0% found this document useful (0 votes)
209 views9 pages

DUPA Capabilities

Detailed Unit Price Analysis, Mandays

Uploaded by

mscubilla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
209 views9 pages

DUPA Capabilities

Detailed Unit Price Analysis, Mandays

Uploaded by

mscubilla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 9
we ° MANUAL ON COST ESTIMATION - FOR SCHOOL BUILDINGS e VOLUME I - DE i | ITEM No. 0G/ leisf@ror UNIT |(UNIT/MANDAYS) i, EARTHWORKS. Clearing and Grubbing_ | TEM 800 a Cri & ress Ae oe sqm] 136.00_m2/MD_| 17.0000 m2/Hr. 5) Undergrowth & Smal Bushes sq.m. [272,00 _m2/MD_| 34.0000 ___m2/tr. ~ Structures Excavation (rears common earth cum. T00__m3IMD_| 0.1250 _mayHr. i) Sand cum 5.17__m3/MD_| 0.6463 __m3/Hr. fo) Clay cu.m, 4.15 _m3/MD_| 0.5188 __m3/Hr. id) Rock cu.m 2.58 __m3/MD_| 0.3225 m3/Hr. TTEM 804 | - Embankment la) Backfilling _ [oum. [8:30 3D b) Spreading, Tamping and Grading cum. | 14.21 _m3/MD. fe) Placing Estembre Fill cum. | 1660 _m3/MD. id) Gravel Fill d-1) Hand Placed cu.m. 1.36 7[ 2) Placing Binder-gravel cum. |__ 4.00 i, TERMITE CONTROL TTEM 1000] - Termite Control Works fa) Soil Poisoning - Cordoring sq.m. b) Soil Poisoning - Drenching. ‘q.m. [c) Wood Preservation r il. DAMPROOFING/MOISTURE CONTROL | ~ Damproofing/Moisture Control DERIVED/OUTPUT UNIT |“(GNIT/MANDAYS) (UNITIHOURS) _ sq.m 316 _ mami 7.0200 __ma/tr. Oa Om $q.m. 6.26 _m2MD_|__0.7625__m2/Hr. Tonae sq.m. 6.26 __ma/MD_| 0.7825 __m2/Hr. 0.2388 __m2/Hr. Elevated & shored slab sq.m. 1.91 __m2/MD_| Db on Grade Sirp of Forms sq.m. 2.38__ma/MD 0.2975 __m2/Hr. ID. FORMWORKS Time required for erecting and stripping forms per 100m2 of (Contract Surface fa) Concrete Footing & Foundations 3q.m. T7_m2MD [0.2213 m2/Hr. b) Concrete on Slab on Grade ‘sq.m. 2.58__m2/MD_| 0.3225 m2/Hr. fe), Concrete Columns and Beams ‘sq.m. 1.22__m2MD_| 0.1525 m2/Hr. id) Concrete Walls sq.m. 1.36 0.1700___m2/Hr. le) Concrete Structural Siab Cast-In-Place Culvert and _[sq.m- 1.29 Manholes [in General, Two man can erect 20BD.FT-/HR. or remove forms lat the rate of 44BD.FT/HR. gag |E. REINFORCEMENT: ja) Fabrication (Cut & Bend) b) Placing _ 7 |_bat) Footing and Foundations Structural ‘Slab on Grade. B33) Columns, Beams and R.C. Wall Kg. 'b.7) Floor Fin. Unhardened 4) Accoustic Celling ¢.5) Ceiling Eaves installation ¢.6) Fascia Board installation ! b.8) Concrete Fin. Hardened 0.5950 maar [@) Concrete Mixing ¢.1) Manual Mixing ‘sq.m. 0.41 ma/MD 0.051: | (6.2) One-Bagger Mixing — ‘sq.m. 3.81 m3MD_| 0. 478 oe MASONRY WORKS | TTEM 764 |, - Masonry Works gh BFA CHE Laying | a.1) CHB 4" ‘sqm 5.10 m2MD | 0.6375 mar a2) CHB 6" sqm. [4.25 maM0_| 0.5313 momar 2.3) CHB 8” —[-sq.m. 3.40 m2MD_[ 0.4250 maser. b) Brick Works (1.0 x 20m) sq.m. [13.60 m2MD_| 1.7000 mamir jc) Red Bricks (1/4" x 2" x Ey) sq.m. 1.36 m2/MD 0.1700 m2/Hr. fa Laying of Adobe 5q.m. 5.98 m2MD_| 0.7475 mare. Vi. CARPENTRY WORKS: ITEM 1003] - Carpentry and Joinery fa) Wall | a] a.1) Plywood Partitions Pe. 680 PCIMD | 0.8500 PCMH a2) T&G Siding bf. 48.55 BF/MD | 6.0688 BF/Hr 4.3) Siding Frame Works bf. 25.16 BFIMD | 3.1450 BF/Hr a.4) Wood Walls and Partitions cu.m. 13.60 m3/MD_ 1.7000 m3/MD_ ‘a.5) Wood Walls Partitions cum. [13.60 __m3/MD_| 1.7000 m3/MD. a.6) Panel Wall 0.95 m2/MD 0.1188 m2/MD_ 2.7) Double Wall Partitions 13.60__m3a/MD_ | 1.7000___ma/MD t b) Floor b.1) T&G Flooring bf 48.55 BFIMD_| 6.0688 BF/Hr b.2) Floor Framing bf 14.01 BF/MD_ 1.7513 BF/Hr [c) Wooden Post Erections bf 15.98 _BF/MD_| 1.9975 BF/Hr Ceili ©) Ceiling Frame Works (oist, nailers ‘and Handrails) 5.10 __m2MD — mare ©: Installation 6.80 _sheets/MD E ‘sheets/Hr, Ses ‘Board Installation 6.80_sheets/MD| 0.8500 _ sheets/Hr. 5.64 m2/MD (0.7050___m2/Hr. 5.64 ___m2/MD_ 0.7050 m2/Hr. 16.32 m2/MD 2.0400 m2/Hr. 52.29 BF/MD_ 6.5363 BF/Hr S18 BF/MD_ ‘81 BF/MD. Giatbemaior |B} sane is plight | — 17.00 Pighinab | 4.7263 __ BF/Hr z mi 00 EX pes. 410.00 =JMD |" 1.2500 pes Hr 4 Barrel Boris ._| 15.00 pes /MD_| 1.8750 pos srr ITEM 1005] - Stell Windows — pe 1.00 pesMID_ | 0.1250 —pomrir fa) Casement Type pe. 4,00 pe./MD_| 0.1250 peHr b) Awning Type pe._| 1.00 pe /MD. 0.1250 po/Hr jc) French Type pe. 4.00 pe/JMD | 0.1250 pe JHr id) Fixed Steel pc. 1.00 pe/JMD_ | 0.1250 pe srir [e) Louver Window 1. Fixed Metal Louver Be. 1.00 pe/MD_| 0.1250 pean 2. Fixed G.I. Sheets pe. 1.00 pe/MD_| 0.1250 pe Hr ITEM 1006| - Steel Doors and Frames = fa) Hollow Metal Door 1. Fabrication PC. 0.07 pe/MD_ | 0.0088 pes 2. Installation pe. 7.00 pc/MD | 0.1250 pe/Hr [b) Steel bars pe. 1.00 pe/MD_| 0.1250 pesHr ITEM 1007] - Aluminum Glass Doors fa) Aluminum Frame Pe. 068 peJMD_| 0.0850 pe/Hir b) Sliding Glass Door Pe. 0.54 pc/MD_| 0.0675 po /Hr TEM 1008] = Aluminum Glass Windows fa) Aluminum Frame f pe. 1.00 peJMD_[~ 0.1250 paler TEM 1009] - Jalousie Windows [a) Aluminum Jalousie sq.m. 270 m2MD | _0.3375 __maiHr Ib) Glass Janousie ‘SQ.M. 2.70 m2MD | 0.3375 __ma/Hr ic) Wood Jalousie 2.70 m2/MD 0.3375 Vill. ROOF FRAMING WORKS - Timber Structure. la) Wooden Truss 1. Fabrications 2. Erections 3. Installations b) Wood Gift Installation \c) Wood Plate Installation |) Wood Purlines Installations Je) Wood Media Aqua Frame 6.2500 BF/Hr_| = TEM 403 | — Metal Structures 'a) Steel Truss 1. Fabrications kg. [136.00 kgiiD_| 17,0000 gir Heavy Sections: L a. Erections Set 010 sevMD_| 0.0125 seu . Installations set 0.10 sevMD_| 0.0125 _sewrir 4 fis I set 0.40 se/MD 0.0500 __setHir b. Installations 0.40 ‘sevMD_ 0.0500 2. Painting 1b) Stee! Purlins Installations ic) Steel Media Agua Frame IX. ROOFING WORKS: = Corrugated Metal Roofing - Pre Painted Metal Sheets a) Installation of G.I. Sheets = Plain Cement Finish fa) Plain Cement Floor Tiles 9.52 m2/MD_ 1.1900 ma/Hir [b) Plain Cement Floor Finish with color 483 m2/MD_ | 0.6038 __maHr L ITEM 1022] - Stucco Finish fa) Plain Cement Stucco Finish im. 4.08 m2/MD 0.5100 marr [b) Plain Cement Floor Stucco with color 5q.m. 3.50__m2/MD_ 0.4375 m2/Hr ITEM 1023] - Granolithic Marble Works 5q.m. 231 _m2/MD 0.2888 ma/Hr ITEM 1024| - Pea Gravel wash Out Finish sq.m. 4.76 m2/MD 0.5950 ma/Hr ITEM 1025] = Bush hammered Finish sq.m. | 2.50 _m2/MD 0.3125 mar ITEM 1026[ - Peeble wash out Finish sq.m. 4.76 m2/MD 0.5950 m2/Hr ITEM 1027| - Cement Plaster Finish ‘sq.m. 9.50 m2/MD 1.1875 mar ITEM 1028] - Synthetic Adobe Finish ‘sq.m. 2.50 m2/MD 0.3125 mar ITEM 1029] - Granatite Wash - Out Finish ‘sq.m. 4.76 m2/MD 0.5950 m2/Hr ITEM SPL |a) Marble Tiles Finish ‘sq.m. 3.40 m2/MD 0.4250 m2/Hr it [b) Granatite Tile Finish $g.m. 3.40 m2/MD 0.4250 m2/Hr jc) 1/2" x 2" x 8" red Blocks $g.m. 1.36 m2/MD 0.1700 m2/Hr [d) Manolithic terrazo Finish sq.m. 6.04 m2/MD. 0.7550 m2/Hr le) Synthetic Marble Tiles sq.m. 149 m2/MD 0.1863 m2/Hr if) Wall Papers $q.m. 0.88 m2/MD_ 0.1100 m2/Hr Plastered Ceiling sq.m. 2.24 m2/MD 0.2600 m2/Hr lh) Mozaic Floor Tiles. ‘$q.m. 0.82__m2/MD- 0.1025 __m2sHr XI._PAINTINGVARNISHING WORKS. IA. Painting "a) Plain Cement Paint Exterior - Painting, Vamishing and other related works b) Plain Cement Paint Metal ©) Exposed Aggregates Tool paint Finish d) Ferrous Metal Finish b.1) 1/2" Dia. fin.m. 0.41 LM/MD 0.0513 LinvHr b.2) 3/4" Dia. lin.m. 0.41 LM/MD 0.0513 LinvHr b.3) 1"- 1 1/4" Dia. lin.m. 0.47 LM/MD 0.0588 im a4) 1 1/2" - 2" Dia. tin.m. 0.52 LW/MD 0.0650 LinvHr a.5) 2 1/2" Dia. lin.m. 0.62 LM/MD 0.0775 invHr a6) 3° Dia. Tin.m. 0.68 LM/MD_|_0.0850__Lm/Hr a.7) 4" Dia. 0.83 LW/MD 0.1038 Lm/Hr [c) Cast Iron Pipe .1) 2" Dia. 1.39 LMMD_|_0.4738__— LmiHir c.2) 4" Dia. 2.07 LW/MD 0.2588 Lmv/Hr a c.3) 6" Dia. 3.11 LMW/MD 0.3888 Liv c.4) 82" Dia. 4.15 LM/MD 0.5188, Lin/Hr ¢.5)10" Dia. 6.22 LM/MD 0.7775, LimvHr c.6) 12" Dia. 6.57 _ LM/MD_ 0.8213 Lv c.7) 14" Dia. 763 LMW/MD 0.9538 Lim/Hr c.8) 16" Dia. 8.67 LM/MD 1.0838 Lin/Hr ©.9) 18" Dia. ©.10) 20" Dia, 6.11) 24" Dia. 1.70 LM/MD | 4.70 LMM | | 2.04 LMM | | _ 0.83 Lm | |__ 1.04" LMM _| [a en = Wires and Wiring Devices la) Wiring 18.7500 Livir L Ib) Devices 1.2500 pes/Hr. ITEM 1702] - Power Load Center, Switch Gear and Panel Boards &, fa) Lighting sets 8.00 __sevMD_ 7.0000 setHr b) Panel Boards circuit 8.00 _circuitMD | 1.0000 L SOURCES AND AREFERENCE 1. DPWH Standard Specifications, vol. 1! & III, 1995 edition E 2. DPWH- BOC data on various building structures previously implemented 3. Construction Manpower Development Foundation (CMDF) , 4. Construction Estimate Handbook by Velasco @ ans = iS) S) [NS)

You might also like