Sooraj Bhan
SR. QS Engineer
OBJECTIVE
Ambitious and self-motivated individual with near about 8 years
of professional experience, excellent knowledge of infrastructure;
Road Construction. To be placed in a company in which I can use
my technical skills and leader ship quality for the upliftment of the
CONTACT company and to the personal growth.
+91-94663 88380
+91-94163 88380 ABILITIES
soorajbhan092@gmai.com As a Civil Engineer possessing near about 8 years of experience
in, Project Coordination, Team Management, Resource
Hisar, Haryana-125052 Management, in Structure and Highway with emphasis on
following fields:
Flexible/Rigid Pavement, Sub-base, Base, Earthwork.
SKILLS
Box/Pipe Culvert, VUP, Retaining Wall, RE Wall, Toll Plaza
PQC, Crash Barrier, Friction Slab, W-Metal Beam Crash
Execution
Barrier.
80%
Highway Professional in Building Design at CADD
70% Centre Training Services, Noida
Structure
60%
AutoCAD
80% EDUCTION
CalQuan Secured First Class with Distinction in Bachelor of Technology
60% in Civil Engineering with in Dec-2015, from Durgawati Devi
Revit Architecture
50% Institute of Management.
Microsoft Office
75% 45 Days vocational training at PWD B & R, HISAR.
TECHNICAL SKILLS
Familiarity with Auto CAD and related applications
LANGUAGES Proficient in MS Word, Excel Publisher and PowerPoint
Vast understanding of civil and highway engineering concepts.
English
Understanding of ERP Uses.
Hindi
WORK EXPERIENCE
Four Lanning of NH-965G from km 41.369 (Baramati) to km 83.500
(Indapur), Design Length 42.131 km and One time improvement of
selected stretches (Package–II) in the State of Maharashtra under
Bharatmala Pariyojna
PROJECT-4
R.S. Kamthe Infrastructure Experience in Preparation of Bar Bending Schedule of Box Culverts,
Developers Pvt. Ltd Minor Bridge, Drain etc
Responsible for raise RFI and maintain Strip Chart
Sr. Quantity Surveyor
accordance to work progress and approved RFI’s.
JULY 2021–PRESENT Detailed study of plan and profile drawings, Identifying the baking and
cutting stretches
B.O.Q Preparation of civil works as per Approved Drawings.
Over all responsible for Preparation and checking of R.A. bill & Final
bill, contractor’s bills
Study of drawings and raisings RFIs and getting approval of RFIs for
the pavement layers with the consultant
Daily feedback to the Project Manager regarding progress and lacking
of progress if any
Preparation of execution of Road drawings, layouts in AutoCAD
Maintain the daily work progress report & preparation of monthly and
weekly progress review reports.
Preparation / Identification of extra items
Checking, processing and following up of contractor’s bill for smooth
functioning of the work
All activity gets checked by Client according to RFI
PROJECT-3
Raj Infrastructure Development
India Pvt. Ltd Improvement to Section of SH-13 from NH-6 at Ajang To Ambode,
Nawalnagar, Satarne, Vishwanath, Kapadne, NH-3 Sarwad, Nandane,
Quantity Surveyor Burzad, Lamkani, Nijampur, Bramhanwel, Kondaibari to NH-6 Road
JUNE 2021 - JULY 2021 Sh-13 Km. 0/00 To 106/350 (NH-3 Sarwad Junction to Bramhanwel Sh-
7 Junction) [Section 32+245 To Km 97+600 (63.94 Km)] in the state of
Maharashtra Under MRIP on Hybrid Annuity Mode
Preparation of cross sections and quantity calculation by using the
CalQuan software.
Experience in Preparation of Bar Bending Schedule of Box Culverts,
Minor Bridge, Drain etc
Detailed study of plan and profile drawings, Identifying the baking and
cutting stretches
Over all responsible for Preparation and checking of R.A. bill & Final
bill, contractor’s bills
Study of drawings and raisings RFIs and getting approval of RFIs for
the pavement layers with the consultant
Daily feedback to the Project Manager regarding progress and lacking
of progress if any
Preparation of execution of Road drawings, layouts in AutoCAD
Maintain the daily work progress report & preparation of monthly and
weekly progress review reports.
Preparation / Identification of extra items
Coordination with all departments regarding work progress, Design &
Drawing etc.
Checking, processing and following up of contractor’s bill for smooth
functioning of the work
All activity gets checked by Client according to RFI
PROJECT-2 Widening to two lanes with paved shoulders from Km 4/400 to 56/00
Raj Infrastructure Development (50.525 Km) of NH-218 Bijapur - Hubli section in the state of
India Pvt. Ltd Karnataka” through an Engineering, Procurement and Construction
(EPC) Contract”.
Asst. Quantity Surveyor
Review Drawings and to check whether drawings are according to
JULY 2018 – JUNE 2019 design and to remove discrepancy if any.
Preparation and checking of R.A. bill & Final bill, contractor’s bills of
civil works as per Approved Drawings.
Study of drawings and raisings RFIs and getting approval of RFIs for
the pavement layers with the consultant
Daily feedback to the Project Manager regarding progress and lacking
of progress if any
Detailed study of plan and profile drawings, Identifying the baking and
cutting stretches
Preparation of Embankment Layers accurately layer by layer with well
compaction
Preparation of drawing layouts and execution of Road drawings using
AutoCAD system
Maintain the Daily progress report and work progress report
PROJECT-1
Abbott Infratech Pvt. Ltd.
New Chandigarh Mega Project & New Chandigarh Papda Project
Quantity Surveyor Development (Roads / Land Development/ Storm Water Drainage
JANUARY 2016 - JUNE 2018 System/ Water Supply / Sewage Supply System/ Utilities & Real estate)
Coordination with all departments regarding work progress, Bill,
Design & Drawing etc related with Road Work.
Used AutoCAD to generate existing and proposed site plans.
Prepare and maintain maps, drawings, engineering records and files.
HOBBIES
Site execution work earthwork of Road, side drain sub-grade, laying
of GSB, WMM, DBM, BC & fixing of kerb stone, channel and paver
blocks.
Execution of Infrastructure Works, Sewer line(200mm-300mm) dia,
Storm water line (400mm-1000mm) dia, manhole, water supply line
and Hard landscaping services.
Electrical line corridor- Construction of electrical crossings with
different dia RCC pipes, including various types road crossings,
manhole, civil works for feeder pillar and backfilling of service
corridor.
KNOWLEDGE Water supply and sewerage line- laying of MDPE / DI pipes ranging
o MORTH from 25 mm dia to 200 mm dia for water and RCC/SW pipes for
SPECIFICATIONS sewer line including manhole, crossings and testing the services.
o IRC & IS CODES Total supervision of work at site, RCC, Brick works, plaster,
SPECIFICATION Manpower etc.
o AUTO CAD; Project monitoring for progress and schedule, complete site
o MICROSOFT OFFICE management of contractor including review of daily progress report,
weekly progress report, monitoring of daily machineries deployment
schedule.
DECLARATION:
I hereby declare that the above information is true and correct to the best of my knowledge and belief.
Sooraj Bhan