The document is a checklist for the inspection of gypsum false ceilings at Raffles Residency Pvt. Ltd. It outlines various points to check during the inspection process, including material approvals, method statements, and service line tests. The checklist also includes sections for endorsements and work approvals from different engineering disciplines involved in the project.

Uploaded by

Vishnu Shivhare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views2 pages

RPK - False Ceiling

The document is a checklist for the inspection of gypsum false ceilings at Raffles Residency Pvt. Ltd. It outlines various points to check during the inspection process, including material approvals, method statements, and service line tests. The checklist also includes sections for endorsements and work approvals from different engineering disciplines involved in the project.

Uploaded by

Vishnu Shivhare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Document No.

WDPL/PRJ/CL/27
Issue No./Date 01/24-01-2017

Wire Developers Pvt. Ltd. Rev. No./Date 00/24-01-2017


Contractor's Name CHECKLIST - Gypsum false Ceiling
Wire Developers Pvt.
Ltd. Gypsum false Ceiling
Checklist No.
Name of Work: False Ceiling Pr. Start Date :
Employer: Raffles Residency Pvt. Ltd. Pr. End Date :
Contract No.: Checklist Date:
Contractor:
Item Description: Inspection Requested by: BOQ No.

Gypsum false Ceiling 1st inspection 2nd inspection Final inspection Type of Finish
Req.on: Req. on: Req. on:
Location Section Level By.: By.: By.: Quantity
G/floor, F/floor, Date: Date: Date:
Villa - 2nd/floor. Time: Time: Time:
O O O
Points to Check P Action Req. P Action Req. P Action Req. REMARKS
1. Drawings & Spec. Details Finalised
2. Material Approvals as per Sample
FOR GRIDS & ALIGNMENT

3. Method Statement Approved


4. Area Clearance from Civil & Services
5. All Service lines laid and approved
6. Pressure test for Service lines Complete
7. All openings of sleeves are sealed
8. Availability of Materials [Daily Req.]
9. check if false ceiling levels are marked
as/ drawing or as per site condition
10. Spacing of the frame members
11. Frame levelling checked
Agency Name Sign with Date
Main Contractor
ENDORSEMENTS

Electrical

ACMV

Plumbing

Others[Specify]]
Approved for Execution Task Start Date:
1. Sheet/ Fixing pattern as per specificatio
2. Paper / Fibre tape in all joint fixed
For Tile / Board fixing

3. Joints filled and levelled with jointing


4. Line, level & Alignment of edges
5. Check for the achievement of levelled
gypsum surface
6. Check for finishing of the coves
7. Check for the down ceiling lights layout
8. Fixing of All Service Fixtures Complete
9.Top coat primer application
10.Cleaning/Dusting of Flooring is done
Work Approval Approved Approved subject to Rectifications Listed Not Approved [See Remarks]
Task End Date
REMARKS

Main Contractor Electrical Eng. Mechanical Eng. Civil Engineer Villa in charge finishes Manager Finishes