specification with CC M-15 grade with hard granite chips Only
20mm downgraded size including cost of centering, shuttering with
cost, conveyance royalty, DMF, EMF, additional charges & all taxes of
all materials., cess etc. required to complete the work as per
specification, drawing and direction of Engineer-in
Charge.etc.complete.

39 Providing porus cement concrete blocks of size 0.69x0.69 M cross 1451.20 Mtr. 2894.00 4199772.80 INR Forty One Lakh Ninety Nine Thousand Seven
section with 23 cm dia holes with porus concrete(1:3:5) proportion with Hundred & Seventy Two and Paise Eighty Only
20mm downgraded aggregates with all leads and all heights from
ground level of spillway including cost conveyance and all taxes of all
materials , royalty, DMF, EMF shuttering positioning in dam spillway
with all labours T & p and machineries required to complete the work
including curing etc complete as per direction of Engineer-in Charge.

40 Providing and painting two coats of bituminous paints in contraction 8558.51 Sqm. 100.30 858418.55 INR Eight Lakh Fifty Eight Thousand Four Hundred &
Joints (Longitudinal & transverse) including cost carriage,all taxes, Eighteen and Paise Fifty Five Only
cess etc. complete as per direction of Engineer-in-charge.

41 Manufacturing 1000mm dia vent pipes from 3.15mm thick M.S. plates 96.60 Sqm. 7119.40 687734.04 INR Six Lakh Eighty Seven Thousand Seven Hundred
and embeding the same in concrete or masonry in dam including & Thirty Four and Paise Four Only
necessary supporting arrangement before embedment and cost,
conveyance, all taxes cess etc., complete as directed by the Enginee-
in-charge.

42 Manufacturing 500mm dia vent pipes from 3.15mm thick M.S. plates 89.10 Rmt 3844.30 342527.13 INR Three Lakh Forty Two Thousand Five Hundred &
and embeding the same in concrete or masonry in dam including Twenty Seven and Paise Thirteen Only
necessary supporting arrangement before embedment and cost,
conveyance, all taxes etc., complete as directed by the Enginee-in-
charge.
43 Manufacturing 300mm dia vent pipes from 3.15mm thick M.S. plates 320.90 Rmt 2543.90 816337.51 INR Eight Lakh Sixteen Thousand Three Hundred &
and embeding the same in concrete or masonry in dam including Thirty Seven and Paise Fifty One Only
necessary supporting arrangement before embedment and cost,
conveyance, all taxes etc., complete as directed by the Enginee-in-
charge.
44 Providing 200mm dia MS pipe of approved quality and embedding the 84.00 Rmt 1893.10 159020.40 INR One Lakh Fifty Nine Thousand &Twenty and
same in concrete in spillway including providing necessary supporting Paise Forty Only
arrangements before embedment including cost, conveyance and all
taxes of materials and labours with all leads/lifts/delifts, cess, T&P
machineries required to complete the work as per the specification
drawing and direction of the Engr-in-charge.

45 Providing 200 x 100 dia GI reducer socket of approved quality and 84.00 Rmt 1600.00 134400.00 INR One Lakh Thirty Four Thousand Four Hundred
embedding the same in drainage gallary of spillway including providing Only
necessary supporting arrangement before embedging including cost of
conveyance and all taxes all materials, cess and all labour with all lead
etc.complete as per the specification drawing and direction of the
Engineer-in-charge.
46 Providing 100mm dia G.I.pipes of approved quality and embedding 126.00 Mtr. 1952.50 246015.00 INR Two Lakh Forty Six Thousand &Fifteen Only
the same in concrete in spillway including providing necessary
supporting arrangements before embedment including cost,
conveyance and all taxes of materials and labours with all
leads/lifts/delifts, cess T&P machineries required to complete the work
as per the specification drawing and direction of the Engr-in-charge.

47 Providing 100mm dia GI cap and 100 mm dia coupling of approved 84.00 Nos. 995.40 83613.60 INR Eighty Three Thousand Six Hundred & Thirteen
quality and embedding the same in drainage gallary of spillway and Paise Sixty Only
including providing necessary supporting arrangement before
embedding including cost, conveyance and all taxes, cess all materials
and all labour with all lead etc. complete. as per the specification
drawing and direction of the Engineer-in-charge.

48 Providing 100 mm dia MS pipes of approved quality and embedding 193.20 Mtr. 1665.60 321793.92 INR Three Lakh Twenty One Thousand Seven Hundred
the same in concrete in spillway including providing necessary & Ninety Three and Paise Ninety Two Only
supporting arrangement before embedding including cost, conveyance,
all taxes, all materials and labour, cess with all leads etc. complete. as
per the specification drawing and direction of the Engineer-in-charge.

49 Providing 100 x 50 dia GI Tee of approved quality and embedding the 84.00 Nos. 2626.20 220600.80 INR Two Lakh Twenty Thousand Six Hundred and
same in drainage gallary of spillway including providing necessary Paise Eighty Only
supporting arrangement before embedding including cost of
conveyance and all taxes all materials, cess and all labour with all lead
etc. complete.as per the specification drawing and direction of the
Engineer-in-charge.
50 Providing 50mm dia GI pipes of approved quality and embedding the 117.60 Mtr. 840.90 98889.84 INR Ninety Eight Thousand Eight Hundred & Eighty
same in concrete in spillway including providing necessary supporting Nine and Paise Eighty Four Only
arrangements before embedment including cost, conveyance and all
taxes of materials and labours with all leads/lifts/delifts T&P
machineries, cess required to complete the work as per the
specification drawing and direction of the Engr-in-charge.

51 Providing porus cement concrete with porus concrete(1:3.5) proportion 79.50 Cum 6049.60 480943.20 INR Four Lakh Eighty Thousand Nine Hundred & Forty
with 20mm downgraded aggregates with all leads and all heights from Three and Paise Twenty Only
ground level of spillway including cost conveyance and all taxes of all
materials , shuttering positioning in dam spillway with all labours T & P
and machineries, cess, royalty, DMF, EMF, Additional charges required
to complete the work including curing etc complete as per direction of
Engineer-in Charge.

52 Provision for 100mm dia PVC pipe 119.25 Mtr. 740.00 88245.00 INR Eighty Eight Thousand Two Hundred & Forty Five
Only
53 Providing Tar Paper in Spillway with cost of all materials & labour, 95.76 Sqm. 106.90 10236.74 INR Ten Thousand Two Hundred & Thirty Six and
conveyance, leads, lifts & delifts, cess, taxes of all materials with Paise Seventy Four Only
incidental charges etc. complete as per specification, drawing and the
direction of Engineer-in-Charge.
54 Provision for dewatering

55 a) By 5 HP Pump (Deisel) 4536.00 Hr. 233.11 1057386.96 INR Ten Lakh Fifty Seven Thousand Three Hundred &
Eighty Six and Paise Ninety Six Only
56 b) By 10 HP Pump (Deisel) 3780.00 Hr. 343.10 1296918.00 INR Twelve Lakh Ninety Six Thousand Nine Hundred &
Eighteen Only
57 c) By 20 HP Pump (Deisel) 3780.00 Hr. 557.52 2107425.60 INR Twenty One Lakh Seven Thousand Four Hundred
& Twenty Five and Paise Sixty Only
58 d) By 40 HP Pump (Deisel) 3024.00 Hr. 836.28 2528910.72 INR Twenty Five Lakh Twenty Eight Thousand Nine
Hundred & Ten and Paise Seventy Two Only
59 Supplying , laying and collar jointing RCC spun pipes (NP3) with 100.00 Mtr. 9720.50 972050.00 INR Nine Lakh Seventy Two Thousand &Fifty Only
necessary twisted and coltared hemp yarn including caulking and filling
with cement mortar (1:1) and finishing the same smooth and curing
including, cost, conveyance, taxes, royalty, EMP, DMF, Additional
charges as applicable, cost of labour, cess with all leads and lifts
complete as per direction of Engineer-in-Charge.

60 Provision for Instrument in the instrumentation Gallery


61 a) Pore Pressure Meter 6.00 Nos. 65000.00 390000.00 INR Three Lakh Ninety Thousand Only
62 b) Stress Meter 5.00 Nos. 65000.00 325000.00 INR Three Lakh Twenty Five Thousand Only
63 c) Temperature Meter 8.00 Nos. 26000.00 208000.00 INR Two Lakh Eight Thousand Only
64 d) Linear Joint Meter 6.00 Nos. 46000.00 276000.00 INR Two Lakh Seventy Six Thousand Only
65 e) Strain Meter 5 in a Group 3.00 Nos. 52000.00 156000.00 INR One Lakh Fifty Six Thousand Only
66 f) No Stress Meter 3.00 Nos. 18000.00 54000.00 INR Fifty Four Thousand Only
67 g) Uplift Pressure Meter 6.00 Nos. 45000.00 270000.00 INR Two Lakh Seventy Thousand Only
68 h) Plumb Line 1.00 No. 1200000.00 1200000.00 INR Twelve Lakh Only
69 i) Inverted Plumb Line 1.00 No. 1200000.00 1200000.00 INR Twelve Lakh Only
70 j) Strong Motion Acceleograph 1.00 No. 1100000.00 1100000.00 INR Eleven Lakh Only
71 Constuction of 11 KV Line with G.I. Joist poles, stays, Disc insulators, 2.00 Km. 1816710.00 3633420.00 INR Thirty Six Lakh Thirty Three Thousand Four
earthing supports, tree cutting, road crossing guarding provision etc Hundred & Twenty Only
with all cost of labour, material etc complete as per direction of
Engineer-in-charge and under the supervision of Electrical H.T.
License Holder.
72 Installation of Online 11 KV AB switch with all fittings and accesorise 1.00 No. 170150.00 170150.00 INR One Lakh Seventy Thousand One Hundred & Fifty
etc with all cost of labour & material etc. complete under supervision of Only
Electrical H.T. Licence Holder and as per direction of Engineer-in-
Charge.
73 Construction of 250 KVA, 11/0.4 KV Plinth mounted S/S with all fixtures 1.00 No. 1213161.00 1213161.00 INR Twelve Lakh Thirteen Thousand One Hundred &
and accessories complete under supervision of Electrical H.T. Licence Sixty One Only
Holder and as per direction of Engineer-in-Charge.

74 The item rates indicated aove work inclusive of cost of all labour,
materials,conveyence,taxes and royality(with EMF,DMF and
additional charges) of materials,labour cess,here and running
charges of all machineries and equipments and other incidental
charges so as to complete the item in all respect as per
specification and direction of Engineer-In-Charge.Accordingly the
bidder has to quote the rates.The rate are exclusive of GST as
applicable.

Total in Figures 1570674211.60 INR One Hundred Fifty Seven Crore Six Lakh Seventy
Four Thousand Two Hundred & Eleven and Paise Sixty
Only

Quoted Rate in Figures Select 0.000 INR Zero Only