Plumbing
Plumbing
NOTES:
II. SCHEMATIC SYSTEM 1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
1. IFT-MEP-PL-101 DIAGRAM SISTEM PLUMBING AIR KOTOR , AIR BEKAS DAN VENT N T S R0
2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
2. IFT-MEP-PL-102 DIAGRAM SISTEM PLUMBING AIR BERSIH DAN AIR PANAS N T S R0 REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
HOLDERS.
3. IFT-MEP-PL-103 DIAGRAM SISTEM PLUMBING AIR HUJAN N T S R0 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
ARCHITECT'S, SERVICE ENGINEER'S AND DRAWINGS AND SPECIFICATIONS.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
1. IFT-MEP-PL-200 DENAH SITE PLAN INSTALASI AIR KOTOR, AIR BEKAS DAN VENT 1 : 200 R0 MITRA PRIMA INVESTAMA
2. IFT-MEP-PL-201 DENAH LANTAI DASAR INSTALASI AIR KOTOR, AIR BEKAS DAN VENT 1 : 350 R0
KONSULTAN ARSITEK:
3. IFT-MEP-PL-202 DENAH LANTAI 1 INSTALASI AIR KOTOR, AIR BEKAS DAN VENT 1 : 350 R0
4. IFT-MEP-PL-203 DENAH LANTAI 2 INSTALASI AIR KOTOR, AIR BEKAS DAN VENT 1 : 350 R0
5. IFT-MEP-PL-204 DENAH LANTAI 3 INSTALASI AIR KOTOR, AIR BEKAS DAN VENT 1 : 350 R0
KONSULTAN INTERIOR:
6. IFT-MEP-PL-205 DENAH LANTAI ATAP INSTALASI AIR KOTOR, AIR BEKAS DAN VENT 1 : 350 R0
7. IFT-MEP-PL-300 DENAH SITE PLAN INSTALASI AIR BERSIH DAN AIR PANAS 1 : 200 R0
8. IFT-MEP-PL-301 DENAH LANTAI DASAR INSTALASI AIR BERSIH DAN AIR PANAS 1 : 350 R0
KONSULTAN MEKANIKAL ELEKTRIKAL:
9. IFT-MEP-PL-302 DENAH LANTAI 1 INSTALASI AIR BERSIH DAN AIR PANAS 1 : 350 R0
10. IFT-MEP-PL-303 DENAH LANTAI 2 INSTALASI AIR BERSIH DAN AIR PANAS 1 : 350 R0
11. IFT-MEP-PL-304 DENAH LANTAI 3 INSTALASI AIR BERSIH DAN AIR PANAS 1 : 350 R0 KONSULTAN STRUKTUR:
12. IFT-MEP-PL-305 DENAH LANTAI ATAP INSTALASI AIR BERSIH DAN AIR PANAS 1 : 350 R0
13. IFT-MEP-PL-400 DENAH SITE PLAN INSTALASI AIR HUJAN 1 : 200 R0
14. IFT-MEP-PL-401 DENAH LANTAI DASAR INSTALASI AIR HUJAN 1 : 350 R0 KONSULTAN QS:
02 - -
IV. DETAIL INSTALLATION 03 - -
05 - -
2. FC-MEP-PL-502 DETAIL PUMP ROOM N T S R0
DRAWING TITLE:
- PL - 000 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
ROOF DRAIN CANOPY DRAIN 2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
NTS NTS
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
HOLDERS.
-----
CONTROL BOX FOR STRAIGHT MAIN PIPE DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
NTS
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
MAN HOLE COVER FOR SEWAGE SYSTEM BUCKET TYPE FLOOR DRAIN ∅2" LANDSCAPE DECK DRAIN DETAIL KONSULTAN MEKANIKAL ELEKTRIKAL:
NTS NTS NTS
500 - 600
KONSULTAN STRUKTUR:
400 - 500
100
KONSULTAN QS:
BOP - 900
100
FOR TENDER
200
02 - -
BOP - 900
03 - -
100
04 - -
05 - -
DRAWING TITLE:
DETAIL PERLENGKAPAN
FLEXIBLE COUPLING PIPES SLEEVES (UNDER GROUND) DETAIL GARDEN TAP
NTS NTS NTS PLUMBING-1
- PL - 001 -
PROJECT NAME:
KEYPLAN :
FLOOR SLEEVE WALL SLEEVE SLEEVE STANDARD DETAIL WATER TIGHT SLEEVE
NTS NTS NTS NTS
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
HORIZONTAL PIPE HANGER DETAIL VERTICAL PIPE SUPPORT DETAIL PIPE HANGER DETAIL ABOVE FLOOR PIPE SUPPORT DETAIL HEADER PIPE SUPPORT DETAIL
NTS NTS NTS NTS NTS
CLIENT / DEVELOPER:
C
16
50
25
G
KONSULTAN ARSITEK:
225
D D
20
B
1,5M
10
KONSULTAN INTERIOR:
HORIZONTAL PIPE HANGER DETAIL SINGLE PIPE FIXED TO THE WALL DETAIL
NTS NTS
ØDN
KONSULTAN STRUKTUR:
C
Ødn
A
H
B
C
KONSULTAN QS:
E
AxA
AxA
STATUS:
FOR TENDER
MINIMUM SUPPORT SPACING
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
SIDE VIEW
DRAWING TITLE:
FRONT VIEW
VERTICAL SUPPORT FOR VERTICAL SUPPORT FOR
PIPING IN THE SHAFT DETAIL SINGLE VERTICAL PIPES DETAIL SINGLE HORIZONTAL PIPE DETAIL
NTS NTS NTS DETAIL PERLENGKAPAN
PLUMBING-2
- PL - 002 -
PROJECT NAME:
KEYPLAN :
BK BK
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
POTONGAN A REV:
01
DESCRIPTION:
-
DATE:
-
POTONGAN B 02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
DETAIL PERLENGKAPAN
PLUMBING-3
- PL - 003 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
KONSULTAN ARSITEK:
GREASE TRAP
KAP.3 M3 SP-02
GTSP
SP- 01
KONSULTAN INTERIOR:
STP
KONSULTAN MEKANIKAL ELEKTRIKAL:
EP-01
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
- PL-101
PROJECT NAME:
KEYPLAN :
PUMP ROOF
Pompa Return
TN102.A TN102.B 2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
PU201 Pompa
Heat Pump
HOLDERS.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
SF101 CF101
ISSUED FOR TENDER -
PU102A
PU102B
PU.101 TN101
DRAWING TITLE:
- PL-102
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
LIFT PASSENGER
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
DRAWING TITLE:
- PL-103
PROJECT NAME:
KEYPLAN :
+864
OUTDOOR
PLAYGROUND
HK
15
14
16
BANQUET
13
17
STORAGE
12
LINEN
18
LAUNDRY
11
19
10
20
9
21
8
22
7
23
6
24
5
25
4
26
3
27
2
28
GAZEBO GAZEBO
1
ARSIP SERVER NAIK
PANEL SALES MNGR
17
FO & SALES
18
19
up
20
HM PANTRY
ARSIP FOM OFFICE NOTES:
CHAFING GENERAL SHOWER
+862
CHINAWARE DISH STORAGE GWT
SOUND
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
MEETING ROOM MEETING ROOM MEETING ROOM MEETING ROOM MEETING ROOM RESEPSIONIS
NAIK
JAN
LUGAGE STORAGE DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
BOARD ROOM PROCEEDING WITH WORK.
TOILET PRIA
BALANCING TANK
I
AL
PUMP ROOM
UK
TOILET WANITA
A & G DEPT
11 10
9
±0.00 SWIMMING POOL ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
DP
WET 12
TRAFO
GARBAGE 13
8
R. ENGINEERING
HOLDERS.
14
7 KIDS POOL
6
COFFEE SHOP VIP ROOM
15
R.GAS
DRY R. SECURITY
HRD 5
GARBAGE
PREFUNCTION ARCHITECT'S, SERVICE ENGINEER'S AND DRAWINGS AND SPECIFICATIONS.
NAIK
4
3
1 2
R. LVMDP
TM
in out -----
-0.85
SMOKING AREA DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
LOADING DOCK
DP
T AKAN DILAKUKAN
DROP OFF
GENSET
PARKIR KARYAWAN
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
+854
+854
PARKIR MOBIL STP +854
GARDU PLN
KONSULTAN MEKANIKAL ELEKTRIKAL:
STP Kap : 40 m3
PARKIR MOBIL
KONSULTAN STRUKTUR:
KONSULTAN QS:
STP Kap : 3 m3
TOILET
SECURITY
+851
PYLON SIGN
IN OUT STATUS:
FOR TENDER
SIGNAGE
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
- PL - 200 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
HK
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
15
14
16
BANQUET
PROCEEDING WITH WORK.
13
17
STORAGE
12
LINEN
18
LAUNDRY
11
19
10
20
9
21
8
22
2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
7
23
6
24
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
5
25
4
26
ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
3
27
2
28
HOLDERS.
1
ARSIP SERVER NAIK
PANEL SALES MNGR
17
7
R. ENGINEERING
14
6
COFFEE SHOP VIP ROOM KONSULTAN ARSITEK:
15
R.GAS
DRY R. SECURITY
HRD 5
GARBAGE
PREFUNCTION
NAIK
4
3
1 2
R. LVMDP
TM
in out
-0.85
SMOKING AREA
LOADING DOCK
KONSULTAN INTERIOR:
DROP OFF
GENSET
tangki solar
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
- PL - 201 -
PROJECT NAME:
KEYPLAN :
NOTES:
janitor 1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
15
chiller
14
16
3x3m PROCEEDING WITH WORK.
13
17
12
18
11
19
(tangga ke playground)
9
20
KITCHEN
8
21
7
22
R.BILAS 2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
6
23
Ø123.6255
Ø116.2788 Ø123.6255 Ø123.6255 Ø123.6255 Ø123.6255 Ø123.6255 Ø123.6255 5526.321Ø Ø123.6255 Ø123.6255
5
24
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
4
25
F&B
3
26
R. CHEF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
2
27
1
28
HOLDERS.
TURUN NAIK
R.BILAS
29
14
15 13
ROOMBOY
16 12
TURUN
17 11
buffet buffet
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
18 10
19 9
8 DELUXE SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR
ARCHITECT'S, SERVICE ENGINEER'S AND DRAWINGS AND SPECIFICATIONS.
20
21 7
6
GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM
22
23 5
R.PANEL -----
24 4
25 3
2
LOBBY LIFT bar DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
EDR TURUN
1
AKAN DILAKUKAN
NAIK
buffet buffet
ALDERON cashier CLIENT / DEVELOPER:
OUTDOOR
RESTORAN
LOKER STAFF
WANITA RESTORAN
TURUN 29
MITRA PRIMA INVESTAMA
28
MUSHOLA 12
11 10
27
26
13
25
14 24
GRAND DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE 23 KONSULTAN ARSITEK:
15
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
22
16
17 21
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
DENAH LANTAI - 1
DENAH LANTAI - 1 INSTALASI ABK,AK DAN VENT
- EL - 202 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
13
PROCEEDING WITH WORK.
12
14
DAK BETON
11
15
10
TURUN
16
9
17
8
18
DAK BETON
7
19
2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
6
20
5
21
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
4
22
3
23
DAK BETON ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
2
24
1
25
HOLDERS.
TURUN
26
WC
11 ROOMBOY
10
13
9
13
8
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
15
14
7
14
15
16
6
ARCHITECT'S, SERVICE ENGINEER'S AND DRAWINGS AND SPECIFICATIONS.
13
16
17
5
DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR DELUXE
12
20
18
4
11
21
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
19
DAK BETON
10
3
22
R.PANEL
20
2
-----
9
23
21
1
8
24
NAIK LOBBY LIFT DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
7
25
TURUN
6
26
AKAN DILAKUKAN
5
RUANG GYM
4
3
2
1
NAIK
CLIENT / DEVELOPER:
DAK BETON
MITRA PRIMA INVESTAMA
INDOOR PLAYGROUND
GRAND DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE KONSULTAN ARSITEK:
SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
DENAH LANTAI - 2
DENAH LANTAI - 2 INSTALASI ABK,AK DAN VENT
- PL - 203 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
DAK ATAP
14
8
7
15 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
15
18
5
4
DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR DELUXE 18
12
3 ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM 19 7
19
20
2 R.PANEL 20 6
-----
1 21 5
21
1
AKAN DILAKUKAN
NAIK
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
DENAH LANTAI - 3
DENAH LANTAI - 3 INSTALASI ABK ,AK DAN VENT
- PL - 204 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
5
16
17
-----
4
3
18
19
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
2
1
20
21
AKAN DILAKUKAN
22 TURUN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
- PL - 205 -
PROJECT NAME:
KEYPLAN :
+864
OUTDOOR
PLAYGROUND
HK
15
14
16
BANQUET
13
17
STORAGE
12
LINEN
18
LAUNDRY
11
19
10
20
9
21
8
22
7
23
6
24
5
25
4
26
3
27
2
28
GAZEBO GAZEBO
1
ARSIP SERVER NAIK
PANEL SALES MNGR
17
FO & SALES
18
19
up
20
HM PANTRY
ARSIP FOM OFFICE NOTES:
CHAFING GENERAL SHOWER
+862
CHINAWARE DISH STORAGE GWT
SOUND
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
MEETING ROOM MEETING ROOM MEETING ROOM MEETING ROOM MEETING ROOM RESEPSIONIS
NAIK
JAN
LUGAGE STORAGE DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
BOARD ROOM PROCEEDING WITH WORK.
TOILET PRIA
BALANCING TANK
I
AL
PUMP ROOM
UK
TOILET WANITA
A & G DEPT
11 10
9
±0.00 SWIMMING POOL ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
DP
WET 12
TRAFO
GARBAGE 13
8
R. ENGINEERING
HOLDERS.
14
7 KIDS POOL
6
COFFEE SHOP VIP ROOM
15
R.GAS
DRY R. SECURITY
HRD 5
GARBAGE
PREFUNCTION ARCHITECT'S, SERVICE ENGINEER'S AND DRAWINGS AND SPECIFICATIONS.
NAIK
4
3
1 2
R. LVMDP
TM
in out -----
-0.85
SMOKING AREA DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
LOADING DOCK
DP
T AKAN DILAKUKAN
DROP OFF
GENSET
PARKIR KARYAWAN
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
+854
+854
PARKIR MOBIL STP +854
GARDU PLN
KONSULTAN MEKANIKAL ELEKTRIKAL:
PARKIR MOBIL
KONSULTAN STRUKTUR:
KONSULTAN QS:
TOILET
SECURITY
+851
PYLON SIGN
IN OUT STATUS:
FOR TENDER
SIGNAGE
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
- EL - 300 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
HK
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
15
14
16
BANQUET
PROCEEDING WITH WORK.
13
17
STORAGE
12
LINEN
18
LAUNDRY
11
19
10
20
9
21
8
22
2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
7
23
6
24
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
5
25
4
26
ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
3
27
2
28
HOLDERS.
1
ARSIP SERVER NAIK
PANEL SALES MNGR
17
7
R. ENGINEERING
14
6
COFFEE SHOP VIP ROOM KONSULTAN ARSITEK:
15
R.GAS
DRY R. SECURITY
HRD 5
GARBAGE
PREFUNCTION
NAIK
4
3
1 2
R. LVMDP
TM
in out
-0.85
SMOKING AREA
LOADING DOCK
KONSULTAN INTERIOR:
DROP OFF
GENSET
tangki solar
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
- EL - 301 -
PROJECT NAME:
KEYPLAN :
NOTES:
janitor 1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
15
chiller
14
16
3x3m PROCEEDING WITH WORK.
13
17
12
18
11
19
(tangga ke playground)
9
20
KITCHEN
8
21
7
22
R.BILAS 2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
6
23
Ø123.6255
Ø116.2788 Ø123.6255 Ø123.6255 Ø123.6255 Ø123.6255 Ø123.6255 Ø123.6255 5526.321Ø Ø123.6255 Ø123.6255
5
24
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
4
25
F&B
3
26
R. CHEF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
2
27
1
28
HOLDERS.
TURUN NAIK
R.BILAS
29
14
15 13
ROOMBOY
16 12
TURUN
17 11
buffet buffet
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
18 10
19 9
8 DELUXE SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR
ARCHITECT'S, SERVICE ENGINEER'S AND DRAWINGS AND SPECIFICATIONS.
20
21 7
6
GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM
22
23 5
R.PANEL -----
24 4
25 3
2
LOBBY LIFT bar DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
EDR TURUN
1
AKAN DILAKUKAN
NAIK
buffet buffet
ALDERON cashier CLIENT / DEVELOPER:
OUTDOOR
RESTORAN
LOKER STAFF
WANITA RESTORAN
TURUN 29
MITRA PRIMA INVESTAMA
28
MUSHOLA 12
11 10
27
26
13
25
14 24
GRAND DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE 23 KONSULTAN ARSITEK:
15
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
22
16
17 21
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
DENAH LANTAI - 1
DENAH LANTAI - 1 INSTALASI AB DAN AP
- EL - 302 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
13
PROCEEDING WITH WORK.
12
14
DAK BETON
11
15
10
TURUN
16
9
17
8
18
DAK BETON
7
19
2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
6
20
5
21
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
4
22
3
23
DAK BETON ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
2
24
1
25
HOLDERS.
TURUN
26
WC
11 ROOMBOY
10
13
9
13
8
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
15
14
7
14
15
16
6
ARCHITECT'S, SERVICE ENGINEER'S AND DRAWINGS AND SPECIFICATIONS.
13
16
17
5
DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR DELUXE
12
20
18
4
11
21
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
19
DAK BETON
10
3
22
R.PANEL
20
2
-----
9
23
21
1
8
24
NAIK LOBBY LIFT DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
7
25
TURUN
6
26
AKAN DILAKUKAN
5
RUANG GYM
4
3
2
1
NAIK
CLIENT / DEVELOPER:
DAK BETON
MITRA PRIMA INVESTAMA
INDOOR PLAYGROUND
GRAND DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE KONSULTAN ARSITEK:
SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
DENAH LANTAI - 2
DENAH LANTAI - 2 INSTALASI AB DAN AP
- EL - 303 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
DAK ATAP
14
8
7
15 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
15
18
5
4
DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR DELUXE 18
12
3 ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM 19 7
19
20
2 R.PANEL 20 6
-----
1 21 5
21
1
AKAN DILAKUKAN
NAIK
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
DENAH LANTAI - 3
DENAH LANTAI - 3 INSTALASI AB DAN AP
- EL - 304 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
5
16
17
-----
4
3
18
19
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
2
1
20
21
AKAN DILAKUKAN
22 TURUN
CLIENT / DEVELOPER:
ROOFTANK
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
- EL - 305 -
PROJECT NAME:
KEYPLAN :
BK BK BK
+864 BK
OUTDOOR
PLAYGROUND
HK BK
15
14
16
BANQUET
13
BK
17
BK BK BK BK STORAGE
12
LINEN
18
LAUNDRY
11
19
10
20
9
21
8
22
7
Ø200 AH PVC AW
23
BK
6
24
5
25
4
26
3
27
2
28
GAZEBO GAZEBO
1
ARSIP SERVER NAIK
PANEL SALES MNGR
17
FO & SALES
18
19
up
20
HM PANTRY
Ø150 AH PVC AW ARSIP FOM OFFICE NOTES:
CHAFING GENERAL SHOWER
+862
CHINAWARE DISH STORAGE GWT
BK
SOUND
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
MEETING ROOM MEETING ROOM MEETING ROOM MEETING ROOM MEETING ROOM RESEPSIONIS
NAIK
JAN
LUGAGE STORAGE DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
BK
BOARD ROOM PROCEEDING WITH WORK.
Ø80 AH PVC AW TOILET PRIA
AW
C
PV BALANCING TANK
I
AL
H
0A PUMP ROOM
Ø20
UK
BK TOILET WANITA
A & G DEPT
11 10
9
±0.00 SWIMMING POOL ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
DP
WET 12
TRAFO
GARBAGE 13
8
R. ENGINEERING
HOLDERS.
14
7 KIDS POOL
Ø200 AH PVC AW
6
COFFEE SHOP VIP ROOM
15
R.GAS
DRY R. SECURITY
HRD 5
GARBAGE
PREFUNCTION ARCHITECT'S, SERVICE ENGINEER'S AND DRAWINGS AND SPECIFICATIONS.
NAIK
4
3
Ø100 AH PVC AW 1 2
R. LVMDP
BK TM
in out -----
-0.85 BK
SMOKING AREA DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
LOADING DOCK
DP
T BK BK BK AKAN DILAKUKAN
DROP OFF
GENSET
PARKIR KARYAWAN
BK BK
BK
PARKIR MOBIL
KONSULTAN ARSITEK:
BK
BK BK BK
BK BK BK
BK
KONSULTAN INTERIOR:
BK BK BK BK
+854
+854
PARKIR MOBIL STP +854
GARDU PLN
KONSULTAN MEKANIKAL ELEKTRIKAL:
BK
BK BK
PARKIR MOBIL
BK
BK
KONSULTAN STRUKTUR:
BK
BK BK
KONSULTAN QS:
BK BK BK
TOILET
SECURITY
+851
BK
BK
PYLON SIGN
IN OUT STATUS:
FOR TENDER
SIGNAGE
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
- EL - 400 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
HK
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
15
14
16
BANQUET
PROCEEDING WITH WORK.
13
17
STORAGE
12
LINEN
18
LAUNDRY
11
19
10
20
9
21
8
22
2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
7
Ø200 AH PVC AW
23
6
24
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
5
25
4
26
ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
3
27
2
28
HOLDERS.
1
ARSIP SERVER NAIK
PANEL SALES MNGR
17
AW
C
BALANCING TANK
PV
AH
PUMP ROOM
00
menuju Saluran
Ø2
B3
GARBAGE
MUSHOLA MITRA PRIMA INVESTAMA
TOILET WANITA 11 10
R. ENGINEERING
Ø200 AH PVC AW
7
14
6
COFFEE SHOP VIP ROOM KONSULTAN ARSITEK:
15
R.GAS
DRY R. SECURITY
HRD 5
GARBAGE
PREFUNCTION
NAIK
4
3
Ø100 AH PVC AW 1 2
R. LVMDP
TM
in out
-0.85
SMOKING AREA
LOADING DOCK
KONSULTAN INTERIOR:
DROP OFF
GENSET
tangki solar
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
- EL - 401 -
PROJECT NAME:
KEYPLAN :
Ø100 AH PVC AW
menuju Saluran
Ø150 AH PVC AW
NOTES:
menuju Saluran
menuju Saluran 100 RD janitor 1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
100 RD Ø100 AH PVC AW 100 RD 100 RD Ø100 AH PVC AW 100 RD 100 RD Ø100 AH PVC AW 100 RD 100 RD Ø100 AH PVC AW 100 RD 100 RD Ø100 AH PVC AW
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
15
chiller
14
16
3x3m PROCEEDING WITH WORK.
13
17
12
18
Ø150 AH PVC AW
11
19
100 RD
(tangga ke playground)
9
20
KITCHEN
8
21
7
22
R.BILAS 2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
6
Ø200 AH PVC AW
23
Ø123.6255
Ø116.2788 Ø123.6255 Ø123.6255 Ø123.6255 Ø123.6255 Ø123.6255 Ø123.6255 5526.321Ø Ø123.6255 Ø123.6255
5
24
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
4
25
F&B
3
26
Ø100 AH PVC AW
2
27
1
28
HOLDERS.
TURUN NAIK
R.BILAS
29
14
15 13
ROOMBOY
16 12
TURUN
17 11
buffet buffet
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
18 10
19 9
8 DELUXE SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR
ARCHITECT'S, SERVICE ENGINEER'S AND DRAWINGS AND SPECIFICATIONS.
20
21 7
GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM GARDEN ROOM
Ø150 AH PVC AW 6
100 RD
22
23 5
R.PANEL -----
24 4
Ø150 AH PVC AW 25 3
2
LOBBY LIFT bar DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
EDR TURUN
1
AKAN DILAKUKAN
NAIK
buffet buffet
Ø100 AH PVC AW
100 RD
TURUN 29
MITRA PRIMA INVESTAMA
28
MUSHOLA 12
11 10
27
Ø100 AH PVC AW
Ø100 AH PVC AW
26
13
25
14 24
GRAND DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE 23 KONSULTAN ARSITEK:
15
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
22
16
17 21
100 RD
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
DENAH LANTAI - 1
DENAH LANTAI - 1 INSTALASI AIR HUJAN
- EL - 402 -
PROJECT NAME:
KEYPLAN :
Ø150 AH PVC AW
NOTES:
100 RD 100 RD 100 RD 100 RD
Ø100 AH PVC AW Ø100 AH PVC AW Ø100 AH PVC AW 1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
13
80 RD
PROCEEDING WITH WORK.
12
14
DAK BETON
11
15
10
TURUN
16
9
17
100 RD
8
18
DAK BETON
7
19
2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
6
Ø200 AH PVC AW
20
5
21
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
4
22
80 RD
3
23
DAK BETON ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
2
24
Ø80 AH PVC AW
Ø100 AH PVC AW
1
25
HOLDERS.
TURUN
26
WC
11 ROOMBOY
10
13
9
80 RD
13
8
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
15
14
7
14
15
16
6
ARCHITECT'S, SERVICE ENGINEER'S AND DRAWINGS AND SPECIFICATIONS.
13
16
17
5
DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR DELUXE
12
20
18
4
11
21
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
19
Ø150 AH PVC AW DAK BETON
10
3
22
R.PANEL
20
100 RD
2
-----
Ø80 AH PVC AW
9
23
21
1
8
24
NAIK LOBBY LIFT DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
7
25
Ø150 AH PVC AW TURUN
6
26
AKAN DILAKUKAN
5
RUANG GYM
4
3
2
80 RD
1
NAIK
Ø100 AH PVC AW
CLIENT / DEVELOPER:
Ø80 AH PVC AW
DAK BETON
100 RD MITRA PRIMA INVESTAMA
Ø100 AH PVC AW
Ø80 AH PVC AW
80 RD
INDOOR PLAYGROUND
GRAND DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE KONSULTAN ARSITEK:
SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM
Ø80 AH PVC AW
100 RD
80 RD
Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
DENAH LANTAI - 2
DENAH LANTAI - 2 INSTALASI AIR HUJAN
- EL - 403 -
PROJECT NAME:
KEYPLAN :
Ø150 AH PVC AW
NOTES:
100 RD 1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
Ø100 AH PVC AW
DAK ATAP
Ø200 AH PVC AW 2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
Ø100 AH PVC AW Ø80 AH PVC AW
ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
100 RD
11 ROOMBOY 100 RD HOLDERS.
10
12
9
100 RD
13
14
8
7
15
Ø100 AH PVC AW
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
15
18
5
4
DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR SUPERIOR DELUXE 18
12
3 ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM 19 7
19
R.PANEL
Ø100 AH PVC AW
20
21
2
1
20
21 5
6
-----
LOBBY LIFT DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
TURUN 22
TURUN 4
22
3
1
AKAN DILAKUKAN
NAIK
100 RD
Ø100 AH PVC AW
MITRA PRIMA INVESTAMA
Ø100 AH PVC AW
100 RD
Ø100 AH PVC AW
BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM BALCONY ROOM
JR SUITE JR SUITE JR SUITE JR SUITE JR SUITE
ROOM ROOM ROOM ROOM ROOM
100 RD
Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW Ø80 AH PVC AW
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
DENAH LANTAI - 3
DENAH LANTAI - 3 INSTALASI AIR HUJAN
- EL - 404 -
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
5
16
17
-----
4
3
18
19
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
2
1
20
21
AKAN DILAKUKAN
22 TURUN
Ø200 AH PVC AW
CLIENT / DEVELOPER:
150 RD Ø150 AH PVC AW 150 RD Ø150 AH PVC AW 150 RD Ø150 AH PVC AW 150 RD
Ø150 AH PVC AW
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
01 - -
02 - -
03 - -
04 - -
05 - -
DRAWING TITLE:
- EL - 405 -
PROJECT NAME:
KEYPLAN :
NOTES:
DENAH BIOTECH 1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
DRAWING TITLE:
DETAIL STP
KAP.40 M3
- PL-501
PROJECT NAME:
KEYPLAN :
GWT NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
DRAWING TITLE:
- PL-502
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
DRAWING TITLE:
- PL-503
PROJECT NAME:
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
R.BILAS
R.BILAS
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
R.BILAS
R.BILAS
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
DRAWING TITLE:
DETAIL TOILET
R.BILAS LANTAI - 1
INSTALASI PIPA AK,ABK & VT INSTALASI AB,AP,APR,AK,ABK,VT
INSTALASI PIPA AB, AP & APR
SCALE AT A3: DATE: (DD/MM/YY) DRAWN: CHECKED:
SKALA 1 : 50
SKALA 1 : 50
PROJECT NO: DRAWING NO: REVISION:
- PL-504 - A
PROJECT NAME:
LOCKER KARY
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PRIA
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
HOLDERS.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
MUSHOLA
MUSHOLA KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
LOCKER KARY
LOCKER KARY
STATUS:
FOR TENDER
WANITA
WANITA
REV: DESCRIPTION: DATE:
DRAWING TITLE:
DETAIL TOILET
LOCK KARY LANTAI - DASAR
INSTALASI PIPA AK,ABK & VT INSTALASI AB,AP,APR,AK,ABK,VT
INSTALASI PIPA AB, AP & APR
SCALE AT A3: DATE: (DD/MM/YY) DRAWN: CHECKED:
SKALA 1 : 50
SKALA 1 : 50
PROJECT NO: DRAWING NO: REVISION:
- PL-504 - B
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
JANITOR JANITOR 2. THE COPYRIGHT OF THIS DRAWING IS VESTED AND IT MAY NOT BE
REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF
ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT
HOLDERS.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
PRIA PRIA
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
WANITA WANITA
DRAWING TITLE:
DETAIL TOILET
PUBLIK LANTAI - DASAR
INSTALASI PIPA AK,ABK & VT INSTALASI AB,AP,APR,AK,ABK,VT
INSTALASI PIPA AB, AP & APR
SCALE AT A3: DATE: (DD/MM/YY) DRAWN: CHECKED:
SKALA 1 : 75
SKALA 1 : 75
PROJECT NO: DRAWING NO: REVISION:
- PL-504 - C
PROJECT NAME:
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
SUITE ROOM
DRAWING TITLE:
DETAIL TOILET
SUITE ROOM
INSTALASI PIPA AK,ABK & VT INSTALASI AB,AP,APR,AK,ABK,VT
INSTALASI PIPA AB, AP & APR
SCALE AT A3: DATE: (DD/MM/YY) DRAWN: CHECKED:
SKALA 1 : 40
SKALA 1 : 40
PROJECT NO: DRAWING NO: REVISION:
- PL-505 -A
PROJECT NAME:
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
DRAWING TITLE:
DETAIL TOILET
DELUXE ROOM
INSTALASI PIPA AK,ABK & VT INSTALASI AB,AP,APR,AK,ABK,VT
INSTALASI PIPA AB, AP & APR
SCALE AT A3: DATE: (DD/MM/YY) DRAWN: CHECKED:
SKALA 1 : 20
SKALA 1 : 20
PROJECT NO: DRAWING NO: REVISION:
- PL-505 - B
PROJECT NAME:
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
DRAWING TITLE:
DETAIL TOILET
STANDART ROOM
INSTALASI PIPA AK,ABK & VT INSTALASI AB,AP,APR,AK,ABK,VT
INSTALASI PIPA AB, AP & APR
SCALE AT A3: DATE: (DD/MM/YY) DRAWN: CHECKED:
SKALA 1 : 20
SKALA 1 : 20
PROJECT NO: DRAWING NO: REVISION:
- PL- 505 - C
PROJECT NAME:
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
DRAWING TITLE:
DETAIL TOILET
VILLA - 2 BR
INSTALASI PIPA AK,ABK & VT INSTALASI AB,AP,APR,AK,ABK,VT
INSTALASI PIPA AB, AP & APR
SCALE AT A3: DATE: (DD/MM/YY) DRAWN: CHECKED:
SKALA 1 : 20
SKALA 1 : 20
PROJECT NO: DRAWING NO: REVISION:
- PL-505 - D
PROJECT NAME:
KEYPLAN :
NOTES:
1. ALL WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED
DIMENSIONS. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO
PROCEEDING WITH WORK.
-----
DOKUMEN INI HENDAKNYA DIVERIFIKASI DI LAPANGAN SETIAP PEKERJAAN
AKAN DILAKUKAN
CLIENT / DEVELOPER:
KONSULTAN ARSITEK:
KONSULTAN INTERIOR:
KONSULTAN STRUKTUR:
KONSULTAN QS:
STATUS:
FOR TENDER
REV: DESCRIPTION: DATE:
DRAWING TITLE:
DETAIL TOILET
VILLA - 1 BR
INSTALASI PIPA AK,ABK & VT INSTALASI AB,AP,APR,AK,ABK,VT
INSTALASI PIPA AB, AP & APR
SCALE AT A3: DATE: (DD/MM/YY) DRAWN: CHECKED:
SKALA 1 : 20
SKALA 1 : 20
PROJECT NO: DRAWING NO: REVISION:
- PL-505 - E