1 2 3
NOTES:
FINISHING ABBREVIATION
GROUND FLOOR ROOM SCHEDULE FLOORING
F01: EPOXY PAINT ON CEMENT SCREED
WT Name Floor Finish Wall Finish Base Finish Ceiling Finish
F02: NON SLIP CERAMIC TILES 300X300mm
F03: HEAVY DUTY NON SLIP PORCELAIN TILES 400X400mm
B03-G-012 CORRIDOR F03 W01 B02 C02
B03-G-005 CORRIDOR F03 W01 B02 C02 F04: EPOXY PAINT ON FAIR FACE CONCRETE
B03-G-006 STAIR F04 W01 - -
B03-G-009 CORRIDOR F03 W01 B02 C02 WALL
B03-G-015 STAIR F04 W01 - - W01: EMULSION PAINT
B03-G-019 ELECTRICAL ROOM F01 W01 B01 C01 W02: CERAMIC TILES 300X300mm
B03-G-020 IT ROOM F01 W01 B01 C01
B03-G-022 GARBAGE F02 W02 - C04 BASE
B01: CEMENT BASE 100mm HEIGHT
B02: PORCELAIN BASE 100mm HEIGHT
FIRST FLOOR ROOM SCHEDULE
CEILING
Number Name Floor Finish Wall Finish Base Finish Ceiling Finish C01: ACRYLIC PAINT
C C02: EMULSION PAINT ON GYPSUM BOARD C
B03-01-003 STAIR F04 W01 - - C03: EMULSION PAINT ON MOISTURE RESISTANT GYPSUM BOARD
B03-01-011 JANITOR F02 W02 - C03 C04: ANTIBACTERIAL EMULSION PAINT
B03-01-019 STAIR F04 W01 - -
B03-01-026 ELECTRICAL ROOM F01 W01 B01 C01
B03-01-027 IT ROOM F01 W01 B01 C01
B03-01-029 GARBAGE F02 W02 - C04
SECOND FLOOR ROOM SCHEDULE
Number Name Floor Finish Wall Finish Base Finish Ceiling Finish
B03-02-003 STAIR F04 W01 - -
B03-02-011 JANITOR F02 W02 - C03
B03-02-019 STAIR F04 W01 - -
B03-02-026 ELECTRICAL ROOM F01 W01 B01 C01
E ISSUED FOR CONSTRUCTION AUG. 2022
B03-02-027 IT ROOM F01 W01 B01 C01
D ISSUED FOR TENDER FEB. 2022 MADD KRW
B03-02-029 GARBAGE F02 W02 - C04
C DESIGN DEVELOPMENT STAGE (SE & MEP) NOV. 2021 WSA WSA
B SCHEMATIC DESIGN STAGE (SE & MEP) OCT. 2021 WSA WSA
A SCHEMATIC DESIGN STAGE (SE & MEP) AUG. 2021 WSA WSA
THIRD FLOOR ROOM SCHEDULE REV. ISSUED FOR DATE BY CHECK
SUBMITTALS SCHEDULE
Number Name Floor Finish Wall Finish Base Finish Ceiling Finish
KEY PLAN
B03-03-003 STAIR F04 W01 - -
M NOR
AG TH
B03-03-011 JANITOR F02 W02 - C03
NE
TIC
B03-03-019 STAIR F04 W01 - -
N
B03-03-026 ELECTRICAL ROOM F01 W01 B01 C01
B03
B03-03-027 IT ROOM F01 W01 B01 C01
B03-03-029 GARBAGE F02 W02 - C04
DN
DN
FOURTH FLOOR ROOM SCHEDULE
Number Name Floor Finish Wall Finish Base Finish Ceiling Finish
B03-04-003 STAIR F04 W01 - -
B B03-04-011 JANITOR F02 W02 - C03 B CLIENT:
B03-04-023 STAIR F04 W01 - -
B03-04-030 ELECTRICAL ROOM F01 W01 B01 C01
B03-04-031 IT ROOM F01 W01 B01 C01
B03-04-033 GARBAGE F02 W02 - C04
PROJECT NAME:
DESIGN OF COMMERCIAL, RESIDENTIAL
& ADMINISTRATION COMPLEX
CAIRO GATE - EL SHEIKH ZAYED
GIZAH - EGYPT
BUILDING NAME:
ADMINISTRATION BUILDING (B03)
DESIGNER:
Bays Water Tower,Business Bay Office 1910
P.O.Box 57004 Dubai-UAE
Tel: +971(0)44516868
Fax: +971(0)44516969
E-mail: mail@whitespace.ae
URL: www.whitespcae.ae
INTERIOR DESIGN CONSULTANT:
Gensler architecture, design, and planning firm
Alserkal Avenue, Warehouse 12, Al Quoz 1
PO Box: 58527 Dubai, UAE
Tel.: +971 (0)4 356 1300
URL: https://www.gensler.com/
LANDSCAPE CONSULTANT:
Rabben/Herman design office
Landscape Architecture, Urban Design & Master Planning
833 Dover Drive, Suite 9 Newport Beach, California, 92663
Tel: +19495483459
E-mail:design@rhdo.com
URL://www.rhdo.com/
CONSULTANT:
A A ZFP PROJECT NO.:
C20-00800
PM-KSA: GASA PA: HLMH HV: SHMO LC: KMFM
PD: WSA ID: ----- PG: MMER CE: -----
PM: RHDO SE: MOHO HC: MFMT LS: -----
TITLE:
FINISHING SCHEDULE
SCALE: SHEET NO.: SHEET REVISION:
E00
N.T.S REV. DATE:
AE-612
25 AUG. 2022
220825
1 2 3