8000-002 Construction of Barangay Road MEO January December 500 meters long constructed Municipal 2,000,000.00 2,000,000.
00
8000-003 Construction of Pathways PB January December 300 meters long rehabilitated GF 150,000.00 150,000.00
8000-004 Covered Canal MEO January December 500 meters long constructed Municipal 1,000,000.00 1,000,000.00
8000-005 Reserve for Devolution Transition 507,711.88
Plan 2024 (DTP)
OTHER SERVICES
Honoraria of 2 BHW
Honoraria/Productivity Incentive
Allowance of Brgy. Health Workers
PB January December (2x3500=7000) in 12 mos GB 94,000.00 94,000.00
(84,000.00)
Personal Incentive
Allowance
(2x5000=10,000.00)
Conduct of GAD Training PB January December Member of GAD Focal Point GB 130,475.00 130,475.00
System Attended the
Purchase of Other Supplies and PB January December Training
1 sofa bed, 1 Office Table GB 45,015.00 45,015.00
materials for VAWC DESK OFFICE with chair, 2 blanket, 2 pillow
-
5% Local Disaster Risk
9000
Management Program
purchased of tools and
Provision for the purchased of other
equipment for disaster 70%
supplies and materials for disaster PB January December 141,505.00 141,505.00
response and rescue LDRRMF
response
activities
Preparedness and Mitigation
Quick Response Fund PB January December 30% 60,645.00 60,645.00
LDRRMF
TOTAL 2,550,000.00 4,082,660.00 7,340,600.00 14,513,471.88
Prepared by: Attested by:
JERBELL B. GUANZON HON. THELMA A. ESPINOSA HON. RODERICK M. ALVAREZ
Barangay Secretary CCA / Barangay Kagawad Punong Barangay
Compatibility Report for 1 AIP 2022.xls
Run on 12/1/2021 14:54
If the workbook is saved in an earlier file format or opened in an earlier version
of Microsoft Excel, the listed features will not be available.
Minor loss of fidelity # of occurrences
Some cells or styles in this workbook contain formatting that is not supported 54
by the selected file format. These formats will be converted to the closest
format available.
Version
Excel 97-2003