Bogie and It's Components
Bogie and It's Components
Covered area with sufficient space for handling raw material like Sand, EOT Crane 5/15 Tons 40 lk
3.2
Scrap etc provided with EOT crane and conveyor, magnetic chuck Conveyor
Magnetic Chuck 3 lk ( 02 nos)
tilting type electric arc furnace having laddle refining facility with
3.3 Arc Furnace 5 Tons (Min.) 3.5 Cr. (5 ton). 6.0 Cr.( 10 ton)
minimum 5t capacity
Minimum three numbers of Charging buckets of suitable capacity for
3.4 charging bucket 3 No. s (Min.) 5 lk (4 nos)
scrap and foundry returns should be available
Facilities for pre-heating of laddle should be available Insulating Laddle
Laddle Pre-heater 1 No. (Min.)
3.5 Insulating Laddle Lining Board or High Alumina bricks should be used for Lining Board/High
1 No. (Min.) 5 lk + 7 lk
Laddle lining Alumina bricks Laddle
Separate identified area for different grade of scrap and foundry lining
3.6
returns should be available for avoiding wrong charging
Facilities should be available for oxygen lancing and Argon purging for Oxygen Lancing 25 lk
3.7
removal of entrapped gases Argon purging
Mobile Crane
Adequate material handling Equipments viz. Mobile crane/EOT EOT Crane
crane/Fork lifter/ Payloader/Magnetic crane/Tractor Trolley/Loading Fork Lifter 20 lk ( 4 nos)
3.8
Tempo/Tram beam/Piller crane should be available for handling of Pay Loader
material at all stages of production Magnetic Crane
Hydra 30 lk ( 02 nos)
Weighing machine of minimum 500 Kg capacity for Ferro alloys charge Electronic Weighing
3.9 1 Ton (1 No.) 7 lk ( 04 nos.)
and minimum 1 ton capacity for finished casting weighment machine
3.10 Ensure that refractory pouring cups & down spruce are used
SAND PREPARATION Adequate as per
Sand drier and cooling arrangement of adequate capacity for drying
4.1 Automatic Sand Drier production 10 lk
incoming sand
sand continuous mixer
with suitable machine
automatic for making Mould
transportation and Core
arrangement. Automatic sand
4.2 should be available. The mixer should be intensive type with calibrated continuous mixer requirement 10 Cr.
dozing of important ingredients. machine
Ensure that the system exist for testing of prepared sand as per the
following frequency: i)
4.3
Moulding sand 1 in every 5 batch. ii) Core
sand 1 in every 20 batch. Rapid Moisture Teller Qty.: 01 No. 20 k
Whenever the sand is tested the following properties of prepared sands Permeability Tester Qty.: 01 No. 35 k
shall be checked. Green Compressive Strength, Green Shear Strength, Sand Shatter Index Qty.: 01 No. 28 k
Moisture, Permeability, Shatter Index flowability, hardness etc. The Universal Sand
4.4 Qty.: 01 No. 1.20 lk
acceptance value for each test must be clearly specified and any sand Testing Machine
Sand Flowability
not meeting the above parameters must not be used for mould/core Qty.: 01 No. 10 k
testing Equipment
making Sand Muller Qty.: 01 No. 2.5 lk
Mould Hardness
Qty.: 01 No. 20 k
Tester
Core Hardness
Jolting M/c OR Tester Qty.: 01 No. 20 k
Jolt and Squeeze machine or mechanised moulding line should be
4.5 Mechanised Moulding Qty.: 01 No. 25 Cr.
Mould cavity & core must available for moulding
be painted with mould wash Alkalic base / PaintingLineFacility by
4.6 Qty.: 01 No. 5 lk
Zircon base in nature to reduce mould metal reaction
Ensure that the facilities are existing for preparation of cores by No ContiniousWash
Zircon Mixture
4.7 Qty.: 01 No. 50 lk
bake method Machine
Heat treatment facilities capable of handling the entire production HEAT
mustTREATMENT
Multi point Automatic
Gas-fired Heat-
5.1 be available in house. Heat treatment furnace should be either
Heat treatment furnace should be provided with multi point automatic treatment oil fired continuous Qty.:01
Qty.: 02No.
No.at
s 2.5 Cr (05 nos )
Furnace
5.2 continuous temperature or Gas fired orarrangement
recording electric typewith digital indicators Calibration Temperature of heat every five feet do
The heat treatment furnace must be calibrated using sufficient no. of Thermocouples/
for each treatment furnace is Calibration
lengthOnce
5.3 thermocouple for point (onetemperature
assessing point at every at five feet length).
different zones at various recording
temperature 35 k
Thermocouples, temperature indicators should be to be done
arrangement at least in a yearOnce
5.4 temperature
Serial nos. ofranges. Theunder
castings calibration
heat is to be
treatment done at calibrated
should least once at
be recorded in least
ainyear
a indicators
Calibration
once in 6 month once inshould
Register ato be be
year in 6 month
do
register for traceability with temperature time curve
Arrangement of proper sealing of doors of HT furnace should be and date. Display calibrated at least
5.5 maintained for do
of available
temperature curveoxidation
to avoid near the /furnace for the guidance
scale formation of the operator
on the surface of the once
Sealing inof6 doors
monthof
5.6 Traceability
Heat Treatment do
casting. should be ensuredinside to avoid entry of air
The HeatThere should
Treatment be positive
recorder/Graph pressure
should have sealing arrangement HT furnace
recorder/Graph
5.7 from outside do
Positioning of the nozzlesto of avoid tampering
oil fired/Gas fired furnace should be such should have sealing
5.8 Burnersarrangement
of HT furnace do
that the flame does not come in direct contact with the castings. Calibration Once
5.9 The burners of HT furnace should be calibrated at every
Induction hardening Machine or alternative equipment to achieve three months should be calibrated do
in 3 month
5.10 specified hardness in terms of Drg. No. WD-97049-S/3 should be atInduction
every three hardening
months Qty.: 01 No. 45 lk
Machine
Shot Blasting
available SHOT BLASTING MACHINE
Machine (Conveyor
Suitable shot blasting machine conveyor monorail type/ Twin table
6.1 Monorail type / Twin Qty.: 01 No. 1.4 Cr
Casting to be given type/Hanger
shot blastedtype should
before beafter
and available.
heat treatment using Steel
6.2 TableShot
typeof/ size
Hanger SS
20 lk
steel shot of size SS 1000, IS 4606 1000, IS 4606
type)
SAND TESTING
All incoming sand must be tested before acceptance as per frequency
set by QC Department. The following must be checked
AFS grain size Sieve Shaker M/c Qty.: 01 No. 45 lk
7.1
Clay content Qty.: 01 No. do
Moisture content Qty.: 01 No. do
7.1
Total 50 Cr
Remarks
.0 Cr.( 10 ton)