Bedroom Edge Unit D2
Bedroom Edge Unit D2
X9 Y23 Y22
5150 2750
1200 125 350 3850 150
650 550 500 3700 500 1900 100 2450 500 2275 175
891 1790 900
950 950 1225 1225
895 895
7th Floor 7th Floor LEGEND
20600 20600
SYMBOLS: WALL TYPES :
550
D
DOOR NO. DOOR SCHEDULE
A 100MM THK. CHB
W
WI NDOW NO. WINDOW SCHEDULE B 150MM THK. CHB
10 Retails + On Site Parking @ Ground Floor, 3 Podium Parking,
FF - Amenity @ 5th Floor, and 3 Residential Towers with 29 Storeys
IN TERMEDIATE BEAM C 100MM THK . EPS
2850
2850
2850
FLOOR
FIN. NO. SA NDWICH PA NEL
2675
D
WALL FINISH
2300
2300
150MM THK . EPS
WA LL FIN ISH SCHEDULE
2150
WALL TY PE
SA NDWICH PA NEL
1400
1300
DEP
CE ILING FIN.
CEILING FINISH G REYNALDO C. MADRIDEJOS
300
RC WALL/COLUMN
300
300
CE ILING HT SCHEDULE
6th Floor 6th Floor TSD Officer- Circuit OpCen
WF - 8
300MMX300MM CERAMIC TILES 1
RECEPTACLE LAYER FROM FFL ,REST PLA STERED
REC FINISH JESSALIE ELISA MARIE A. CRUZ
TSD Supervisor
S SWITCH WF - 9 DRY WA LL SYSTEM
PAIN TED FINISH
TYP.1-BEDROOM EDGE UNIT TYP.1-BEDROOM EDGE UNIT
@1ST-28TH RES'L LEVEL @1ST-28TH RES'L LEVEL FLOOR FINISHES: ELECTRICAL SYMBOL:
ARISTOTLE N. SANTOS NEIL CHRISTIAN M. REYES
B1 ELEVATION A B2 ELEVATION B FF - 8 300MMX300MM NON SKID
CERA MIC TILES
CON VINIENCE OUTLET (C.O ) TSD Coordinator (AR/ ST) TSD Coordinator (MEPFS)
For finish ceiling clearance height, please refer to the Arch'l Schedule of Finishes from
SIDE THROW SPRINKLER HEAD TELEPHONE OUTLET Visionary Architecture. Should there be any conflict or problem achiev ing the
headroom clearances, please inform MDC Operations and TSD for proper resolution
MECHANICAL SYMBOL : PANEL BOA RD prior to any commencement of the work.
WAC
For any inconsistency/ discrepancy/ revision/ changes/ alteration of IFC plans due to
WINDOW TYPE A IR H HEAT DETECTOR
CONDITIONIN G site condition/ construction methodology and strategy. Kindly inform the MDC-TSD for
proper coordination and documentation.
S SMOKE DETECTOR
EXHAUST STUB OUT
REVISION:
Y22 Y23 EXHAUST FAN A
FIRE ANNUNCIATOR
No. Description Date
X9 2750 5150 VEN T CAP
3850 350 295 2155 500 2450 100 1900 500 EXHAUST DUCT LINE
300MMX300MM
HA ND HOLE
900 895 895 891 1077 1077 1225 1225 950 950
200
200
350
BEAM SOFFIT LINE BEAM SOFFIT LINE
BEAM SOFFIT LINE
BULKHEAD(C)
BULKHEAD(B) (1-DUCT)
(1-DUCT) 200MM OR SAME DEPTH
BULKHEAD(A) 200MM OR SAME AS ADJACENT BEAM
2850
2850
2675
350MM OR SAME DEPTH AS ADJACENT PROTECTION LINE WILL PASS THRU
2300
2300
2150
1550
1300
BEAM DEPTH
BEAM DEPTH
VERIFY
VERIFY
300
PART OF
PART OF PART OF UNIT B
PART OF
UNIT A 75150 150 75 UNIT B 75150 150 150 15075
UNIT A
375 375
BULKHEAD(D)
SAME DEPTH BULKHEAD(E)
AS PARALLEL/ ADJACENT BEAM WITH OUT BEAM
ELEVATION C
@1ST-28TH RES'L LEVEL
ELEVATION D NOTES : N
B3 B4
AR-701.1 SCALE : A1 - 1:50 AR-701.1 SCALE : A1 - 1:50
A3 - 1:100 A3 - 1:100
1. ASTERISK (*) INDICATES UNIT AS MIRROR OF LAY OUT SHOWN
2. IDENTIFY "MAX"= BASE THE HT ON BEAM/GIRDER SOFFIT DEPTH
KEYPLAN
3. COLUMNS TAPER AS FLOOR LEVEL INCREASES.
4. LIGHT SWITCH MUST BE ALIGNED TO ANY ADJACENT CONVINIENCE OUTLET
5. IN CASE PANEL BOARDS,SWITCHES &/ OR OUTLETS ARE ON OPPOSITE SIDE OF
APPROVED BY:
A WALL,ONE SIDE MUST BE ADJUSTED TO AVOID CONFLICT BETWEEN UTILITY
BOXES (SUBMIT CSD FOR APPROVAL)
6. SOAP HOLDER,TISSUE PAPER HOLDER, FLOOR DRIAN&FLOOR CLEAN OUT
MUST BE ALLIGNED TO A TILE EDGE.
7. ACTUAL UNIT DIMENSIONS SHALL BE VERIFIED WITH MAIN FLOOR PLAN
8. MAIN DOOR FLOOR FINISH STARTING POINT SHOULD BE IN BETWEEN MAIN
DOOR PANEL THICKNESS (SEE MISCELLANEOUS DETAILS) ROCHELLE MARIE M. BALUYOT KRISTINE THERESE G. HORTINELA
9. VERIFIY STRUCTURAL FOR BEAMS &GIRDERS SIZES. Design Manager MDC DID-CG Project Architect MDC DID-CG
10. FOR LOCATION OF
OUTLETS,SWITCHES,PANELBOARDS,SPRINKLERS,HEAT/SMOKE DETECTOR,
EXHAUST FANS.STUB OUTS &ALL OTHER UTILITY APPARATUS,REFER TO THIS DETAIL.
11. VERIFIY STRUCTURAL DETAIL FOR EXHAUST DUCT PENTRATION THROUGH BEAM
LEGEND PROVIDE SHOP DRAWING.
12. SEE MISCELLANEOUS DETAIL FOR THE STANDARD MOUNTING HEIGHT
MARK ANTHONY S. NAVARRO
50 MM Project Officer MDC CMG - Avida
COLUMN ON GOING RFA/ WAO THICKNESS REFERENCES FOR BATHROOM FIXTURES, ELECTRICAL&ELECTRONICS PROVISIONS
FLOOR DEPPRESSION 1 125 COLUMN DIMENSIONS
1PS-1
T1C-1(700x1200)
DEP REVISION NUMBER REVISION SLAB (WxD) COLUMN 13. FOR ACCU FCU CONNECTION LINE,CONSIDER PIPE SLEEVES AS NECESSARY
REFERENCE SLAB MARK
SHEARWALL UPDATED/ RESOLVED ISSUES REVISION CLOUD CLOUD ELEVATION -50 COLUMN MARK
:VERIFY STRUCTURAL AND MECHANICAL FOR DETAILS.
INTERMEDIATE BEAM ON GOING RFI CUTTING PLANE REYNARD D. MARANAN JESUS S. ANIANO JR.
1 SECTION NAME SECTION 1PG-1(500x700) BEAM DIMENSIONS
(WxD) BEAM Project Director MDC CMG - Avida Project Director MDC CMG - Avida
GIRDER SHAFT/ CHASE AR-101 SHEET NUMBER CUTTING BEAM MARK
DESIGN AND BUILD: ARCHITECTURAL CONSULTANT: STRUCTURAL CONSULTANT: MECHANICAL CONSULTANT: FIRE PROTECTION CONSULTANT: ELEVATOR CONSULTANT: OWNER/DEVELOPER: SHEET CONTENTS: SHEET NO: ISSUE:
LANDSCAPE CONSULTANT: ELECTRICAL CONSULTANT: PLUMBING CONSULTANT: DRAINAGE CONSULTANT: QUANTITY SURVEYOR:
DATE:
MAKATI DEVELOPMENT CORPORATION REVISION NO: PROJECT CODE: ATMS- AR
#909 40th Street North, Bonifacio Triangle
31st St. cor 2nd Ave. 1/F Bonifacio Technology Center, Basement-1, Makati Cin ema Square, Pasong Tamo St ., Makati City Basement-1, Makati Cin ema Square, Pasong Tamo St ., Makati City RFA REFERENCE NO: RFA DATE ISSUED: DATE APPROVED:
Bonifacio Global City, Taguig, Philippines 1630
Tel nos. 811-1777 / 811-1778 e-mail: nbf@globelines.com.ph Tel nos. 811-1777 / 811-1778 e-mail: nbf@globelines.com.ph Bonifacio Global City, 1634 Taguig City
Fax no. 844-3667 Fax no. 844-3667 SCALE: As indicated