0% found this document useful (0 votes)
1K views1 page

Partition Wall 1

Technical drawings

Uploaded by

artylogo450
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Partition Wall 1

Technical drawings

Uploaded by

artylogo450
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Y

A
ALUMINIUM
FRAME
ALUMINIUM (60X100)
FRAME
FROSTED (60X100) ALUMINIUM

1340
TOUGHENED COVERING
GLASS FRAME
(6 MM THICK) (60X20)
X X' DETAIL AT A DETAIL AT D
(SCALE 1:5) (SCALE 1:5)

2600
B
GLASS

510
BEADING
ALUMINIUM
FRAME
(60X100)
ALUMINIUM ALUMINIUM
COVERING FRAME
GLASS ALUMINIUM

510
FRAME (60X100)
BEADING COVERING
(60X20)
FRAME
(60X20)
C DETAIL AT B DETAIL AT E
(SCALE 1:5) (SCALE 1:5)
ELEVATION SECTION Y-Y'
(SCALE 1:20) (SCALE 1:20)
Y'

3000
675 675 675 675
ALUMINIUM ALUMINIUM
ALUMINIUM FRAME
COVERING FRAME
FRAME (60X100)
(60X100) FROSTED
D E F (60X20)
TOUGHENED
GLASS
(6 MM THICK)

DETAIL AT C DETAIL AT F
SECTION X-X' (SCALE 1:5)
(SCALE 1:5)
(SCALE 1:20)

BILL OF QUANTITIES
1) MATERIALS
SL. NO NAME OF ITEM UNIT QUANTITY RATE/UNIT TOTAL TOTAL EXPECTED MATERIAL COST = 20173/- 3) LABOUR
15% ADDITIONAL COST = 3026/-
1 ALUM. GLASS PARTITION PROFILE SQFT 83 100 8300 TOTAL COST = 23198/-
CONSIDERING 250 RS/ SQFT FOR LABOUR
2 ALUM. COVERING FRAME M 20 45 900 TOTAL AREA = 83 SQFT
2) FINISHES TOTAL LABOUR COST = 83X250 = 20750/-
3 6 MM THICK TOUGHENED GLASS SQFT 83 92 7636 SL. NO FINISH UNIT QUANTITY RATE/UNIT TOTAL 15% ADDITIONAL COST = 3112/-
TOTAL COST = 23862/-
4 GLASS BEADING FT 174 10.5 1827 1 POWDER COATING - BLACK COLOR SQFT 80 150 12000

5 CARBON STEEL BOTTOM HEADCAP PIECE 28 22 616 2 FROSTED WINDOW FILM SQFT 166 12 1992
SCREW
TOTAL CONSTRUCTION COST OF PARTITION WALL =
6 ALUMINIUM ANGLE BRACKET PIECE 28 28 784 62452/-
TOTAL EXPECTED FINISHING COST = 13992/-
7 MILD STEEL CONCRETE SCREWS PIECE 11 10 110 10% ADDITIONAL COST = 1400/-
TOTAL COST = 15392/-

SCALE AS MENTION MUHAMMED ASAD MP


PARTITION WALL - FROSTED GLASS WITH DIMENSIONS :-
· WIDTH = 3000 MM
FINISH :-
POWDER COATING (BLACK) B.ARCH 4TH YEAR DAY BATCH
ALL DIMENSIONS
ALUMINIUM FRAME · HEIGHT = 2600 MM (40 MICRONS)
ARE IN MM BUILDING CONSTRUCTION

You might also like