0% found this document useful (0 votes)
29 views1 page

Ae 612

Uploaded by

stah0974
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

Ae 612

Uploaded by

stah0974
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3

NOTES:
FINISHING ABBREVIATION

GROUND FLOOR ROOM SCHEDULE FLOORING


F01: EPOXY PAINT ON CEMENT SCREED
WT Name Floor Finish Wall Finish Base Finish Ceiling Finish
F02: NON SLIP CERAMIC TILES 300X300mm
F03: HEAVY DUTY NON SLIP PORCELAIN TILES 400X400mm
B03-G-012 CORRIDOR F03 W01 B02 C02
B03-G-005 CORRIDOR F03 W01 B02 C02 F04: EPOXY PAINT ON FAIR FACE CONCRETE
B03-G-006 STAIR F04 W01 - -
B03-G-009 CORRIDOR F03 W01 B02 C02 WALL
B03-G-015 STAIR F04 W01 - - W01: EMULSION PAINT
B03-G-019 ELECTRICAL ROOM F01 W01 B01 C01 W02: CERAMIC TILES 300X300mm
B03-G-020 IT ROOM F01 W01 B01 C01
B03-G-022 GARBAGE F02 W02 - C04 BASE
B01: CEMENT BASE 100mm HEIGHT
B02: PORCELAIN BASE 100mm HEIGHT
FIRST FLOOR ROOM SCHEDULE
CEILING
Number Name Floor Finish Wall Finish Base Finish Ceiling Finish C01: ACRYLIC PAINT
C C02: EMULSION PAINT ON GYPSUM BOARD C
B03-01-003 STAIR F04 W01 - - C03: EMULSION PAINT ON MOISTURE RESISTANT GYPSUM BOARD
B03-01-011 JANITOR F02 W02 - C03 C04: ANTIBACTERIAL EMULSION PAINT
B03-01-019 STAIR F04 W01 - -
B03-01-026 ELECTRICAL ROOM F01 W01 B01 C01
B03-01-027 IT ROOM F01 W01 B01 C01
B03-01-029 GARBAGE F02 W02 - C04

SECOND FLOOR ROOM SCHEDULE

Number Name Floor Finish Wall Finish Base Finish Ceiling Finish

B03-02-003 STAIR F04 W01 - -


B03-02-011 JANITOR F02 W02 - C03
B03-02-019 STAIR F04 W01 - -
B03-02-026 ELECTRICAL ROOM F01 W01 B01 C01
E ISSUED FOR CONSTRUCTION AUG. 2022
B03-02-027 IT ROOM F01 W01 B01 C01
D ISSUED FOR TENDER FEB. 2022 MADD KRW
B03-02-029 GARBAGE F02 W02 - C04
C DESIGN DEVELOPMENT STAGE (SE & MEP) NOV. 2021 WSA WSA
B SCHEMATIC DESIGN STAGE (SE & MEP) OCT. 2021 WSA WSA
A SCHEMATIC DESIGN STAGE (SE & MEP) AUG. 2021 WSA WSA

THIRD FLOOR ROOM SCHEDULE REV. ISSUED FOR DATE BY CHECK


SUBMITTALS SCHEDULE
Number Name Floor Finish Wall Finish Base Finish Ceiling Finish
KEY PLAN
B03-03-003 STAIR F04 W01 - -

M NOR
AG TH
B03-03-011 JANITOR F02 W02 - C03

NE
TIC
B03-03-019 STAIR F04 W01 - -

N
B03-03-026 ELECTRICAL ROOM F01 W01 B01 C01
B03
B03-03-027 IT ROOM F01 W01 B01 C01
B03-03-029 GARBAGE F02 W02 - C04
DN
DN

FOURTH FLOOR ROOM SCHEDULE

Number Name Floor Finish Wall Finish Base Finish Ceiling Finish

B03-04-003 STAIR F04 W01 - -


B B03-04-011 JANITOR F02 W02 - C03 B CLIENT:

B03-04-023 STAIR F04 W01 - -


B03-04-030 ELECTRICAL ROOM F01 W01 B01 C01
B03-04-031 IT ROOM F01 W01 B01 C01
B03-04-033 GARBAGE F02 W02 - C04
PROJECT NAME:

DESIGN OF COMMERCIAL, RESIDENTIAL


& ADMINISTRATION COMPLEX
CAIRO GATE - EL SHEIKH ZAYED
GIZAH - EGYPT

BUILDING NAME:

ADMINISTRATION BUILDING (B03)

DESIGNER:
Bays Water Tower,Business Bay Office 1910
P.O.Box 57004 Dubai-UAE
Tel: +971(0)44516868
Fax: +971(0)44516969
E-mail: mail@whitespace.ae
URL: www.whitespcae.ae

INTERIOR DESIGN CONSULTANT:


Gensler architecture, design, and planning firm
Alserkal Avenue, Warehouse 12, Al Quoz 1
PO Box: 58527 Dubai, UAE
Tel.: +971 (0)4 356 1300
URL: https://www.gensler.com/

LANDSCAPE CONSULTANT:
Rabben/Herman design office
Landscape Architecture, Urban Design & Master Planning
833 Dover Drive, Suite 9 Newport Beach, California, 92663
Tel: +19495483459
E-mail:design@rhdo.com
URL://www.rhdo.com/

CONSULTANT:

A A ZFP PROJECT NO.:


C20-00800
PM-KSA: GASA PA: HLMH HV: SHMO LC: KMFM

PD: WSA ID: ----- PG: MMER CE: -----

PM: RHDO SE: MOHO HC: MFMT LS: -----


TITLE:

FINISHING SCHEDULE

SCALE: SHEET NO.: SHEET REVISION:


E00
N.T.S REV. DATE:
AE-612
25 AUG. 2022