0% found this document useful (0 votes)
10 views4 pages

1.2c Illumination Survey

Uploaded by

madhanreddi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views4 pages

1.2c Illumination Survey

Uploaded by

madhanreddi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT NAME: SS-8236

ELEMENT 1.2c
ILLUMINATION SURVEY

MONTH: June 2021 TIME FROM: 10:00 AM TO: 11:30 AM

LUX METER MAKE EXTECH INSTRUMENTS (LIGHT


DATE OF SURVEY: 2-6-2021
& TYPE: METER LT300)

INSPECTOR NAME: MADHAN SERIAL No: 140710513

ACTUAL MEASUREMENTS AFTER


DEVIATIO CORRECTION (* = DATE
LOCATION LEGAL RESPONSIBILITY
N LIGHT MEASUREMENTS COMPLETED
DAY NIGHT
TAKEN AT FLOOR LEVEL)

SEC – Electrical office 341 500

SEC – Civil office 345 500

SEC Office Corridor 265 200

SEC Office toilet 212 200

ABC – mech office 336 500

ABC – Civil office 346 500

ABC- Mec & Civil Corridor 232 200

ABC Elec & Civil toilet 225 200

TEA ROOM 202 200

ABC – QC Office 346 500

ABC - Safety office 365 500

ABC - QC & Safety access 335 200

ABC - QC & Safety toilet 225 200

Meeting room 321 300

Prayer room – 1 315 300

Security Office 458 200

ABC Testing co-office 336 200

ABC Testing engr office 234 200

Testing office Corridor 266 200

Testing office toilet 212 200

isolation office 356 500

Page 1 of 4 Rev.2 [08-April-2019] Projects Business Unit


PROJECT NAME: SS-8236
ELEMENT 1.2c
ILLUMINATION SURVEY

Prayer room – 2 340 300

Supervisor room 342 500

Seco safety engr office 340 500

Worker toilet -1 216 200

Worker toilet -2 211 200

Worker toilet -3 212 200

Worker toilet -4 206 200

Lunch room -1 211 200

Lunch room -2 222 200

Lunch room -3 218 200

Electrical store – 1 235 200

Civil store – 2 266 200

Chemical storage – 1 245 200

Chemical storage – 2 290 200

Workshop electrical – 1 1150+ 200

Workshop mechanical 1200+ 200

Car parking 1800+ 100

GIS room 245 200

GIS Basement 215 200

GIS Stairs 240 200

SWGR Room – A 216 200

SWGR Room – B 272 200

SWGR Room – C 245 200

SWGR Basement – A 230 200

SWGR Basement – B 221 200

SWGR Basement – C 220 200

Page 2 of 4 Rev.2 [08-April-2019] Projects Business Unit


PROJECT NAME: SS-8236
ELEMENT 1.2c
ILLUMINATION SURVEY

SWGR Stairs 286 200

Telecommunication 256 200


room

Battery room 246 200

Control room 310 200

Cylinder room 221 200

Site toilet 232 200

Inspector Name: MADHAN Signature: _________________ Date:

Site Manager Name: SUNIL Signature: _________________ Date:

Page 3 of 4 Rev.2 [08-April-2019] Projects Business Unit


PROJECT NAME: SS-8236
ELEMENT 1.2c
ILLUMINATION SURVEY

Page 4 of 4 Rev.2 [08-April-2019] Projects Business Unit