TMH 112,121
TMH 112,121
TMH 118
TMH-117
TMH 117
TMH-116
TMH 116
LSC-1 SUPPLY FROM SS-01/FP-01
SUPPLY FROM SS-01/FP-01
LSC-1
WITH SAND
FOOT TRAP
WASH
DRAIN
IL= -770
TMH-115
115
WASH
DRAIN
ø80MM
FOOT
IL= -480 IL= -480
TMH
Ø63
Ø100 UPVC
Ø65 PWS IL= -490 RWP @
F/A U/G
IL= -490
WASH
49
DRAIN
ø80MM
52
FOOT BY MEP INFRAS
TRUCTU
Ø65 PWS FOR CONTIN RE DRAWIN
UATION G
REFER
7
53
IL= -780
3
56
LW3
50
1
3
51
IL= -750
LW1
BY INFRA
IL=
Ø65 UPVC -58
RWP @ 0
Ø100 UPVC U/G
54
IL= -710 RWP @
4
IL= -490
55
IL= -480 U/G
2
IL= -740 Ø10
6
IL= -720 0 UP
IL= -750 VC
Ø65 PWS IL= -710 Ø65 RWP RW
F/A P@
IL= -770 WF ACCESS U/G
Ø100 UPVC
ORIES RWP @
U/G
Ø100 UPVC
7
ø 200mm
11
EXHAUS RWP @ IL= -700
5
12
T AIR DUCT U/G IL= -680
IL= -480 2 Ø65 RWP Ø65 RWP
10
IL= -680 IL= -710 F/A F/A
LW1
CO
IL= -600
14
15
IL= -480 Ø6
IL= -550 5 RW
89
IL= -480 Ø65 RWP
IL= -900 IL= -2790 F/A P F/A
Ø65 RWP
F/A Ø65 IL=
Ø65 UPVC -75
RWP @ UP 0
FROM SUMP U/G VC
SWIMM PIT IL= -650 PW BY
ø65MM ING S@
16
PRESSU POOL U/G P
ME
Ø65
RE PIPE
IL= -770 UP
4
VC
RW
78
Ø65 RWP
P@
72
F/A Ø80 UPVC
RWP @ U/G IL=
IL= -480 U/G IL= -54
-77 0
250mm THK. Raft IL= -660 0
IL= -770
77
7
IL= -660
POINT OUT TO POD AD
OF CONNE CONTR
CTION ACTOR INF
IL= -660 WITH FO RASTR
Ø40 WP STUB
IL= -240 R CO
IL= -480 F/A UC
NTI TUR
NU
IL= -560 ATI E DR BY
IL= -480 IL= -480 IL= -240 IL= -510 ON AW INF
41
RE ING
LW1
RA
30
LW1
FER
IL= -630
Ø65 UPVC IL= -280
RWP @ IL= -700 IL= -830 4BD
U/G Out -WV
13
IL= -550 2 1 OUT TO Ø80 UPVC BY MEP doo
-26
IL= -490 200mm
LW1 THK. RAFT 2 POINT r Sto
OF CONNE POD CONTR WP @ 2
42
Ø80 RWP IL= -660 CO FD U/G rag
3150
WITH IL= -800 F/A CO CTION ACTOR e
FOOT SAND WITH Ø100 UPVC CO
IL= -480 Ø80 RWP STUB
8
52
IL= -580 2
33
WASH TRAP LW1 Ø100 UPVC
46
IL= -490
88
Ø65 RWP F/A SP IL= -880 2
WP @
73
DRAI WF VACUUM U/G
4
N F/A CO @ U/G
36
IL= -870 250mm THK. Raft FITTING CO
SAND
83
IL= -770 BUCKET SHOWE 5 INFRAS
17
32
18
IL= -690 R DRAIN IL= -590 IL= -590 TRUCTU
WITH IL= -270 CO FOR CONTIN RE DRAWIN
SEE NOTE UATION G IL= -860
IL= -480 8 REFER
IL= -590 Ø80 UPVC Ø80 UPVC Ø100 UPVC
34
Ø100 UPVC
LW1 LW1 RWP @ WP @
Ø100 UPVC SP @ U/G
IL= -600 IL= -850 Ø80 RWP RWP @
U/G U/G U/G IL=
90
19
2 250mm THK. Raft Ø65 RWP IL= -860 WP @ F/A IL= -880 -26
37
69
F/A U/G Ø80 RWP 0
84
35
CO IL= -550 Ø80 RWP Ø100 UPVC IL= -870 F/A
LW1
WAS Ø100
IL= -710 IL= -890 250mm THK. Raft 37-A Ø80 RWP IL= -790 Ø80 RWP
ø80M H DRAI RWP
UPVC
IL= -680
F/A
IL= -730 1 F/A SP @ U/G Ø100 UPVC F/A IL= -870
M FOOTN IL= -480 @ U/G Ø80 UPVC WP BY INFRA
Ø100 UPVC @ U/G Ø80 RWP
LW1
20
38
37-A U/G IL= -610 SP @ U/G F/A
LW1
39
IL= -740
IL= -490 LW1 IL= -480 IL= -660 2 IL= -950 IL= -880 IL= -600 IL= -610 IL= -830
INFR
IL= -750 IL= -690 37-B Ø80 UPVC
Ø63 ASTR IL= -790 Ø80 RWP WP @ IL= -670 CO IL= -920 IL= -860
86
FOR UCTU F/A U/G
BY MEP CONT RE IL= -650
INUA DRAW IL= -480 37-B IL= -630 IL= -410
85
Ø65 IL= -490 IL= -720
87
TION ING IL= -490
68
43
F/A REFE IL= -650 250mm THK. Raft Ø80 UPVC Ø63 UPVC
R IL= -550 IL= -690 RWP @ Ø100 UPVC FILTERA
U/G TION PIPE 2
70
IL= -710 IL= -600 Ø80 UPVC RWP @ Ø63 UPVC Ø100 UPVC Ø100 UPVC
IL= -870 U/G IL= -670 @ U/G IL= -940 WP @ RWP @ CO
Ø80 UPVC RWP @
44
FILTERA
51
IL= -660 RWP @ IL= -700 U/G Ø80 RWP TION PIPE U/G U/G
45
IL= -780 IL= -550 IL= -660 U/G F/A @ U/G IL= -950 IL= -490 2
Ø65 UPVC Ø63 CO
Ø100 UPVC IL= -700 IL= -870 PWS @
Ø80 UPVC IL= -730 U/G UP
IL= -750 LW1 WP @ Ø100 UPVC SP @ VC
WAS
IL= -750
BY INFRA LW1 IL= -680 U/G WP @ U/G Ø65
ø80M H DRAI UPVC
Ø65
Ø100 UPVC
U/G
UP
M FOOTN
1
U/G S@
89
LW1 ---
SECTION SLP BY INFRA IL= -790 IL= -990 IL= -480
LW1 Ø80 UPVC U/G
ROOM Ø100 UPVC Ø100 WP @
47
IL= -840
91
Ø100 IL= -750 IL= -550 WP F/A IL= -740 U/G
RWP
UPVC
IL= -560
PUMP 6 U/G
RWP @
IL= -760 IL= -550 Ø80 RWP
292
@ U/G IL= -640 IL= -680 IL= -780 Ø100 WP F/A IL= -830
Ø65 2 IL= -640 INFRAS F/A IL= -820
IL= -700 TRUCTU
21
RWP IL= -700 IL= -900
F/A CO 2 IL= -790 FOR CONTIN RE DRAWIN IL= -990
3
24
CO REFER
72
1 CO IL= -480
62
IL= -720 FD IL= -960 Ø100 UPVC
5
IL= -410
53
IL= -630 IL= -650 37-02 RWP @ IL= -810
U/G
22
IL= -640 37-03
7
67
Ø100 IL= -590 BY MEP RWP F/A Ø80
UPVC 37.04 IL= -940
RWP 2 SEE NOTE IL= -850 Ø65 UPVC
@ U/G Ø40 UPVC
40
Ø65 8 PWS @
6
28 29
F/A IL= -600 F/A
IL= -490 Ø65 37.04IL= -640 IL= -730 IL= -280 Ø63 UPVC FILTERATION SP @
71
RWP IL= -590 FILTERA PIPE U/G IL=
IL= -710 F/A IL= -670 TION PIPE @ U/G IL= -650 1 IL= -700 Ø80 RWP -750
Ø100 IL= -280 IL= -910 F/A
IL= -480 @ U/G
61
IL= -700 Ø80 RWP FD Ø63 UPVC
4
UPVC
IL= -580 IL= -620
54
Ø65 F/A
IL= -680RWP @ IL= -600
68
PWS Ø100 Ø80 UPVC Ø50 UPVC
Ø80 UPVC IL= -760
9
25
m EXHA 2 IL= -680 IL= -870 U/G IL=
66
U/G Ø100 UPVC
59
WF UST Ø50 RWP -79
INF
Ø65 IL= Ø100 UPVC IL= -760
23
0
11
26
SSOR IL= -550 F/A IL= -240 SP @ U/G IL= -590 IL= -680 U/G R CO
IL= -240 F/A
60
82
IES OF CONNE CONTR PWS @
IL= -610
CTION ACTOR Ø80 U/G NTI UCTUR
UPVC
63
WITH Ø100 UPVC NU
RWP
Ø65 IL= -280 IL= -300 STUB WP @
U/G Ø100 UPVC 4 ATI E DR
IL= -280 Ø80 UPVC SP ON AW
IL= -480 F/A 7 IL= -270 SP F/A
Ø100 WP @@ U/G FCO Ø100 UPVC IL= -720 RE ING
81
IL= -710 WP @ IL= -870 U/G FER
AD U/G RWP @
Ø65 IL= -660 IL= -610 U/G Ø10
80
8
27
UPVC 7 0 UP
IL= -480 RWP IL= -860 VC
12
58
IL= -900 IL= -630 Ø80 SEE NOTE PACKAG
IL= -600 IL= -870 WP F/A E
POIN OUT IL= -600 IL= -900 8 GROUN STRUCTURAL
96
Ø80 T OF TO IL= -340 IL= -530 D CONNE
Ø65 CONN POD CONT IL= -700 IL= -900
65
RWP UPVC IL= -830 IL= -280 IL= -630 CTION Ø63 UPVC
RWP ECTIO RACT IL= -510 IL= -530 SAND IL= -640
57
FROM F/A @ U/G N WITH IL= -630 BUCKET SHOWE Ø80 UPVC NOTE: Ø65 UPVC
OR IL= -1040
13
56
IL= -240 IL= -850 IL= -960 OUT TO 1
PIPE IL= -940 CO OF CONNEPOD CONTR
POINT
FD
IL= -910 IL= -640 ACTOR FD ø80 WP IL= -490
97
IL= -300 IL= -630 CTION U/G SECT Ø100
IL= -620 WITH ION RDV F/A
IL= -830 2 5 IL= -880 IL= -850 STUB
14
95
BY MEP 2 IL= -890 IL= -640 IL= -660
102
IL= -660 UPVC
Ø80 CO CO IL= -860 IL= -1030 RADO RDV @ 09C09
IL= -660 IL= -280 CO IL= -830 Ø80 UPVC Ø80 UPVC -TIE-3 N U/G
103
WP @ IL= -600
67
94
U/G IL= -650 U/G Ø100 UPVC U/G Ø100 MH
2 IL= -610 IL= -530 RWP @ PL-11 V F/A
CO IL= -870 IL= -990 3B 003
76
98
49
WP F/A INFR IL= -530 RDV F/A Ø50 UPVC WP @ -
IL= -880 ASTR IL= -830 IL= -690 U/G
FOR UCTU Ø63 UPVC
101
IL= -630 WP @ VILLA
5 Ø100 RWP
1556
100
Ø100 TION PIPE
64
IL= -630 Ø100 UPVC TION ING IL= -1000 IL= -540 VENT
5 REFE IL= -860 RWP @ @ U/G IL= -600 WATE
1
BY INFRA Ø100 Ø100 SEAMLE Ø80 UPVC Ø100
93
UPVC SP U/G
48 106
@ U/G Ø100 R IL= -940 RDV F/A RWP @ Ø80 RWP R Ø80 MH V F/A
WP @ CO SS STEEL U/G RWP F/A
POIN OUT U/G UPVC SPR @ 2 IL= -910 IL= -470
RWP U/G IL= -630
16
T OF TO IL= -750
CONN POD CONT @ U/G IL= -850
23
74
RWP N WITH INFRAS SPR F/A
6059 58
2 2 FD F/A IL= -580 UATION G 800x800 WITH RAFT E 2944446 RWP @ Ø63 UPVC TION PIPE PWS @
RWP IL= -720
79
x1000
CO CO F/A IL= -870 BY INFRA REFER FIRE VALVE FORmm UNDERREFER TO STRUCT
PACKA 33
N 2822561GE U/G IL= -580 IL= -550 FILTERA @ U/G IL= -1050 IL= -490
U/G
24
104
SEE F/A IL= -480 ER E 2944460 F/A IL= -1050 IL= -380 Ø63 UPVC
NOTE F/A CTION
IL= -640 N 2822563 53
18
55
105
2 Ø100 8 IL= -600
IL= -660 CO IL= -590 UPVC IL= -760 NOTE: IL= -590 404
IL= -610
61
99
RWP WP UPVC F/A IL= -670 Ø80 RWP
75
IL= -860 IL= -840 IL= -590 E 2944451
76
F/A @ U/G WP F/A
53
Ø100
IL= -870 UPVC @ U/G IL= -490
IL= -820 IL= -690 IL= -650 N 2822561 06
29
RWP UM FITTI Ø100 IL= -870 IL= -660 ø50 SPRINK F/A GT REDUC
INF R CO
0
NG
RW
RA NT
SHOW SAND IL= -590 UPVC Ø65 RWP BY MEP LER E PRESSU
@ U/G IL= -820
ST INU
P F/A
N WITH 1
IL= -610 F/A
CT ATION
22
FD
UR
UPVC
Ø1
IL= -490 PWS 4 IL= -640 IL= -600 SS STEEL Ø50 UPVC
INF
E DR RE
00
85
RA
IL= -920
VC
F/A FD
FER
Ø100 CO
RW
UPVC
U/G
51
-75
25
IL= -480 RATIO IL= -720 FD IL= -590 Ø50 UPVC REFER
-W
Ø100 Ø80
RW
UPVC SP
8
WP @
26
e
U/G N PIPE
U/G
63
BY
IL= -480
8283
27
UPVC IL= -670 IL= -820 IL= -810 IL= -630 SECTION
81
Ø80 Ø80
P
-59 VC RW
-WV room
RADON
SA OWER
54
SH
0
ND
Ø100 @ U/G
0
CK AIN
U/G
IL=
WP
ET
-
@
43
F/A
CO
Ø8
0 UP
-62
U/G
IL= -900
0
VILLA
IL= 0 UP
Ø8
IL= -690
VC
WIT
RW
69
0
RWP UPVC
H
P@
WATER
IL=
RWP F/A
@ U/G IL= -840 IL= -700
IL= -550
-72
IL= -1050
U/G
UPVC
87
0
@
UPVC
INF
F/A UPVC
IL=
-65
IL= -850
INF R CO
Ø80 UPVC
FO
4BD n Clo
-63
SP @
0
RA NT
UPVC
-61
RWP
Wa
IL= -550
IL=
IL= -600
-WV set
RWP
0
RWP RWP
UC AT
GT
-02
@ U/G
72
@ U/G F/A
0
UP
IL= -480
TU ION
Ø63 FILTE
IL= -900 UPVC IL= -580
25
RATIO
VC
Ø8
RE RE
IL= -1050
28
52
66
RATIO PIPE @
68
RW
IL= -680
DR FE
0 UP
N PIPE
Ø5
AW R
P@
NOTE
VC
71
IL= -870
0 UP
8 @ U/G
29
VC
INFR
INFRA IL= -760 IL= -820
ING
Ø100
67
RW
32
U/G
ASTR
STRU UPVC
WP
VC
FOR UCTU
P@
CONT CTUR
51
@ U/G
WP
IL= -590
U/G
Ø100 Ø100
U/G
R SP @
IL=
UPVC
27
WP @
IL=
WP F/A
30
BY
0
N WITH OR Ø80
4BD r Ens
UND
0
CONN CTURAL
ME
IL= -190
50
Ma
UPVC
UP
STUB
RW
IL= -680
SA OW
IL= -710
-WV uite
WP
ste
ECTIO
VC
P F/A
ND ER
47
RW
IL= -700
BU
: IL= -490
P@
36
4BD rac
CK
IL= -104
37
SEE
IL= -1220
ET WIT
DR
NOTE
U/G
Ø80
-WV e
0
Ter
IL=
IL= -610 WP 8
AIN
IL= -740 IL= -690 IL= -480 IL= -300 IL= -890 F/A 1
-28
Ø8
Ø8
FD
0
VEN N -R09
WP
0 UP
34
IL= -650
F/A
1 ø80
IL=
VC
49
FD @ U/G MH V
- XX-SDW
WP
Ø8
-72
IL= -720
Ø8
OUT
Ø8
0 UP
POIN
Ø1
0 UP
@
00
0
RW
- 03
UP
VILL
WP
P F/A
VC
N WITH
IL=
OR
0 UP -61
Ø100
RW
STUB
IL=
Ø8
-30
Ø100 MH V
IL= -640 WA E
VC
U/G
P@
0 UP
U/G
1 Ø80 F/A
SU OM PRES
UPVC
-53
UPVC TER
RW
46
FR MM
WP @
MP SW
Ø1
Ø63
VC
U/G
IL=
0
SLP RWP
IL=
ø65
Ø80
IL=
00
@ U/G
PIT IMM RE
Ø1
IL=
UPVC RWP
RW
RWP FILTE
-88
-97
UP
F/A
00
-29
---
33
SE
WP @ RATIO
IL=
U/G
IL= -470
IL=
VC
0
IL= -780
0
N PIPE
E NO
U/G
WP
Ø80
0
IL= -680
40