i | ITEM No. 0G/ leisf@ror UNIT |(UNIT/MANDAYS)
i, EARTHWORKS.
Clearing and Grubbing_
| TEM 800 a Cri & ress Ae oe sqm] 136.00_m2/MD_| 17.0000 m2/Hr.
5) Undergrowth & Smal Bushes sq.m. [272,00 _m2/MD_| 34.0000 ___m2/tr.
~ Structures Excavation
(rears common earth cum. T00__m3IMD_| 0.1250 _mayHr.
i) Sand cum 5.17__m3/MD_| 0.6463 __m3/Hr.
fo) Clay cu.m, 4.15 _m3/MD_| 0.5188 __m3/Hr.
id) Rock cu.m 2.58 __m3/MD_| 0.3225 m3/Hr.
TTEM 804 | - Embankment
la) Backfilling _ [oum. [8:30 3D
b) Spreading, Tamping and Grading cum. | 14.21 _m3/MD.
fe) Placing Estembre Fill cum. | 1660 _m3/MD.
id) Gravel Fill
d-1) Hand Placed cu.m. 1.36
7[ 2) Placing Binder-gravel cum. |__ 4.00
i, TERMITE CONTROL
TTEM 1000] - Termite Control Works
fa) Soil Poisoning - Cordoring sq.m.
b) Soil Poisoning - Drenching. ‘q.m.
[c) Wood Preservation r
il. DAMPROOFING/MOISTURE CONTROL |
~ Damproofing/Moisture ControlDERIVED/OUTPUT
UNIT |“(GNIT/MANDAYS) (UNITIHOURS) _
sq.m 316 _ mami 7.0200 __ma/tr.
Oa Om $q.m. 6.26 _m2MD_|__0.7625__m2/Hr.
Tonae sq.m. 6.26 __ma/MD_| 0.7825 __m2/Hr.
0.2388 __m2/Hr.
Elevated & shored slab sq.m. 1.91 __m2/MD_|
Db on Grade Sirp of Forms sq.m. 2.38__ma/MD 0.2975 __m2/Hr.
ID. FORMWORKS
Time required for erecting and
stripping forms per 100m2 of
(Contract Surface
fa) Concrete Footing & Foundations 3q.m. T7_m2MD [0.2213 m2/Hr.
b) Concrete on Slab on Grade ‘sq.m. 2.58__m2/MD_| 0.3225 m2/Hr.
fe), Concrete Columns and Beams ‘sq.m. 1.22__m2MD_| 0.1525 m2/Hr.
id) Concrete Walls sq.m. 1.36 0.1700___m2/Hr.
le) Concrete Structural Siab
Cast-In-Place Culvert and _[sq.m- 1.29
Manholes
[in General, Two man can erect
20BD.FT-/HR. or remove forms
lat the rate of 44BD.FT/HR.
gag |E. REINFORCEMENT:
ja) Fabrication (Cut & Bend)
b) Placing _
7 |_bat) Footing and Foundations
Structural
‘Slab on Grade.
B33) Columns, Beams and R.C. Wall Kg.'b.7) Floor Fin. Unhardened
4) Accoustic Celling
¢.5) Ceiling Eaves installation
¢.6) Fascia Board installation
! b.8) Concrete Fin. Hardened 0.5950 maar
[@) Concrete Mixing
¢.1) Manual Mixing ‘sq.m. 0.41 ma/MD 0.051:
| (6.2) One-Bagger Mixing — ‘sq.m. 3.81 m3MD_| 0. 478 oe
MASONRY WORKS
| TTEM 764 |, - Masonry Works
gh BFA CHE Laying |
a.1) CHB 4" ‘sqm 5.10 m2MD | 0.6375 mar
a2) CHB 6" sqm. [4.25 maM0_| 0.5313 momar
2.3) CHB 8” —[-sq.m. 3.40 m2MD_[ 0.4250 maser.
b) Brick Works (1.0 x 20m) sq.m. [13.60 m2MD_| 1.7000 mamir
jc) Red Bricks (1/4" x 2" x Ey) sq.m. 1.36 m2/MD 0.1700 m2/Hr.
fa Laying of Adobe 5q.m. 5.98 m2MD_| 0.7475 mare.
Vi. CARPENTRY WORKS:
ITEM 1003] - Carpentry and Joinery
fa) Wall | a]
a.1) Plywood Partitions Pe. 680 PCIMD | 0.8500 PCMH
a2) T&G Siding bf. 48.55 BF/MD | 6.0688 BF/Hr
4.3) Siding Frame Works bf. 25.16 BFIMD | 3.1450 BF/Hr
a.4) Wood Walls and Partitions cu.m. 13.60 m3/MD_ 1.7000 m3/MD_
‘a.5) Wood Walls Partitions cum. [13.60 __m3/MD_| 1.7000 m3/MD.
a.6) Panel Wall 0.95 m2/MD 0.1188 m2/MD_
2.7) Double Wall Partitions 13.60__m3a/MD_ | 1.7000___ma/MD
t b) Floor
b.1) T&G Flooring bf 48.55 BFIMD_| 6.0688 BF/Hr
b.2) Floor Framing bf 14.01 BF/MD_ 1.7513 BF/Hr
[c) Wooden Post Erections bf 15.98 _BF/MD_| 1.9975 BF/Hr
Ceili
©) Ceiling Frame Works (oist, nailers
‘and Handrails) 5.10 __m2MD — mare
©: Installation 6.80 _sheets/MD E ‘sheets/Hr,
Ses ‘Board Installation 6.80_sheets/MD| 0.8500 _ sheets/Hr.
5.64 m2/MD (0.7050___m2/Hr.
5.64 ___m2/MD_ 0.7050 m2/Hr.
16.32 m2/MD 2.0400 m2/Hr.
52.29 BF/MD_
6.5363 BF/Hr
S18 BF/MD_
‘81 BF/MD.
Giatbemaior |B} sane
is plight | — 17.00 Pighinab |
4.7263 __ BF/Hrz mi 00 EX
pes. 410.00 =JMD |" 1.2500 pes Hr
4 Barrel Boris ._| 15.00 pes /MD_| 1.8750 pos srr
ITEM 1005] - Stell Windows — pe 1.00 pesMID_ | 0.1250 —pomrir
fa) Casement Type pe. 4,00 pe./MD_| 0.1250 peHr
b) Awning Type pe._| 1.00 pe /MD. 0.1250 po/Hr
jc) French Type pe. 4.00 pe/JMD | 0.1250 pe JHr
id) Fixed Steel pc. 1.00 pe/JMD_ | 0.1250 pe srir
[e) Louver Window
1. Fixed Metal Louver Be. 1.00 pe/MD_| 0.1250 pean
2. Fixed G.I. Sheets pe. 1.00 pe/MD_| 0.1250 pe Hr
ITEM 1006| - Steel Doors and Frames =
fa) Hollow Metal Door
1. Fabrication PC. 0.07 pe/MD_ | 0.0088 pes
2. Installation pe. 7.00 pc/MD | 0.1250 pe/Hr
[b) Steel bars pe. 1.00 pe/MD_| 0.1250 pesHr
ITEM 1007] - Aluminum Glass Doors
fa) Aluminum Frame Pe. 068 peJMD_| 0.0850 pe/Hir
b) Sliding Glass Door Pe. 0.54 pc/MD_| 0.0675 po /Hr
TEM 1008] = Aluminum Glass Windows
fa) Aluminum Frame f pe. 1.00 peJMD_[~ 0.1250 paler
TEM 1009] - Jalousie Windows
[a) Aluminum Jalousie sq.m. 270 m2MD | _0.3375 __maiHr
Ib) Glass Janousie ‘SQ.M. 2.70 m2MD | 0.3375 __ma/Hr
ic) Wood Jalousie
2.70
m2/MD
0.3375Vill. ROOF FRAMING WORKS
- Timber Structure.
la) Wooden Truss
1. Fabrications
2. Erections
3. Installations
b) Wood Gift Installation
\c) Wood Plate Installation
|) Wood Purlines Installations
Je) Wood Media Aqua Frame
6.2500 BF/Hr_|
=
TEM 403 | — Metal Structures
'a) Steel Truss
1. Fabrications kg. [136.00 kgiiD_| 17,0000 gir
Heavy Sections:
L a. Erections Set 010 sevMD_| 0.0125 seu
. Installations set 0.10 sevMD_| 0.0125 _sewrir 4
fis I set 0.40 se/MD 0.0500 __setHir
b. Installations
0.40
‘sevMD_
0.0500
2. Painting
1b) Stee! Purlins Installations
ic) Steel Media Agua Frame
IX. ROOFING WORKS:
= Corrugated Metal Roofing
- Pre Painted Metal Sheets
a) Installation of G.I. Sheets= Plain Cement Finish
fa) Plain Cement Floor Tiles 9.52 m2/MD_ 1.1900 ma/Hir
[b) Plain Cement Floor Finish with color 483 m2/MD_ | 0.6038 __maHr
L ITEM 1022] - Stucco Finish
fa) Plain Cement Stucco Finish im. 4.08 m2/MD 0.5100 marr
[b) Plain Cement Floor Stucco with color 5q.m. 3.50__m2/MD_ 0.4375 m2/Hr
ITEM 1023] - Granolithic Marble Works 5q.m. 231 _m2/MD 0.2888 ma/Hr
ITEM 1024| - Pea Gravel wash Out Finish sq.m. 4.76 m2/MD 0.5950 ma/Hr
ITEM 1025] = Bush hammered Finish sq.m. | 2.50 _m2/MD 0.3125 mar
ITEM 1026[ - Peeble wash out Finish sq.m. 4.76 m2/MD 0.5950 m2/Hr
ITEM 1027| - Cement Plaster Finish ‘sq.m. 9.50 m2/MD 1.1875 mar
ITEM 1028] - Synthetic Adobe Finish ‘sq.m. 2.50 m2/MD 0.3125 mar
ITEM 1029] - Granatite Wash - Out Finish ‘sq.m. 4.76 m2/MD 0.5950 m2/Hr
ITEM SPL |a) Marble Tiles Finish ‘sq.m. 3.40 m2/MD 0.4250 m2/Hr
it [b) Granatite Tile Finish $g.m. 3.40 m2/MD 0.4250 m2/Hr
jc) 1/2" x 2" x 8" red Blocks $g.m. 1.36 m2/MD 0.1700 m2/Hr
[d) Manolithic terrazo Finish sq.m. 6.04 m2/MD. 0.7550 m2/Hr
le) Synthetic Marble Tiles sq.m. 149 m2/MD 0.1863 m2/Hr
if) Wall Papers $q.m. 0.88 m2/MD_ 0.1100 m2/Hr
Plastered Ceiling sq.m. 2.24 m2/MD 0.2600 m2/Hr
lh) Mozaic Floor Tiles. ‘$q.m. 0.82__m2/MD- 0.1025 __m2sHr
XI._PAINTINGVARNISHING WORKS.
IA. Painting
"a) Plain Cement Paint Exterior
- Painting, Vamishing and other related works
b) Plain Cement Paint Metal
©) Exposed Aggregates Tool paint Finish
d) Ferrous Metal Finishb.1) 1/2" Dia. fin.m. 0.41 LM/MD 0.0513 LinvHr
b.2) 3/4" Dia. lin.m. 0.41 LM/MD 0.0513 LinvHr
b.3) 1"- 1 1/4" Dia. lin.m. 0.47 LM/MD 0.0588 im
a4) 1 1/2" - 2" Dia. tin.m. 0.52 LW/MD 0.0650 LinvHr
a.5) 2 1/2" Dia. lin.m. 0.62 LM/MD 0.0775 invHr
a6) 3° Dia. Tin.m. 0.68 LM/MD_|_0.0850__Lm/Hr
a.7) 4" Dia. 0.83 LW/MD 0.1038 Lm/Hr
[c) Cast Iron Pipe
.1) 2" Dia. 1.39 LMMD_|_0.4738__— LmiHir
c.2) 4" Dia. 2.07 LW/MD 0.2588 Lmv/Hr
a c.3) 6" Dia. 3.11 LMW/MD 0.3888 Liv
c.4) 82" Dia. 4.15 LM/MD 0.5188, Lin/Hr
¢.5)10" Dia. 6.22 LM/MD 0.7775, LimvHr
c.6) 12" Dia. 6.57 _ LM/MD_ 0.8213 Lv
c.7) 14" Dia. 763 LMW/MD 0.9538 Lim/Hr
c.8) 16" Dia. 8.67 LM/MD 1.0838 Lin/Hr
©.9) 18" Dia.
©.10) 20" Dia,
6.11) 24" Dia.
1.70 LM/MD
| 4.70 LMM |
| 2.04 LMM |
| _ 0.83 Lm |
|__ 1.04" LMM _|[a en
= Wires and Wiring Devices
la) Wiring
18.7500 Livir
L Ib) Devices 1.2500 pes/Hr.
ITEM 1702] - Power Load Center, Switch Gear and Panel Boards
&, fa) Lighting sets 8.00 __sevMD_ 7.0000 setHr
b) Panel Boards circuit 8.00 _circuitMD | 1.0000
L SOURCES AND AREFERENCE
1. DPWH Standard Specifications, vol. 1! & III, 1995 edition
E 2. DPWH- BOC data on various building structures previously implemented
3. Construction Manpower Development Foundation (CMDF)
, 4. Construction Estimate Handbook by Velasco
@
ans
=
iS)
S)
[NS)