0% found this document useful (0 votes)
17 views3 pages

Endurance

Uploaded by

basilisk2007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views3 pages

Endurance

Uploaded by

basilisk2007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

“EAGLE PILAR” / DP SHUTTLE TANKER : PETROBRAS ANNUAL DP TRIALS - 2023

REPORT NO. SI-G43-0989-R987 Rev. 0

Equipment System: Power Generation System


Test No. 20: Generator Full Power Tests
Objective: To demonstrate the ability of the thrusters and generators to operate at rated power.

Assumption: DP, PMS/power systems and thrusters are fully operational. All engine protection must be fully
operational and tested prior to this test.
Method: This test item can be carried out in manual mode.
1. Required ME and generators to be operated according to demand to sustain 100% load on
specified main engine for at least 30 minutes. (Note: this test can be done during sailing).

Expected Results:
1. Each main engine and generator is capable of 100% power for at least 30 minutes with no
alarms or trips active.

Actu results:
al 1.
Parameters ME DG1 DG2 DG3 DG4
(1hour)
T=0 Temp-LTFW intlet 34.6 38 36 37 44
Temp-HTFW outlet 60.2 85 85 85 86
Temp-Lube-oil intlet 45.4 71 71 71 72
Temp-Exhaust Gas 442 414 401 405 441
(avg)
kW / Load reading 16255 3198 4187 4109 3238
T = +30min Temp- LTFW outlet 34.5 41 40 36 47
Full Power Temp- HTFW outlet 60.0 84 85 85 86
Temp-Lube-oil outlet 45.5 71 71 71 71
Temp-Exhaust Gas 478 419 403 406 445
(avg)
kW / Load reading 16594 3216 4122 4182 3199

Comments:
For trials attachment please refer to appendix B:
· TEST 20-All DGs 100%
· TEST 20-ME 100%

To verify full load availability of the DGs, any feature that can prevent verification of the 100%
reduction tests is to be temporarily disabled prior of full load test. Minimum of 95% load is to be
to start maintained throughout 30 minutes.

Witnessed By: J. Leal Date: 25/26 Feb 2023

Report No.: SI-G43-0989-R987 Rev. 0 Page 57 of 132


“EAGLE PILAR” / DP SHUTTLE TANKER : PETROBRAS ANNUAL DP TRIALS - 2023
REPORT NO. SI-G43-0989-R987 Rev. 0

Equipment System: Thrusters


Test No. 21: Thruster Full Power Tests
Objective: To demonstrate the ability of the thrusters to operate at rated power.
Assumption: Power plant/ thrusters/ DP/ICMS are commissioned and operational.
Method: This test can be done by joystick or manual levers:
1. Note key thruster parameters with thruster at idle including motor winding temperature, cooling water
temperature. Increase thrust to maximum and hold for 60 minutes. This test can be done with a
group of thrusters at a time or one at a time.
2. Note the time taken for the thruster to ramp from 0-100% (on manual levers). Take note of rudder
response time as well

Expected Results:
1-2. All thrusters capable of delivering 100% and satisfactory performance for all thrusters.

Actual Results:
1.

Test Step 1 T1 T2 T3 T4 T5
T=0 Temp-Winding (°) 59.6 64.1 58.7 64.3 66.2
Start of full 59.8 63.8 62.3 63.4 66.6
power 59.5 63.9 62.0 62.9 66.5
Temp-Water(°) 32 36 36 37 38
Temp-Lube-oil (°) 35.7 53.6 47.3 51.5 47.9
Pitch feedback (%) 98% 99% 99% 99% -100%
on lever
T = +60min Temp-Winding(°) 88.4 91.8 80.6 82.2 85.1
Full Power 90.2 91.3 85.2 80.2 84.1
89.4 92.1 84.6 79.3 84.4
Temp-Water(°) 34 37 37 38 39

Temp-Lube-oil (°) 36.0 54.5 47.3 54.0 50.0


Pitch feedback (%) 99% 100% 99% 99% -100%
on lever
Thrust (kn) 398 488 485 378 285
Power (kW) 3027 3077 2860 2185 2200
RPM -

Main Propulsion

T=0 Temp- Temp- ST


60 33
On DP Piston Cool seal
Temp-LO Temp-
inlet 46 CPP OD -
Box
Report No.: SI-G43-0989-R987 Rev. 0 Page 58 of 132