0% found this document useful (0 votes)
33 views6 pages

TGB Analog

This is the TGB analog for reference..

Uploaded by

Abhishek Rai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views6 pages

TGB Analog

This is the TGB analog for reference..

Uploaded by

Abhishek Rai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Comment Resolution Sheet for TGB Panel- Project Orange (Customer : TCLIPL)

FIL - 62OP42888_U1_625030001 Rev -


Sr. No TCL comments dt. 24.06.2022 Siemens Reply dt. 21.07.2022 TCL Response 22-07-2022
1 Please change Project title in cover sheet Noted and the drawing will be revised. Ok Noted
2 Revision history should not be blank Siemens follows revision marking philosophy like Rev - , Rev A, Rev B. So it will be updated in Rev A only. Ok Noted
3 Indicate the gauge diameter in front view. Noted and the drawing will be revised. Ok Noted
4 Provide holding clamps to hold the tube over the support plate It is already considered. Point closed. Ok Noted
5 Indicate item code in side view. Manifold will come with of gauge only so individual item code is not applicable. Ok Noted
6 Check & correct dimension of plate in the side view plate projection seems different comparatively with front view It is 2D drawing so projection will be different. Plate is same. Ok Noted
7 In BOM table it's written unpainted? Gauge mounting plate will be unpainted but the structure will come with RAL7035 colour shade. Ok Noted
8 In side view, Form here to process connection required hook up items also included in Siemens scope and update the drawing accordinlgy It is typographical error ,we will remove the same however extraction ,first stage and exhaust connection will be in Siemens scope of supply but Main steam connection will be in custoner scope of supply.
Ok Noted
9 Why 1/2" for drain in side view Manifold drain connection is 1/4 inch only but we will use 1/4 to 1/2 inch connector. Ok Noted
10 Indicate cap Size in instrument hardware BOM Noted and the drawing will be revised. Ok Noted
11 2" PIPE, ASME SA106, GR B, SCH 160 why 2? Unit is meter so it will suffice the requirement of 2 meter. Ok Noted
12 GAUGE BOARD SUPPORT ASME SA 516,GR 60,THK 5mm . Please check quantity is it 1 or 2 nos.? It shall be 2 nos. only but we have mentioned as 1 set in BOM. it's mentioned with 1 No's not set please check & update
PRESSURE GAUGE FOR MAIN STEAM INLET CONTROL VA & PRESSURE GAUGE FOR TURBINE FIRST STAGE PRESSURE
13 We select guage range to have the operating range at centre of the guage so here the operating value is 39 so we have considered 100bar range.
100 barg required? where max pressure only 40 barg Ok Noted
Fold
1 2 3 4 5 6

2nd

Fold
1st
A A

GENERAL ARRANGEMENT &


First Submission 10-Jun-2022 -
Received from Client
Latest Submission 05-Sept-2022 1

SCHEMATIC DIAGRAM FOR Received from Client

NO Comments received from "CLIENT" within 15 Days from the date of

TURBINE ANALOG GAUGE BOARD


submission of this document, the Drawing/Document is Deemed Approved and
clearance given for manufacturing & Procurement. Any Changes/Modifications
required at later date will have Commercial & Delivery Implications.

INSTALLATION:- TCL Intermediates Private Limited Dahej II, Gujarat


B 1 B

CLIENT:- Thirumalai Chemicals ltd

DRAWING REFERENCE

END CUSTOMER:- Thirumalai Chemicals ltd


C C

PROJECT TITLE:- ORANGE 1

PROJECT NO:- 21100 1

SIEMENS
62OP-42888
D ORDER No:- D

1 05-Sept-2022 Revised as per customer comments AS AS JS


CONSULTANT:- N.A. - 10-Jun-2022 FIRST SUBMISSION AAU AS JS
Rev. Date Description Prepared Checked Approved
Prepared: AAU Derived from: Sep. PL same No. Another No. Scale: Doc. Type: Size:
FORMAT NO : IP-Q-F-2002/C

09-Jun-2022 rev.- 1:1 A3


Checked: AS Responsible department: Title: COVERPAGE
REV.DATE : 01.04.2022

09-Jun-2022 SSP COE FOR


TURBINE SUPERVISORY PANEL
CONTRACTOR:- SIEMENS ENERGY
Approved: JS Take over department: Language:

09-Jun-2022 SSP PM&SCM Project: TCL Intermediates Private Limited Dahej II , Gujarat 1 ENG
CAD file: Client: Thirumalai Chemicals ltd No. of sheet:
Transmittal, reproduction, dissemination and/or editing of this document
as well as utilization of its contents and communication thereof to others -- Consultant: N.A. 05
without express authorization are prohibited. Offenders will be held liable
for payment of damages. All rights created by patent grant or registration Document No. Rev. No. Sheet:
of a utility model or design patent are reserved.
Siemens Energy is a trademark licensed by Siemens AG. 62OP42888_U1_625030001 1 01

1 2 3 4 5 6
Fold

Fold
2nd

50 100
1st

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
for payment of damages. All rights created by patent grant or registration
without express authorization are prohibited. Offenders will be held liable
as well as utilization of its contents and communication thereof to others
Transmittal, reproduction, dissemination and/or editing of this document

A
SR. NO. REV. DESCRIPTION
of a utility model or desig patent are reserved.

1 1 COVER SHEET

2 1 INDEX LIST & NOTES

3 1 GA & FOUNDATION DETAILS

4&5 1 BOM

B B

NOTES:

1) This document indicates the typical Hook-up & its required Bill of Material.
2) Tube fittings shall be used as indicated in the drawing. All tube & tube fittings shall be SS316.
3) Necessary support shall be supplied along with TGB for Transportation.
4) Dimensions mentioned in GA may have minor modifications during manufacturing.
5) DESIGN BY : SIEMENS
C C

D D
FORMAT NO : IP-Q-F-2002/C
REV.DATE : 01.04.2022

Prepared: AAU Derived from : Responsible department : Title : INDEX LIST & NOTES Size:
08-Jun-2022 REV.- SSP COE A3
Checked: AS Sep. PL same No. Take over department : TURBINE ANALOG GAUGE BOARD Language:
08-Jun-2022 Another No. SSP PM&SCM Project: TCL Intermediates Private Limited Dahej II, Gujarat 1 ENG.
Approved: JS CAD file : Circuit ref : Client: Thirumalai Chemicals ltd No. of sheet:
08-Jun-2022 Consultant: N.A. 05
Document No. Rev.No. Sheet:
62OP42888_U1_625030001 1 02

1 2 3 4 5 6
Fold

Fold
2nd

50 100
1st

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
for payment of damages. All rights created by patent grant or registration
without express authorization are prohibited. Offenders will be held liable
as well as utilization of its contents and communication thereof to others
Transmittal, reproduction, dissemination and/or editing of this document

A
(610-PG-104) PRESSURE GAUGE
of a utility model or desig patent are reserved.

FOR TURBINE EXHAUST


TAG PLATE 50X160mm, 4 NOS.
1
(610-PG-102) PRESSURE GAUGE FOR
TURBINE FIRST STAGE PRESSURE
1/2" NPTF
(610-PG-102)
1/2"NPT M x 1/2'(610-PG-104)
SW
Connector
(610-PG-101) PRESSURE GAUGE FOR MAIN 1/2" NPT F
STEAM INLET CONTROL VALVE DRAIN

(610-PG-101) 1/2" (610-PG-103)

B (610-PG-103) PRESSURE GAUGE FOR


TURBINE EXTRACTION PRESSURE
B

C C

#
#

#
1 1

FRONT VIEW

D SIDE VIEW SIDE VIEW D


(CARBON STEEL PIPE MATERIAL)
# (CARBON STEEL PIPE MATERIAL)

1
FINAGLE TOP VIEW
#
FORMAT NO : IP-Q-F-2002/C
REV.DATE : 01.04.2022

Prepared: AAU Derived from : Responsible department : Title : Size:


08-Jun-2022 SSP COE A3
Checked: AS Sep. PL same No. Take over department : TURBINE ANALOG GAUGE BOARD Language:
08-Jun-2022 Another No. SSP PM&SCM Project: TCL Intermediates Private Limited Dahej II, Gujarat 1 ENG.
Approved: JS CAD file : Circuit ref : Client: Thirumalai Chemicals ltd No. of sheet:
08-Jun-2022 Consultant: N.A. 05
Document No. Rev.No. Sheet:
62OP42888_U1_625030001

1 2 3 4 5 6
Fold

Fold
2nd

50 100
1st

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
for payment of damages. All rights created by patent grant or registration
without express authorization are prohibited. Offenders will be held liable
as well as utilization of its contents and communication thereof to others
Transmittal, reproduction, dissemination and/or editing of this document

BILL OF MATERIAL: INSTRUMENT HARDWARE A


S.R No. ITEM No. DESCRIPTION MATERIAL Nos./Mtrs QUANTITY/UNIT
of a utility model or desig patent are reserved.

1 03 NEEDLE VALVE, 1/2" OD X 1/2" OD. SS316 Nos. 04

2 5A TUBE SYPHON, 1/2" OD SS316 Nos. 04

3 13 2 - VALVE 3-WAY MANIFOLD, 1/2" NPT (F) x 1/2" NPT (F) SS316 Nos. 04

4 14 TUBE UNION, 1/2" OD X 1/2" OD SS316 Nos. 12

5 24 MALE CONNECTOR, 1/2" OD X 1/2" NPT (M) SS316 Nos. 04

6 24A MALE CONNECTOR, 1/2" OD X 1/4" NPT (M) SS316 Nos. 04


B SEAMLESS TUBE 1.65" THK, 1/2" OD
B
7 25 SS316 Mtrs. As Required

8 07 1/2" TUBE CAP, SS316 Nos. 04


1 SS316

C C
BILL OF MATERIAL: INSTRUMENT HARDWARE (STRUCTURE SUPPORT)

S.R No. ITEM No. DESCRIPTION MATERIAL Nos./Mtrs QUANTITY/UNIT


1 1 2" PIPE, ASME SA106, GR B, SCH 160 CS Mtrs. 02

2 2 GAUGE BOARD PLATE, UNPAINTED, THK 3mm SS316 Nos. 01

3 3 BASE PLATE, ASME SA 516, GR 60, THK 20mm CS Nos. 01

1 4 4 GAUGE BOARD SUPPORT ASME SA 516,GR 60,THK 5mm CS Nos. 02

5 5 FOOT PLATE ASME SA 516, GR 60, THK 20mm CS Nos. 01

6 6 CONNECTION BOLTS SA 193, GR B7/SA 194, GR 2H GI Nos. 04


D M20 X 35mm LONG
D

7 7 PLATE 50mm X 5MM THK, ASME SA 516, GR 60 CS Mtrs. 02


FORMAT NO : IP-Q-F-2002/C
REV.DATE : 01.04.2022

Prepared: AAU Derived from : Responsible department : Title : BOM FOR Size:
08-Jun-2022 REV.- SSP COE A3
Checked: AS Sep. PL same No. Take over department : TURBINE ANALOG GAUGE BOARD Language:
08-Jun-2022 Another No. SSP PM&SCM Project: TCL Intermediates Private Limited Dahej II, Gujarat 1 ENG.
Approved: JS CAD file : Circuit ref : Client: Thirumalai Chemicals ltd No. of sheet:
08-Jun-2022 Consultant: N.A. 05
Document No. Rev.No. Sheet:
62OP42888_U1_625030001 1 04

1 2 3 5 6
Fold

4
Fold
2nd

50 100
1st

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
for payment of damages. All rights created by patent grant or registration
as well as utilization of its contents and communication thereof to others
without express authorization are prohibited. Offenders will be held liable
Transmittal, reproduction, dissemination and/or editing of this document

A
BILL OF MATERIAL: INSTRUMENTS
PREFERRED
of a utility model or desig patent are reserved.

S.R No. TAG No. DESCRIPTION RANGE TYPE QUANTITY VENDOR REMARKS
MODEL NO
FLUSH PANEL
1 610-PG-101 PRESSURE GAUGE FOR MAIN STEAM INLET CONTROL VALVE DRAIN 0 to 100 Bar(g) MOUNTING
01 GIC SFBSPG -
FLUSH PANEL
2 610-PG-102 PRESSURE GAUGE FOR TURBINE FIRST STAGE PRESSURE 0 to 60 Bar(g) 01 GIC SFBSPG -
MOUNTING
FLUSH PANEL
3 610-PG-103 PRESSURE GAUGE FOR TURBINE EXTRACTION PRESSURE 0 to 16 Bar(g) 01 GIC SFBSPG -
MOUNTING
FLUSH PANEL
4 610-PG-104 PRESSURE GAUGE FOR TURBINE EXHAUST -1 to 1.5 Bar(g) 01 GIC SFBSPG -
MOUNTING

B B

C C

D D
FORMAT NO : IP-Q-F-2002/C
REV.DATE : 01.04.2022

Prepared: AAU Derived from : Responsible department : Title : BOM FOR Size:
08-Jun-2022 SSP COE A3
Checked: AS Sep. PL same No. Take over department : TURBINE ANALOG GAUGE BOARD Language:
08-Jun-2022 Another No. SSP PM&SCM Project: TCL Intermediates Private Limited Dahej II, Gujarat 1 ENG.
Approved: JS CAD file : Circuit ref : Client: Thirumalai Chemicals ltd No. of sheet:
08-Jun-2022 Consultant: N.A. 05
Document No. Rev.No. Sheet:
62OP42888_U1_625030001 - 05