W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
WC D D WC WC D WC D PLAN OF THE EXISTING INDUSTRIAL PRODUCTION
3.8X6.4 COMPUTER DEPARTMENT (CF,GF,FF & SF)AT P.E.S COLLEGE
W1 H.O.D LIBRARY STAFF W1 3.8X6.4 CLASS ROOM
3.8X6.4 3.8X6.4 3.8X6.4 STAFF
3.8X6.4
ENVIRONMENTAL LAB
7.8X6.4 W1
CLASS ROOM
7.8X6.4
CENTER
3.8X6.4 11.96X8.9
W1
ENGINEERING, MANDYA
TOILET LADIES ROOM CLASS ROOM
3.8X6.4 3.8X6.4 7.8X6.4
TOILET METROLOGY LAB
W1
W1 3.8X6.4 11.96X8.9
A A A A
AREA OF STATEMENT: AREA OF STATEMENT:
W1 W1 (GROUND FLOOR) (FIRST FLOOR)
D D D D D D D D D D D D
W1 W1 W1 W1 UP W1 W1 W1 W1 W1 W1 W1 UP W1 W1 W1
CORRIDOR 2.19 M WIDE D CORRIDOR 2.19 M WIDE D
LIBRARY: 1) 24.32 Sq. Mt. LADIES ROOM: 1)24.32 Sq. Mt.
W1 W1 W1 W1 W1 W1
CANOPY CANOPY HOD CHAMBER: 1)24.32 Sq. Mt. CLASS ROOM: 1) 49.92 Sq. Mt.
2) 49.92 Sq. Mt.
PLAN OF GROUND FLOOR PLAN OF FIRST FLOOR STAFF: 1) 24.32 Sq. Mt.
2) 24.32 Sq. Mt.
3) 106.44 Sq. Mt.
COMPUTER CENTER: 1) 24.32 Sq. Mt.
ERGONOMICAL LAB: 1)49.92 Sq. Mt.
STAIRCASE AND LAUNGE: 1) 24.32 Sq. Mt.
PARAPET WALL 0.6M HEIGHT METROLOGY LAB: 1) 106.44 Sq Mt.
ROOF SLAB 0.15m
TOILET: 1) 24.32 Sq. Mt.
CORRIDOR: 1) 69 Sq. Mt.
STAIRCASE: 1) 24.32 Sq. Mt.
BBM CM1:6 0.23THK TOTAL: 371 Sq. Mt.
3
TOILET: 1) 24.32 Sq. Mt.
ROOF SLAB 0.15m CORRIDOR: 1) 69 Sq. Mt.
RCC LINTEL1:2:4
TOTAL: 371 Sq. Mt.
RCC CHEJJA O.6M WIDE
BBM CM1:6 0.23THK
ROOF SLAB 0.15m
RCC LINTEL1:2:4 INDEX
RCC CHEJJA O.6M WIDE
1.35
BUILD UP AREA =215.59 Sq. Mt.
BBM CM1:6 0.23THK
GL CONCRETE FLOOR 0.05THK
GL
DOOR (D): 1.2X2.1 Mt.
3
ELEVATION
SECTION AT 'AA' BBM CM1:6 0.23THK WINDOW (W1): 1.4X1.35 Mt.
GL
SSM FOR BASEMENT 1:6 CM GL
CONCRETE BED OF 0.1M THK
WINDOW (W2): 1.4X0.45 Mt.
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
SPECIAL OFFICER SIGNATURE:
STAFF ROOM
7.75X6.3
SEMINAR HALL
15.77X1.9
PRESIDENT:
MACHINE TOOL LAB
7.8X8.9
A A
A A SECRETRY:
UP W2 W2 W2 W2 W2 W2 W2 W2 W2
STORE ROOM
PORTICO 7.75X1.9
W2 W2 D D PRINCIPAL:
PLAN OF SECOND FLOOR
PLAN OF CELLAR FLOOR