Studio Unit D
Studio Unit D
SH WF-7 D
-
SHEET NO. STUDIO T&B SHEET NO. STUDIO T&B
-
Sheet No.
STUDIO KITCHEN C --- SEE DETAILS SEE DETAILS
7 -
800
A-711 A-711
--- SEE DETAILS SHEET NO. STUDIO T&B
A-711
--- SEE DETAILS
EQ
EQ
SHO. C-5 C-1 A-710
MAX +2500
100
PART OF
FF-11
TH ELEVATOR
300
2350
2350
T&B T&B FF-11
2450
2450
2450
START OF TILES
WC
2750
2750
2750
FF- 8 FF- 8
D
PART OF 5
WF-3
1450
C
RES'L UNIT WF-8
D
EQ
EQ
C-3
LAV +2400
START OF TILES
100
100
100
BEAM BEAM
5100
Y21 -
Sheet No.
STUDIO KITCHEN
Y21 Y21 Y21
--- SEE DETAILS WF-3
A-712
E
675
675
675
2100
KITCHEN AREA WF-3 FF-11
LEGEND
EQ
EQ
G
FF-11
C-1
SYMBOLS: WALL TYPES :
7900
7900
7900
+2500
DINING AREA FF- 8
D
FF-11 DOOR SCHEDULE A 100MM THK. CHB
FF- 8 DINING AREA DOOR NO.
W
B
100
FF-11 WINDOW SCHEDULE 150MM THK. CHB 10 Retails + On Site Parking @ Ground Floor, 3 Podium Parking,
EQ
EQ
A
WI NDOW NO.
A Amenity @ 5th Floor, and 3 Residential Towers with 29 Storeys
300 FF -
IN TERMEDIATE BEAM C 100MM THK . EPS
D B
FLOOR
D B FIN. NO.
SA NDWICH PA NEL
5450
5450
5450
5450
4350
4350
D 150MM THK . EPS
WALL FINISH
SD
C C WALL TY PE WA LL FIN ISH SCHEDULE
SA NDWICH PA NEL
BEAM
E
BEAM/BULKHEAD
4475
4475
4475
FLOOR ELEVA TION PRECAST CON CRETE
WF-3
EQ
EQ
D DEP
HT FLOO R DEPRESSION F 100MM THK. DRY WA LL
WF-3
A REYNALDO C. MADRIDEJOS
LIVING AREA
CE ILING FIN.
CE ILING HT
CEILING FINISH
SCHEDULE
G RC WALL/COLUMN TSD Officer- Circuit OpCen
2800
LIVING AREA
FF-11
LIGHTING SYMBOLS: WALL FINISHES :
FF-11
EQ
EQ
COMPA CT FLOURE-
WF - 3
PAIN TED CONCRETE FINISH RAFAEL ANGELO H. RONCALE ANGELO M. OLITOQUIT
C-5 C-5 a SCENT LAMP(CFL) TSD Junior Officer TSD Junior Officer
MAX MAX
WF - 7
300MMX300MM CERAMIC TILES
CFL CON NECTED TO UP TO 1500MM FROM FFL, REST
a( E)
WF-3 EMERGENCY POWER SUPPLY PLA STERED FINISH
BEAM BEAM
C 300MMX300MM CERAMIC TILES 1
150 600 100 W RECEPTACLE WF - 8
LAYER FROM FFL ,REST PLA STERED JESSALIE ELISA MARIE A. CRUZ
FINISH
1 REC
TSD Supervisor
Y19 Y19 Y19 Y19 S SWITCH WF - 9 DRY WA LL SYSTEM
PAIN TED FINISH
A1 DETAILED PLAN A2 REFLECTED CEILING PLAN A4 REFLECTED CEILING PLAN A4 TILE LAY OUT C- 1
HT
12MM THK GYPSUM BOARD ON
SUSPENDED CEILING SY STEM,
PAIN TED FINISH
R
RANGE C.O
on how to fabricate, install, terminate; verify and indicate in shop drawings elevation,
dimension, orientation, connection details, clearances, coordinated with other trade
contractors for proper constructability prior to any fabrication or installation to
AR-707 SCALE : A1 - 1:50 AR-707 SCALE : A1 - 1:50 AR-707 SCALE : A1 - 1:50 AR-707 SCALE : A1 - 1:50 C-3 10MM THK MO ISTURE RESISTANT achiev e Architectural, Interior Design, Landscape, Structural and Electro-Mechanical
GYPSUM BOARD ON SUSPENDED
A3 - 1:100 A3 - 1:100 A3 - 1:100 A3 - 1:100 HT CEILING SYSTEM, PAIN TED FINISH
WD
WA SHER/ DRYER C.O design intent of the project. Advise MDC COG and TSD accordingly and promptly in
writing on conflict or lacking information in order to meet the Designers intent and
C-5 PLA IN RUBBED CONCRETE,
WINDOW TYPE A IRCON C.O Project Requirements as specified in the contract documents, issued plans and
HT PAIN TED FINISH ACCO
specifications. For any alteration, Subcontractor to submit proposal indicating all
X13 X13 Y21 Y20 Y19 FIRE PROTECTION SYMBOL: U RANGE HO OD UTILITY BOX
details duly coordinated with other trade contractors clearly specifying proposed
changes for Consultants approval prior to commencement of the work.
2825 2750 675 4475
1088 1088 1088 1088 PENDEN T SPRIN KLER HEAD U WA TER HEATER UTILITY BOX For Designers standard details and specifications, please refer to issued FCD. RED
1147 1130 WH
LINING must be reflected in IFC drawings for actual site changes and submitted to
125 50
2825 7th Floor 7th Floor TSD as a requirement for Billing Clearance.
20600 20600 UPRIGHT SPRIN KLER HEAD CA TV OUTLET
For finish ceiling clearance height, please refer to the Arch'l Schedule of Finishes from
650
SIDE THROW SPRINKLER HEAD TELEPHONE OUTLET Visionary Architecture. Should there be any conflict or problem achiev ing the
174 headroom clearances, please inform MDC Operations and TSD for proper resolution
prior to any commencement of the work.
MECHANICAL SYMBOL : PANEL BOA RD
For any inconsistency/ discrepancy/ revision/ changes/ alteration of IFC plans due to
WAC
WINDOW TYPE A IR HEAT DETECTOR site condition/ construction methodology and strategy. Kindly inform the MDC-TSD for
524
H
CONDITIONIN G proper coordination and documentation.
2850
2850
2675
EXHAUST STUB OUT S
SMOKE DETECTOR
REVISION:
2300
230
2150
EXHAUST FAN A FIRE ANNUNCIATOR No. Description Date
1300
1300
VEN T CAP
2750
300
6th Floor 6th Floor 300MMX300MM
256
86 HA ND HOLE
17750 17750
100
Y21 TYP. STUDIO UNIT A TYP. STUDIO UNIT A SLAB SOFFIT LINE SLAB SOFFIT LINE SLAB SOFFIT LINE
200
200
350
@1ST-28TH RES'L LEVEL @1ST-28TH RES'L LEVEL
675
AR-707 SCALE : A1 - 1:50 AR-707 SCALE : A1 - 1:50 (1-DUCT) 200MM OR SAME DEPTH
A3 - 1:100 BULKHEAD(A) 200MM OR SAME AS ADJACENT BEAM
A3 - 1:100 (2-DUCT) DEPTH *USE IF ONLY WATER SUPPLY OR FIRE
350MM OR SAME DEPTH AS ADJACENT PROTECTION LINE WILL PASS THRU
AS ADJACENT BEAM BEAM BULKHEAD
X13 Y19 Y20 Y21
A 2825 4475 675 2750
1088 1088 1088 1088 IF 150MM Ø600 IF 150 MM Ø 600
D B
125 50
1041 1139 7th Floor IF 100MM Ø400 IF 100MM Ø 400
7th Floor
C 20600
500 50
1520
20600
BEAM DEPTH
BEAM DEPTH
VERIFY
VERIFY
4475
PART OF
PART OF PART OF UNIT B
UNIT A 75150 150 75 UNIT B PART OF 75 150 150 150 15075
UNIT A
2850
2850
200
375 375
2675
2850
BULKHEAD(D)
SAME DEPTH
2150
BULKHEAD(E)
2300
1550
1300
1450
750
964
NOTES :
300
300
6th Floor
300
6th Floor
Y19 17750
17750
1. ASTERISK (*) INDICATES UNIT AS MIRROR OF LAY OUT SHOWN KEYPLAN
2. IDENTIFY "MAX"= BASE THE HT ON BEAM/GIRDER SOFFIT DEPTH
3. COLUMNS TAPER AS FLOOR LEVEL INCREASES.
4. LIGHT SWITCH MUST BE ALIGNED TO ANY ADJACENT CONVINIENCE OUTLET APPROVED BY:
5. IN CASE PANEL BOARDS,SWITCHES &/ OR OUTLETS ARE ON OPPOSITE SIDE OF
A WALL,ONE SIDE MUST BE ADJUSTED TO AVOID CONFLICT BETWEEN UTILITY
673 TYP. STUDIO UNIT D BOXES (SUBMIT CSD FOR APPROVAL)
TYP. STUDIO UNIT D @1ST-28TH RES'L LEVEL 6. SOAP HOLDER,TISSUE PAPER HOLDER, FLOOR DRIAN&FLOOR CLEAN OUT
TYP. STUDIO UNIT D MUST BE ALLIGNED TO A TILE EDGE.
@1ST-29TH RES'L LEVEL @1ST-28TH RES'L LEVEL 7. ACTUAL UNIT DIMENSIONS SHALL BE VERIFIED WITH MAIN FLOOR PLAN
A5 POWER LAY OUT ELEVATION C B4 ELEVATION D 8. MAIN DOOR FLOOR FINISH STARTING POINT SHOULD BE IN BETWEEN MAIN
DOOR PANEL THICKNESS (SEE MISCELLANEOUS DETAILS) ROCHELLE MARIE M. BALUYOT KRISTINE THERESE G. HORTINELA
BC AR-707 SCALE : A1 - 1:50
9. VERIFIY STRUCTURAL FOR BEAMS &GIRDERS SIZES.
10. FOR LOCATION OF
Design Manager MDC DID-CG Project Architect MDC DID-CG
1PS-1
T1C-1(700x1200)
DEP REVISION NUMBER REVISION SLAB (WxD) COLUMN 13. FOR ACCU FCU CONNECTION LINE,CONSIDER PIPE SLEEVES AS NECESSARY
REFERENCE SLAB MARK
SHEARWALL UPDATED/ RESOLVED ISSUES REVISION CLOUD CLOUD ELEVATION -50 COLUMN MARK :VERIFY STRUCTURAL AND MECHANICAL FOR DETAILS.
INTERMEDIATE BEAM ON GOING RFI CUTTING PLANE REYNARD D. MARANAN JESUS S. ANIANO JR.
1 SECTION NAME SECTION 1PG-1(500x700) BEAM DIMENSIONS Project Director MDC CMG - Avida Project Director MDC CMG - Avida
(WxD) BEAM
GIRDER SHAFT/ CHASE AR-101 SHEET NUMBER CUTTING BEAM MARK
DESIGN AND BUILD: ARCHITECTURAL CONSULTANT: STRUCTURAL CONSULTANT: MECHANICAL CONSULTANT: FIRE PROTECTION CONSULTANT: ELEVATOR CONSULTANT: OWNER/DEVELOPER: SHEET CONTENTS: SHEET NO: ISSUE:
LANDSCAPE CONSULTANT: ELECTRICAL CONSULTANT: PLUMBING CONSULTANT: DRAINAGE CONSULTANT: QUANTITY SURVEYOR:
DATE: July 01,2019 (Monday)
MAKATI DEVELOPMENT CORPORATION REVISION NO: PROJECT CODE: ATMS- AR
31st St. cor 2nd Ave. 1/F Bonifacio Technology Center, Basement-1, Makati Cin ema Square, Pasong Tamo St ., Makati City Basement-1, Makati Cin ema Square, Pasong Tamo St ., Makati City
#909 40th Street North, Bonifacio Triangle DETAILED PLAN,REFECTED CEILING PLAN AND TILE LAY OUT 0
RFA REFERENCE NO: RFA DATE ISSUED: DATE APPROVED:
Bonifacio Global City, Taguig, Philippines 1630
Tel nos. 811-1777 / 811-1778 e-mail: nbf@globelines.com.ph Tel nos. 811-1777 / 811-1778 e-mail: nbf@globelines.com.ph Bonifacio Global City, 1634 Taguig City
Fax no. 844-3667 Fax no. 844-3667 SCALE: As indicated