0% found this document useful (0 votes)
991 views3 pages

3 2 2 Mooring Lines

Uploaded by

mlc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
991 views3 pages

3 2 2 Mooring Lines

Uploaded by

mlc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

State the proper procedures Safety mooring

for mooring portside alongside procedures


from "first line ashore" up to
"Forward and aft all lines made
fast" in accordance to safe State the proper procedures
working practices for mooring portside alongside
from "first line ashore" up to
"Forward and aft all lines made
fast" in accordance to safe
working practices

But first we need to define those uncertain t L ine First Procedure


s
Fir hore
Tug boat’s line or
mooring rope. Usually

words.
this line has high breaking

As
strength

Tug’s Line .
Method: Throwing of
• First Line ashore – the time at which the first line is Heaving Line
passed, thrown or heaved from the ship to the shore

Tug
Note: Most common first
or mooring to begin the docking or mooring process.
lines are spring lines

• Tug’s line – Mooring line from tug boat. Usually it has


high breaking strength as it mainly used for pulling the
Purpose of Tugboat is to
vessel. assist the vessel in berthing
operation and mooring
operation
Area
Tu

• Tension drum – part of the mooring winch, where you


g’s
Port

Lin
e

need to place the mooring line when it will be heave and

Tug
fixed.
Tug boat’s line or
2nd Procedure
mooring rope. Usually
this line has high breaking
strength

Method: Throwing of After the spring lines fixed from


Tu
g’s
Lin
e .
re

bollard, tightened and transferred


o
Ash
ine

Heaving Line
st L
Fir
Spring Lines (2)
to tension drum, the fwd and aft

Tug
Note: Most common first .
mooring team will proceed to
continue either on breast lines or

Tug
lines are spring lines
stern/headlines depends on the
pilot discretion.

Purpose of Tugboat is to On this diagram, I’ll use the breast


assist the vessel in berthing lines as next step.
operation and mooring
operation Spring Lines (2)
Area

Area
Tu
g’s
Port

Port
Lin
e
Tug

Tug
3rd Procedure 4th Procedure
Headlines (3)

Breast Lines (2) Breast Lines (2)

Fix the breast lines, tightened and Fourth, fix the stern lines and
put the mooring ropes on winch headlines.
Spring Lines (2) Spring Lines (2)
into the tension drum
. .
Tug

Tug
Note: If mooring ropes on winches are not
Note: Over tightening or heaving enough to fill the mooring requirements,
you’re going to use the loose ropes.
Spring Lines (2) the mooring ropes will cause Spring Lines (2)
unaligned or difficulties in making Loose ropes are the ropes fix and tightened
Area

Area
Port

Port

the vessel touching the port on mooring bits. The purpose of using loose
ropes is for additional safety and hold.
fenders Sometimes the local vicinity will experience
Tug

Tug
Breast Lines (2) Breast Lines (2) strong currents and bad weather.

Sternlines (3)
Last Procedure
Headlines (3)

Breast Lines (2)


. Release the tug’s lines in foreward
and aft station.

Spring Lines (2)

Tug
Spring Lines (2)
Area
Port

Breast Lines (2)


g
Tu

Sternlines (3)

You might also like