0% found this document useful (0 votes)
176 views3 pages

Rebar Cutting

Uploaded by

Safety Expert
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
176 views3 pages

Rebar Cutting

Uploaded by

Safety Expert
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

LARSEN & TOUBRO LIMITED

INFRASTRUCTURE INDEPENDENT COMPANY


Ref: IM-08-B Rev 00

EHS RISK ASSESSMENT

Name of the Project : WDFC, Phase-II, EMP-16 Business Unit: RBU


Activity considered : Rebar cutting /bending / stacking Date: 06-01-2017

Hazard / Environment Aspect

Probability
Risk / Residual

Severity
Rating

Rating
Sl. Existing Control Additional Control
Activity Source / Impact Risk / Action By
No Possible People at Measures Measures
Situation / Level Impact
Outcome risk
Act
Worker/ 1.maintaining good Site
Rebar cutting
Improper Slip –trip and helper housekeeping Engineer
1. / 1 4 L L
Access fall 2. proper material
bendning
stacking
Fall /slip /trip Worker/ 1. Proper illumination 1 4 L L P&M
helper need to be ensured. /safety
Poor
Engineer
illuminatio 2. Lux meter can be
n used to check the
lightening level.
1.Competent operator Site
Spreading Worker/ Providing the guard or lid
Strike / hit by 2. proper supervision Engineer
of small 2 4 M to arrest the spreading of L
the chips helper 3. timely inspection of /
chips small chips
machine P&M
1. Manual handling Site engg.
Chronic must be reduced. /
effects like Worker/
Noise and 2. Weight must be lifted Safety
Finger 1 4 L L
vibration helper closer to the body. engineer
whitening
,HAVS 3.Training must be
imparted to workmen
Site
Weather Rainfall Worker/ Providing shed over the 1 4 L L
condition / sunlight helper machine Engineer
/
Safety
Engineer
1.Proper body earthing P&M
of machine is provided
2. NO water –logging
1.Providing RCCB/ELCB in
nearby is allowed
the connections
3. restricting the use to
Severe electric 2.Emergency Switch is
competent operator
shock provided
Worker/ only
Electricity 3 4 H Standard operating L
/ helper 4.Timely inspection of
procedure must be
Short-circuit the machine
implemented.
5.Rubber mat is
Daily
provided
6. Fire-fighting
arrangements are
provided.
Worker/ 1.maintaining good Site
Rebar Improper Slip –trip and helper housekeeping Engineer
2. 1 4 L L
stacking Access fall 2. proper material
stacking
1. Manual handling Site
WRULD’s Worker/ must be reduced. engineer
Material helper 2. Weight must be lifted /
/ 1 4 L L
Handling closer to the body. Safety
Back pain 3.Training must be engineer
imparted to workmen
Site
Worker/ engineer
Contact Properly Stacking the
with sharp Cut injury helper material 1 4 L L
surface

___________________
PM / CM / Section In-charge EHSO

You might also like