0% found this document useful (0 votes)
12 views3 pages

Contract Enclosure

Uploaded by

James Maala
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views3 pages

Contract Enclosure

Uploaded by

James Maala
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Callie Shower Enclosure

by ArchX Glazing Solutions www.archxglazingsolutions.com


mi A !o!!~!l §!r!l~!. ~l11P.1111. §1111 Jl!1111 Qi!Y facebo9k.99m/shower~nclosurecallie
+63 9611025 564 / +63 945 7906 451 instagram.com/showerenclosure.callie
~h()\Y~r~mg()~1_,!f~-~lli~@glll1!il.C?9m pln~ r~~!-gc:>l!lf~hc:>~r~n~J C?~l!.f"~g~lli~
archxglazingsolutions@gmail.com
© Ocm> O

QUOTATION No. 014941A

James Christian S. Maala ALJgu.st 7, 202J


jamesmaala@gmail.com

Order: Supply and Installation of Frameless Straight Sliding Shower Enclosure


Location: 26B08 Victoria de Morato, Scout Borromeo, Brgy. South Triangle, Quezon City

Sir/Ma'am,
We are pleased to submit our quotation for your evaluation and consideration .

1. Scope of work:
Supply and installation in strict accordance with specifications and at the price stated for each items outlined below:
ITEM APPROX. UNIT
NO. DESCRIPTION DIMENSION QTY PRICE AMOUNT

1 ~i-- Straight Sliding Shower Enclosure 100cm X 199cm 1 set 15,490.00 15,490.00

Click oroduct ohoto to see more of its details online. Sub Total 15 490.00
REMARKS: L11ss; 0.00
AMOUNT IN WORDS: FIFTEEN THOUSAND FOUR HUNDRED NINETY PESOS ONLY TOTAL: Php. 15,490.00

*Quote Is vat exclusive.

Specifications:
ITEM N0. 1
Glass
-10mm Thick Clear Tempered Glass
Hardware
- SUS304, Sliding Rail and Rollers Mirror Finish
- SUS304, 50mm Diameter Point Handle Mirror Finish
- SUS304, 44mm X 44mm Wall to Glass Clamps Mirror Finish
- Mold and Mildew Resistant Sealant
- Weatherproof Stopper

2. Manner of Payment
2.01 Upon site inspection: Payment of an amount equivalent to fifty (50%) percent of the total order cost
shall be paid by the client upon on-site actual measurement and signing of the contract.
2.02 Upon installation/completion of the order: Payment of the remaining balance an amount equivalent
to fifty (50%) percent of the total order cost shall be paid by the client upon installation/completion of the
or.der.
2.03 Mode of Payment: Payments can be made through cash, check, BPI bank transfer and GCash .
3. Production and Delivery
3.01 Site measurement: Actual site measurement for the order will be conducted by our representative
which will include all provisions pertinent to the order.
3.02 Pre-production requirements: The following conditions must be completely complied prior with the
fabrication:
3.02.01 Accomplished duly approved and signed contract by the client or his/her duly authorized
representative and AGS representative. (We'll provide a hard copy of the contract during site inspection)
3.02.02 Payment of the fifty percent (50%) down-payment.
3.02.03 Confirmation of final design and specification duly approved by the client or his/her
authorized representative upon signing of the contract.
3.03 Delivery: The following conditions must be completely conformed:
3.03.01 Delivery will commence after five (5) working days upon satisfaction of pre-production
requirements and confirmation to AGS representative that the site is ready for installation .
3.03.02 The client shall be liable for the safekeeping and security of the finished products. AGS shall
not be liable for any damage and/or loss to the items that it delivered.
3.03.03 The client shall prepare and cover the expenses for the permits/bonds if necessary for the
delivery and installation.
3.04 Installation: AGS installers shall only install finished products supplied and delivered by its team.
4. Completion of the Order
4.01 Acceptance: l)pon completion of work, a Certificate of <;:ompletion shall be presented to the client or
his/her authorized representative for conformity that all items contained in the contract are delivered and
installed in good order and condition and the remaining balance of the agreed total cost is due and payable
and henceforth, turned over completely.
4.02 Acknowledgement receipt: Upon completion of the order, AGS can only issue an
acknowledgement receipt to the client or his/her authorized representative as a proof of documentation for
the completion of the order and that the total cost has been paid.
5. Warranty
5.01 Two-year warranty: Products and accessories fabricated and installed are warranted to be free from
defects in materials and workmanship for a period of two years from the date of completion of the order.
Note: Broken glass caused by its users can't be replaced under warranty.
6. ethers
6.01 Additives: Additional requirements, amendments and/or changes in the approved design and
specifications shall be priced and billed accordingly.

Free Delivery and Installation!


To proceed with the order and book an appointment for the site inspection, kindly accomplish this form.
. CONFIRMATION FORM
Thank you for giving us the chance to be of service to you.
For and on behalf of OBllie Shower Enelosure:

p_,., by, /

Mark ante Conforme:


Sales Rep,e'sentative
Signature

Authorized
Si~natory

Print Name :~ <;.


O'i, ( O"f ( '<S:> l~
0
O')

' '
,- SLIDING lihlL l>ND ROLLERS
304 STAINLESS STEEL MIRROR FINISH

10MM THICK CLEAR


TEMPERED GLASS

-
olo
Ct)

-
O') O')
CD\
...... ,
I FIXED
SOMM 0 POINT HANDLE
I ~ 564 S'fAINLESS S'fEEL MIRROR FINISH
"<i> WW\'\ a cL xgla1-:ingsoiut ons. om
J:

-co
I
ro I
1:5 I
I- WEATHERPROOF STOPPER

44MM X 44MM WALL TO


GLASS SHOWER CLAMP
304 STAINLESS STEEL MIRROR FINISH

FLOOR LIN!!

l.
I
525 li
1000_ _ - - - - /

- - -+---
STRAIGHT
-
SLIDING SHOWER
- - - -- - -
ENCLOSURE
- - -- - - - - - - -
SCALE NTS

Notes,
1. Orientation of door and fixed glass are interchangeable.
2. This type of shower enclosure is not waterproof. Door is unsealed.
3. Requires a zocalo or floor depression to reduce the spillin9 out of water.