PROJECT TITLE:
PROPOSED
GREENHOUSE
A B C PROJECT
5.00 5.00
DOOR/ ACCESS DOOR/ ACCESS
2.00
CLIENT:
1 1 UNDERGROUND PUMP
TANK/ STORAGE ROOM
2.50
JO-AN AMACANIN
2 2
PROJECT ADDRESS:
2.50
3 3 SIQUIJOR ISLAND
2.50
4 4 SHEET CONTENTS:
2.50
PERSPECTIVE
FOOTING DETAILS
5 5
FOUNDATION PLAN
2.50
GROUND FLOOR PLAN
6 6
GENERAL SPECIFICATIONS
2.50
27.00
7 7
2.50
8 8
2.50
PERSPECTIVE
UNITS ARE IN METERS 9 9
2.50
1 1
A-FRAME BENCH
10 10
HORIZONTAL BENCH
2.50
GENERAL SPECIFICATIONS:
USE 2", SCHEDULE 40 G.I. 11 11
2.50
PIPES FOR THE MAIN
STRUCTURAL ELEMENTS- 12 12
POST, ARCH. WHILE FOR
2.50
SECONDARY ELEMENTS 3.00 0.60
13 13
SUCH AS STRUTS, 0.1M THK CONCRETE
FLOORING ON TOP OF
2.50
HORIZONTAL BRACES, RIDGE VAPOR BARRIER
W/ 10MM REBAR
NURSERY
AREA
PREPARATION
AREA
@ 0.8M O.C.B.W.
AND PURLINS, USE 1.5 INCH 14 14 11 SQM 11 SQM
G.I. PIPES. 2"DIA. G.I. PIPE POST
2.50
0.50 DOOR/ DOOR/
ACCESS ACCESS REVISIONS:
15 15
ALL POST SHOULD BE 10MM DIA. WELDED REBAR
DATE REMARKS
03/26/2023 CLARIFICATION ON THE BENCH LAYOUT
TO ENCASE THE PIPE
EMBEDDED UP TO A B C
0.5METERS.
0.03M THK LEAN 0.03 PREPARED BY:
CONCRETE
CHRISTIAN NIÑO PUSO
ALL WELDING WORKS ON G.I. FOOTING DETAILS FOUNDATION PLAN GROUNDFLOOR PLAN PRC NO. : 0145352
CIVIL ENGINEER
VALIDITY : 13 APR 2025
PIPES SHOULD BE APPLIED UNITS ARE IN METERS UNITS ARE IN METERS UNITS ARE IN METERS PTR NO. :
PLACE : CEBU CITY
DATE
TIN
:
:
WITH ZINC SPRAY (THERMAL SHEET NO.:
OR COLD) TO RESTORE THE SHEET
GALVANIZE COATING.
1