Y
A
ALUMINIUM
FRAME
ALUMINIUM (60X100)
FRAME
FROSTED (60X100) ALUMINIUM
1340
TOUGHENED COVERING
GLASS FRAME
(6 MM THICK) (60X20)
X X' DETAIL AT A DETAIL AT D
(SCALE 1:5) (SCALE 1:5)
2600
B
GLASS
510
BEADING
ALUMINIUM
FRAME
(60X100)
ALUMINIUM ALUMINIUM
COVERING FRAME
GLASS ALUMINIUM
510
FRAME (60X100)
BEADING COVERING
(60X20)
FRAME
(60X20)
C DETAIL AT B DETAIL AT E
(SCALE 1:5) (SCALE 1:5)
ELEVATION SECTION Y-Y'
(SCALE 1:20) (SCALE 1:20)
Y'
3000
675 675 675 675
ALUMINIUM ALUMINIUM
ALUMINIUM FRAME
COVERING FRAME
FRAME (60X100)
(60X100) FROSTED
D E F (60X20)
TOUGHENED
GLASS
(6 MM THICK)
DETAIL AT C DETAIL AT F
SECTION X-X' (SCALE 1:5)
(SCALE 1:5)
(SCALE 1:20)
BILL OF QUANTITIES
1) MATERIALS
SL. NO NAME OF ITEM UNIT QUANTITY RATE/UNIT TOTAL TOTAL EXPECTED MATERIAL COST = 20173/- 3) LABOUR
15% ADDITIONAL COST = 3026/-
1 ALUM. GLASS PARTITION PROFILE SQFT 83 100 8300 TOTAL COST = 23198/-
CONSIDERING 250 RS/ SQFT FOR LABOUR
2 ALUM. COVERING FRAME M 20 45 900 TOTAL AREA = 83 SQFT
2) FINISHES TOTAL LABOUR COST = 83X250 = 20750/-
3 6 MM THICK TOUGHENED GLASS SQFT 83 92 7636 SL. NO FINISH UNIT QUANTITY RATE/UNIT TOTAL 15% ADDITIONAL COST = 3112/-
TOTAL COST = 23862/-
4 GLASS BEADING FT 174 10.5 1827 1 POWDER COATING - BLACK COLOR SQFT 80 150 12000
5 CARBON STEEL BOTTOM HEADCAP PIECE 28 22 616 2 FROSTED WINDOW FILM SQFT 166 12 1992
SCREW
TOTAL CONSTRUCTION COST OF PARTITION WALL =
6 ALUMINIUM ANGLE BRACKET PIECE 28 28 784 62452/-
TOTAL EXPECTED FINISHING COST = 13992/-
7 MILD STEEL CONCRETE SCREWS PIECE 11 10 110 10% ADDITIONAL COST = 1400/-
TOTAL COST = 15392/-
SCALE AS MENTION MUHAMMED ASAD MP
PARTITION WALL - FROSTED GLASS WITH DIMENSIONS :-
· WIDTH = 3000 MM
FINISH :-
POWDER COATING (BLACK) B.ARCH 4TH YEAR DAY BATCH
ALL DIMENSIONS
ALUMINIUM FRAME · HEIGHT = 2600 MM (40 MICRONS)
ARE IN MM BUILDING CONSTRUCTION