0% found this document useful (0 votes)
70 views25 pages

Daily Report

reports

Uploaded by

Hammad Hussain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views25 pages

Daily Report

reports

Uploaded by

Hammad Hussain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 25

KOC – CONTRACT NO.

21056720
Project Title: South Kuwait Excavation, Transportation and
Remediation (SKETR) Project (Zone-3)
Daily Progress Report No: 21056720-SK3-CM-DAR-00728

Contract No. 21056720


Project Title:
South Kuwait Excavation, Transportation and
Remediation (SKETR) Project (Zone-3)

26
CONTRACTOR
JV/C of Enshaat Al-Sayer General Trading &
Contracting Co. WLL with Water & Soil
Remediation S.R.L
4

Daily Progress Report for the works

Executed on 4-Apr-2024

Dar No. : 21056720-SK3-CM-DAR-00728

Form No: 21056720-SK3-CM-FRM-00001 Rev A. 19 Oct.2021 Page 1 of 25


SouthKuwaitExcavation, TransportationandRemediation(SKETR)Project(Zone-3)

South Kuwait Excavation, Transportation and Remediation (SKETR) Project (Zone-3)

Days Elapsed : 923


Project Start Date : 25/Sep/21 Report Date : 4/Apr/24
Contract No.: 21056720 Project Finish Date : 24/Jan/26 Planned Manpower for this month : 287
Total No. of Days : 1583 Planned Equipment for this month : 107
Contractor : JV/C of Enshaat Al-Sayer General Trading & Contracting Co. WLL with Water & Soil Remediation S.R.L

Temperature (Deg C) Rain (Hrs) Sand Storm (Hrs) Humidity .(Hrs) Wind Speed .(Km/hrs) Working Hours
Weather
MIN. : 18 FROM : N/A FROM : N/A From : 76% 16km/h FROM : 06:00 AM
MAX. : 22 TO : N/A TO : N/A TO : 76% TO : 05:00 PM

WORK PERFORMANCE STATUS

Subarea 3A Boundary Delineation at subarea 5A Sheet 04.


Portion 1B
Subarea 5A UXO (BAC) clearance of 5A OCP Footprint Inspection.
Stockpile Area/Treatment
pad
Unloading of Contaminated soil from site to stockpile area.

Portion 3A Stockpile area Screener maintenance Works & Contaminated soil screening works.

Subarea 3A Screening of contaminated soil at Subarea-3A Sheet-2 (Temporary Stockpile area).


Subarea 3A Mixing Layer 1 & 2 of contaminated soil in Subarea 3A Sheet-09 WOL.
Subarea 5A Excavation of contaminated soil in Subarea 5A Sheet 15 WOL.
Portion 02 Subarea 3A Loading and Transportation of Contaminated soil from Subarea 3A sheet-10 to Sheet-02 temporary stockpile area.
Subarea 3A Loading and Transportation of Screened soil from Subarea 3A Sheet-10 to Bio-Remediation area.
Subarea 5A Loading and Transportation of Contaminated soil from Subarea 5A sheet-15 to stockpile area.
Subarea 5A Loading and Transportation of Contaminated soil from Subarea 5A sheet-15 to Landfill.

Near-Bio Remediation Pad Operation of weighbridge No.1,2 & 3.

Bio remediation works.

Loading and Transportation of Screened soil from Stockpile to Bio-Remediation Area (Cycle-2).

Removal of Treated soil from Bio-Remediation Area to temporary Stockpile.

Preparation for inoculum & nutrients.

Application Of water for Batch #C01-59 ,C02-14,15,56.


Portion 3A Remediation Treatment Pad
Application Of Inoculum and nutrients for Batch #C02-14,15,56.

Monthly Progress Sampling for Batch# C2-43,45,46.

Tilling, mixing and tunning for Batch #C01-58,59 , C02-51,55,58.

Levelling soil at additional stockpile area.

Preparation of Bio-remediation Inoculum in bio reactor unit.

Excavation & Compaction for Light pole foundation.

Sand placement and levelling work

Filter Geo Textile laying


Portion 5A Landfill
Installation of GDL,HDPE Pipe, Gravel and Geotextile.

Storm water channel excavation works.

Apply 150mm sand protection layer

Portion 5B Landfill Infilling works for Landfill

Key Activity description UOM Total Qty Previous Day Qty.


Reporting Day Progress Cumulative Qty Cumulative % Remarks
Qty
1 VSOR and UXO (BAC) clearance for Subarea-3A (OCP) m3 54,799 54,799 - 54,799 100%

2 VSOR and UXO (BAC) clearance for Subarea-3A (WOL) m2 607,718 581,658 - 581,658 96%

3 VSOR and UXO (BAC) clearance for Subarea-3A (DOL) m2 915,755 916,976 - 916,976 100%

4 VSOR and UXO (BAC) clearance for Subarea-3B (OCP) m3 96,047 16,923 - 16,923 18%

5 VSOR and UXO (BAC) clearance for Subarea-3B (WOL) m2 344,352 261,806 - 261,806 76%

6 VSOR and UXO (BAC) clearance for Subarea-3B (DOL) m2 1,094,832 245,687 - 245,687 22%

10 VSOR and UXO (BAC) clearance for Subarea-4B (WOL) m2 175,813 27,327 - 27,327 16%

11 VSOR and UXO (BAC) clearance for Subarea-4B (OCP) m3 8,908 8,908 - 8,908 100%

12 VSOR and UXO (BAC) clearance for Subarea-4B (DOL) m2 353,245 354,145 - 354,145 100%

19 VSOR and UXO (BAC) clearance for Subarea-4E (OCP) m3 22,405 22,090 - 22,090 99%

20 VSOR and UXO (BAC) clearance for Subarea-4E (WOL) m2 179,291 99,824 - 99,824 56%

21 VSOR and UXO (BAC) clearance for Subarea-4E (DOL) m2 319,193 296,398 - 296,398 93%

22 VSOR and UXO (BAC) clearance for Subarea-5A (OCP) m3 71,449 71,449 - 71,449 100%

23 VSOR and UXO (BAC) clearance for Subarea-5A (WOL) m2 1,055,079 1,055,706 - 1,055,706 100%

24 VSOR and UXO (BAC) clearance for Subarea-5A (DOL) m2 1,608,733 836,259 - 836,259 52%

31 Excavation and Stockpiling works -

32 Excavation & Stockpiling for Subarea-3A (OCP) Tons 38,796 14,298 - 14,298 37%

33 Excavation & Stockpiling for Subarea-3A (WOL) Tons 362,912 5,514 - 5,514 2%

34 Excavation & Stockpiling for Subarea-3A (DOL) Tons 255,609 246,922 - 246,922 97%

39 Excavation & Stockpiling for Subarea-4B (WOL) Tons 255,615 28,160.36 - 28,160 11%

40 Excavation & Stockpiling for Subarea-4B (OCP) Tons 7,967 7,588.35 - 7,588 95%

41 Excavation & Stockpiling for Subarea-4C (OCP) Tons 42,857 3,859.95 - 3,860 9%

42 Excavation & Stockpiling for Subarea-4D (DOL) Tons 390,126 383,074 - 383,074 98%

43 Excavation & Stockpiling for Subarea-4D (WOL) Tons 345,137 237,219 - 237,219 69%

44 Excavation & Stockpiling for Subarea-4D (OCP) Tons 120,596 116,979 - 116,979 97%

45 Excavation & Stockpiling for Subarea-4E (DOL) Tons 72,842 56,205 - 56,205 77%

46 Excavation & Stockpiling for Subarea-4E (WOL) Tons 159,478 66,456 - 66,456 42%

47 Excavation & Stockpiling for Subarea-4E (OCP) Tons 8,449 1,711 - 1,711 20%

48 Excavation & Stockpiling for Subarea-5B (DOL) Tons 320,571 25304.12 - 25,304 8%

49 Excavation & Stockpiling for Subarea-5B (WOL) Tons 147,587 - - - 0%

50 Excavation & Stockpiling for Subarea-5B (OCP) m3 15,402 10468.76 - 10,469 68%

51 Excavation & Stockpiling for Subarea-4A (DOL) Tons 386,834 21191.6 - 21,192 5%

52 Excavation & Stockpiling for Subarea-4A (WOL) Tons 136,880 1143.76 - 1,144 1%

53 Excavation & Stockpiling for Subarea-4A (OCP) Tons 19,313 5565.24 - 5,565 29%

54 Excavation & Stockpiling for Subarea-5B (DOL) Tons 18,850 17124.8 - 17,125 91%

55 Excavation & Stockpiling for Subarea-5A (DOL) Tons 29,078 12089 - 12,089 42%

56 Excavation & Stockpiling for Subarea-5A (WOL) Tons 1,720,319 280232.6 6,961 287,194 17%

57 Excavation & Stockpiling for Subarea-5A (OCP) Tons 36,172 5692.3 5,692 16%

61 Mixing of WOL - ( Layer 01 Layer 02 ) -

62 Mixing Of WOL (L1+L2) Tons 453,600 59989.82 - 59,990 13%

Form No: 21056720-SK3-CM-FRM-00001 Rev A. 19 Oct.2021 Page 2 of 25


Transportation of OCP / DOL & Mixing at
63 -
WOL
Transportation Of OCP for WOL Mixing
64 ( OCP+WOL)
Tons 302,400 55134.11 - 55,134 18%
Transportation Of DOL for WOL Mixing
65 ( DOL+WOL)
Tons 302,400 66471.79 - 66,472 22%

66 Non KERP Materials 0 - -


Relocation and stockpiling of Non-Contaminated KERP
67 Materials
Tons 25,000 15700 - 15,700 63%

68 Portion 5A Landfill Activities -

69 Soil Excavation of Landfill m3 133,000 133000 - 133,000 100%

70 Formation Of Level m3 21,300 21349 - 21,349 100%

71 Supplying of Imported Gatch m3 335,992 335992 - 335,992 100%

72 Supply of Gravel 30-50mm & 20-40mm m3 38,700 38700 - 38,700 100%

73 Supply of Sand m3 52,604 52804 - 52,804 100%

74 HDPE Textured Liner Installation -Slope m2 28,810 28810 - 28,810 100%

75 HDPE Smooth Liner Installation -Sub cell m2 115,010 115010 - 115,010 100%

76 GCL Liner Installation Including Slopes & Sub cell m2 143,820 143820 - 143,820 100%

77 GDL Installation m2 28,810 28,810.00 - 28,810 100%

78 Geo Textile Separator m2 115,010 115,010.00 - 115,010 100%

79 Filter Geo Textile m2 115,010 115,010.00 - 115,010 100%

80 20-40 mm Gravel installation -Sub cell m3 38,700 38,700.00 - 38,700 100%

81 HDPE Pipe Installation (160,200,400mm) RM 2,508 2,508.00 - 2,508 100.00%

82 HDPE Textured - Welding - Slopes RM 4,286 4286 - 4,286 100.00%

83 HDPE Smooth - Welding - Sub cell RM 18,525 18525 - 18,525 100%

84 Erosion Protection Layer of Bundwall m3 3,140 3,140 - 3,140 100%

85 Sand Protection Layer - 250mm m3 28,753 28,753 - 28,753 100%

86 Sand Protection Layer - 150mm m3 17,252 17,252 - 17,252 100%

87 Loading of Bioremediation Pile -

88 Loading of piles for P-3A - TPH % 1 - 5 Tons 3,029,400 1,198,026.83 8,822 1,206,849 40%

89 Loading of piles for P-3B - TPH % 5 - 7 Tons 363,527 - - - 0%

90 Offloading of Bioremediation Pile -

91 Offloading of piles for P-3A - TPH % 1 - 5 Tons 3,029,400 447,811 6,250 454,061 15%
Loading and Transportation From Subarea
92 -
to Stockpile / Treatment Area
Loading and Transportation From Subarea 3B (DOL)
93 UNSCREENED
Tons 194,334 185,857 - 185,857 96%
Loading and Transportation From Subarea 3B (WOL)
94 UNSCREENED
Tons 258,541 2,312 - 2,312 1%
Loading and Transportation From Subarea 3B (OCP)
95 UNSCREENED
Tons 9,796 3,767 - 3,767 38%
Loading and Transportation From Subarea 4C (OCP)
96 UNSCREENED
Tons 42,857 4,790 - 4,790 11%
Loading and Transportation From Subarea 4D (DOL)
97 UNSCREENED
Tons 290,007 289,582 - 289,582 100%
Loading and Transportation From Subarea 4D (OCP)
98 UNSCREENED
Tons 94,853 90,849 - 90,849 96%
Loading and Transportation From Subarea 4D (WOL)
99 UNSCREENED
Tons 390,844 389,473 - 389,473 100%
Loading and Transportation From Subarea 4E (DOL)
100 UNSCREENED
Tons 106,384 83,184 - 83,184 78%
Loading and Transportation From Subarea 4E (OCP)
101 UNSCREENED
Tons 14,838 5,028 - 5,028 34%
Loading and Transportation From Subarea 4E (WOL)
102 UNSCREENED
Tons 179,287 91,013 - 91,013 51%
Loading and Transportation From Subarea 5B (OCP)
103 UNSCREENED
Tons 15,657 15,657 - 15,657 100%
Loading and Transportation From Subarea 5B (DOL)
104 UNSCREENED
Tons 320,571 34,726 - 34,726 11%
Loading and Transportation From Subarea 5B (WOL)
105 UNSCREENED
Tons 147,587 5,431 - 5,431 4%
Loading and Transportation From Subarea 5A (DOL)
106 UNSCREENED
Tons 29,078 16,812 - 16,812 58%
Loading and Transportation From Subarea 5A (WOL)
107 UNSCREENED
Tons 1,720,319 374,094 7,679 381,773 22%
Loading and Transportation From Subarea 5A (OCP)
108 UNSCREENED
Tons 36,172 5,692 - 5,692 16%
Loading and Transportation From Subarea 5C (DOL)
109 UNSCREENED
Tons 342,080 16,920 - 16,920 5%
Loading and Transportation From Subarea 5C (WOL)
110 UNSCREENED
Tons 258,522 7,484 - 7,484 3%
Loading and Transportation From Subarea 5C (OCP)
111 UNSCREENED
Tons 40,943 29,119 - 29,119 71%
Loading and Transportation From Subarea 4A (DOL)
112 UNSCREENED
Tons 386,834 19,895 - 19,895 5%
Loading and Transportation From Subarea 4A (WOL)
113 UNSCREENED
Tons 136,880 2,046 - 2,046 1%
Loading and Transportation From Subarea 4A (OCP)
114 UNSCREENED
Tons 19,313 5,244 - 5,244 27%
Loading and Transportation From Subarea 4B (DOL)
115 UNSCREENED
Tons 228,223 130,651 - 130,651 57%
Loading and Transportation From Subarea 4B (WOL)
116 UNSCREENED
Tons 255,615 74,815 - 74,815 29%
Loading and Transportation From Subarea 4B (OCP)
117 UNSCREENED
Tons 7,967 7,558 - 7,558 95%
Loading and Transportation From Subarea 3A (DOL)
118 UNSCREENED
Tons 230,350 16,398 - 16,398 7%
Loading and Transportation From Subarea 3A (DOL)
119 SCREENED
Tons 230,350 184,875 1,064 185,939 81%
Loading and Transportation From Subarea 3A (WOL)
120 UNSCREENED
Tons 362,912 11,786 - 11,786 3%
Loading and Transportation From Subarea 3A (OCP)
121 UNSCREENED
Tons 38,796 19,150 - 19,150 49%

122 Construction Debris Tons 1,000 89 - 89 9%

123 Portion 5B Infilling works -

124 Transportation from Subarea 5A to landfill Tons 325,247 3,537 1,732 5,269 2%

125 Transportation of OCP to Landfill -

126 Transportation from Subarea 4D to landfill Tons 3,607 274 - 274 8%

127 Transportation of DOL to Landfill -

128 Transportation from Subarea 3B to landfill Tons 9,247 - - - 0%

129 Screen, Break/Pulverize -

130 Screening Tons 3,837,238 1,672,582 8,910 1,681,492 44%

Name of Sub Contractor Location Remarks

1)Masar All area Transportation Works


SUB CONTRACTORS

2)Aldali All area E&T works


Anomaly Avoidance support/ Construction support & UXO Clearance works
3) Horizon UXO Clearance
at Portion 1A & 1B
4) Middle East All area Soil Sampling Works
5)Amwaj-Al Masela All area E&T works
6)Axis Solution & Sasco All area Weigh Bridge Operation
7) Al-Jazirah Landfill Landfill Construction
SAFETY SITE INSTRUCTIONS TO CONTRACTORS CONTRACTOR'S ACTION
ASPECTS
SAFETY

NA NA NA

WORK PERMIT (PTW) STATUS

S/N Activity PTW TYPE WORK PERMIT (PTW) STATUS PTW VALIDITY PERIOD

Issue Dates: 01/04/2024


WSS:Mohammad samir ahmad, Mohammad
1
SCREENING AND STOKEPILEING HOT
Permit Number:1670516H
TO CARRY OUT OPERATION AND MAINTENANCE WORKS FOR SCREENING MACHINES TO Field: Brown PA:Sajith , Uthuppan
Closing Date: 08/04/2024
SUB AREA 3A-SHEET 02 SCREEN THE CONTAMINATED SOIL , LOADING UNLOADING USING LOADER,EXCAVATOR
DUMP TRUCKS, REFILLING, HAND,POWER TOOLS. IN SHEET NO 02 AT SUB AREA 3A PI:Al-Ajmi, Abbas

Form No: 21056720-SK3-CM-FRM-00001 Rev A. 19 Oct.2021 Page 3 of 25


Issue Dates: 02/04/2024 WSS:Gurdial, Singh
MECHANICAL EXCAVATION TO CARRY OUT MECHANICAL EXCAVATION,LOADING,UNLOADING OF CONTAMINATED Permit Number:1670980H
2 HOT SOIL (DOL)USING EXCAVATOR,DOZER,LOADER,DUMP TRUCKS,WATER PA:Sajith , Uthuppan
Field: Brown
SUB-AREA 3A SHEET 05 TANKER,LIFTING,BOOM TRUCK,REFUELING,MAINTENANCE,HAND Closing Date: 09/04/2024
TOOLS,SURVEY,PHOTOGRAPHS AT SUB-AREA 3A SHEET 05 PI:Al-Ajmi, Abbas
Issue Dates: 03/04/2024 WSS:Md imran alam, Abusaleh
MECHANICAL EXCAVATION TO CARRY OUT MECHANICAL EXCAVATION,LOADING,UNLOADING OF CONTAMINATED Permit Number:1671360H
3 HOT SOIL (DOL)USING EXCAVATOR,DOZER,LOADER,DUMP TRUCKS,WATER PA:Sajith , Uthuppan
Field: Brown
SUB-AREA 3A SHEET 09 TANKER,LIFTING,BOOM TRUCK,REFUELING,MAINTENANCE,HAND Closing Date: 10/04/2024
TOOLS,SURVEY,PHOTOGRAPHS AT SUB-AREA 3A SHEET 09 PI:Al-Ajmi, Abbas

Form No: 21056720-SK3-CM-FRM-00001 Rev A. 19 Oct.2021 Page 4 of 25


TO CARRY OUT MECHANICAL EXCAVATION, LOADING, UNLOADING OF CONTAMINATED Issue Dates: 02/04/2024 WSS:Shahbaz, Khan
MECHANICAL EXCAVATION SOIL (WET OIL LAKE-6361-A-5021-5302) BY USING EXCAVATOR, DOZER, LOADER, DUMP Permit Number:1671006H
4 HOT TRUCKS, WATER TANKER, LIFTING, BOOM TRUCK, REFUELING, MAINTENANCE, HAND PA:Sajith , Uthuppan
Field: Brown
SUB-AREA 5A SHEET 15 TOOLS, SURVEY, PHOTOGRAPHS. AT SUB-AREA 5A SHEET 15 AS PER MARKING ATTACHED Closing Date: 09/04/2024
DRAWING. PI:AL-Nadaf, Essa
Issue Dates: 02/04/2024 WSS:Ranadeep kumar, Daki
MECHANICAL EXCAVATION TO CARRY OUT MECHANICAL EXCAVATION, LOADING, UNLOADING OF CONTAMINATED Permit Number:1671041H
5 HOT SOIL (WET OIL LAKE-4632-E) BY USING EXCAVATOR, DOZER, LOADER, DUMP TRUCKS, PA:Sajith , Uthuppan
Field: Brown
SUB-AREA 5A SHEET 15 WATER TANKER, LIFTING, BOOM TRUCK, REFUELING, MAINTENANCE, HAND TOOLS, Closing Date: 09/04/2024
SURVEY, PHOTOGRAPHS. AT SUB-AREA 5A SHEET 15 AS PER MARKING ATTACHED DRAWING. PI:AL-Nadaf, Essa
Issue Dates: 02/04/2024 WSS:Edukondalu, Kukkala
LOADING AND TRANSPORTAION
Permit Number:1670987H
6 HOT TO CARRY OUT LOADING, TRANSPORTAION AND OFFLOADING OF CONTAMINATED SOIL PA:Sajith , Uthuppan
Field: Brown
SUB-AREA 5A SHEET 03-OCP FROM OCP TO NEARBY TEMPORARY STOCKPILE AREA BY USING LOADER, DUMP TRUCKS. Closing Date: 09/04/2024
AT SUB-AREA 5A SHEET 03 AS PER ATTACHED DRAWING. PI:AL-Nadaf, Essa
Issue Dates:30/03/2024 WSS:Mohamed hussein, Aly elrouby
Permit Number:1669475H
7 LEVELING HOT TO CARRY OUT LOADING, UNLOADING OF TREATED SOIL AND LEVELING BY USING Field: Brown PA:Sajith , Uthuppan
LOADER, EXCAVATOR, JCB, GRADER, ROLLER COMPACTOR, DUMP TRUCKS, WATER TANKER Closing Date: 06/04/2024
AT SUBKA AREA . PI:Al-Qallaf, Bader Fadel
Issue Dates: 01/04/2024 WSS:Haider, Ali
Permit Number:1670521H
8 SURVEY WORKS - SUB AREA -3A HOT TO CARRY OUT POST TOPOGRAPHY SURVEY AND SCANNING OF BOUNDARY DELINEATION Field: Brown PA:Al benditahan, Ignacio
FOR DOL,WOL AND OCP BY USING GPS, METAL DETECTOR AND HAND TOOLS AT (SUB AREA Closing Date: 08/04/2024
3A -SKETR ZONE - 03) PI:Al-Ajmi, Abbas
Issue Dates: 01/04/2024 WSS:Waqar, Ahmed
Permit Number:1670519H
9 SURVEY WORKS - SUB AREA -5A HOT TO CARRY OUT POST TOPOGRAPHY SURVEY AND SCANNING OF BOUNDARY DELINEATION Field: Brown PA:Al benditahan, Ignacio
FOR DOL,WOL AND OCP BY USING GPS, METAL DETECTOR AND HAND TOOLS AT (SUB AREA Closing Date: 08/04/2024
5A-SKETR ZONE - 03) PI:Al-Ajmi, Abbas
Issue Dates: 03/04/2024 WSS:Muthupandi, Karuthan
OPERATION OF WEIGHBRIDGE TO CARRY OUT OPERATION OF WEIGH BRIDGE NO.01 FOR WEIGHING OF DUMP Permit Number:1671362H
10 HOT TRUCKS,MAINTENANCE,WELDING CUTTING,GRINDING WORKS USING DIESEL PA:Sajith , Uthuppan
NO.01 GENERATOR, WELDING MACHINE, DUMP TRUCKS, FORKLIFT HAND AND POWER TOOLS AT
Field: Brown
Closing Date: 10/04/2024
SUB-AREA-4D LOCATION. PI:Al-Buloshi, Tareq
Issue Dates: 01/04/2024 WSS:Pramod kumar, Mandal

11
OPERATION OF WEIGHBRIDGE HOT
Permit Number:1670261
PA:Abdulrahman a y, Al-eidy
NO.02 TO CARRY OUT OPERATION OF WEIGH BRIDGE NO:2 FOR WEIGHING OF DUMP TRUCKS AT
Field: Green
Closing Date: 08/04/2024
STOCKPILE LOCATION BY USING GENERATOR, DUMP TRUCKS AND HAND TOOLS. PI:Sajith , Uthuppan
Issue Dates: 03/04/2024 WSS:Jawed, Khan

12
OPERATION OF WEIGHBRIDGE HOT
Permit Number:1671114
PA:Abdulrahman a y, Al-eidy
NO.03 LOADING AND UNLOADING OF SCREENED CONTAMINATED SOIL AND SOLID AMENDMENT
TO CARRY OUT OPERATION OF WEIGH BRIDGE NO:03 FOR WEIGHING OF DUMP TRUCKS AT
Field: Green
Closing Date: 10/04/2024
TILLING AND MIXING OF SOIL, INOCULUM NUTRIENTS WATER ADDITION, BIO REMEDIATION
STOCKPILE LOCATION BY USING DIESEL GENERATOR, DUMP TRUCKS AND HAND TOOLS. PI:Sajith , Uthuppan
SOIL SAMPLING,FIELD PARAMETERS TEST,INOCULUM&NUTRIENT PREPARETION INSIDE OF
CONTAINER AND OUT SIDE,PLUMBING WORKS, SURVEY, FUEL FILLING, EQUIPMENT Issue Dates: 01/04/2024 WSS:Prasanth kuriyakkot, Muku
MAINTENANCE USING DIESEL TANKER, EXCAVATOR, WHEEL LOADER,HALFLORRY,FORKLIFT, Permit Number:1670259H
13 HOT BACKHOE, TILLING MACHINE (HEAVY EQUIPMENT ) DUMP TRUCK, HAND AND POWER TOOLS, PA:Abdulrahman a y, Al-eidy
BIOREMEDIATION ACTIVITIES-01 WORKING AT HEIGHT TO FILLING WATER USING WATER TANKER FROM FILLING STATION OF
Field: Green
Closing Date: 08/04/2024
TO CARRY OUT LOADING AND UNLOADING OF SCREENED CONTAMINATED SOIL AND
LAGOON AT THE BIO PILES OF THE BIOREMEDIATION-(SKETR ZONE - 03) PI:Sajith , Uthuppan
SOLID AMENDMENT TILLING AND MIXING OF SOIL, INOCULUM NUTRIENTS WATER
ADDITION, BIO REMEDIATION SOIL SAMPLING, FIELD PARAMETERS TEST, INOCULUM AND Issue Dates: 02/04/2024 WSS:Subeesh, K. jose
NUTRIENT, SURVEY, FUEL FILLING, EQUIPMENT MAINTENANCE BY USING DIESEL TANKER, Permit Number:1670677H
14 HOT EXCAVATOR, WHEEL LOADER, HALFLORRY, BACKHOE, WATER TANKERS, TILLING MACHINE PA:Abdulrahman a y, Al-eidy
BIOREMEDIATION ACTIVITIES-02 (HEAVY EQUIPMENT ) DUMP TRUCK HAND AND POWER TOOLS AT
Field: Green
Closing Date: 09/04/2024
BIOREMEDIATION AREA 2(NEAR STOCKPILE ). PI:Sajith , Uthuppan
TO CARRY OUT OPERATION, EQUIPMENT MAINTENANCE ,REFUELING FOR SCREENING Issue Dates:30/03/2024 WSS:Ali, Abdul hameed
SCREENER OPERATION MACHINES TO SCREEN THE CONTAMINATED SOIL. LOADING UNLOADING OF SOIL, Permit Number:1669476H
15 HOT LIFTING, WORKING AT HEIGHT, SCAFFOLDING, WELDING, CUTTING, GRINDING BY USING PA:Abdulrahman a y, Al-eidy
Field: Green
DAY SHIFT GENERATOR, WELDING MACHINE, LOADER, DOZER, JCB, EXCAVATOR DUMP Closing Date: 06/04/2024
TRUCKS,WATER TANKER, BOBCAT, HALF LORRY, BOOM TRUCK, HAND,POWER TOOLS. PI:Sajith , Uthuppan
TO CARRY OUT OPERATION AND MAINTENANCE WORKS FOR SCREENING MACHINES TO Issue Dates: 28/03/2024 WSS:Abdul, Malik
SCREENER OPERATION SCREEN THE CONTAMINATED SOIL, LOADING AND UNLOADING OF SOIL,WORKING AT HEIGHT,
UNLOADING OF CONTAMINATED SOIL FOR CONSTRUCTION OF TEMPORARY Permit Number:1669277H
16 HOT SCAFFOLDING, REFUELLING, WELDING, CUTTING, GRINDING BY USING GENERATOR, WELDING PA:Salem f s, Alhajri
RAMP,LAYING,WELDING,STITCHING TESTING OF LINER MATERIALS Field: Green
NIGHT SHIFT MACHINE, LOADER,DOZER, JCB,EXCAVATOR DUMP TRUCKS, WATER TANKER, BOBCAT, HALF Closing Date: 04/04/2024
(GCL,GDL,HDPE,GEOTEXTILE).INSTALLATION ,FUSION WELDING OF LEACHATE PIPES,LEAK
LORRY, BOOM TRUCK, TOWER LIGHT, POWER AND HAND TOOLS. PI:Mohammad nizar, Budair
LOCATION SURVEY,LOADING,UNLOADING AND SPREADING OF SAND,GRAVEL,GATCH,
BACKFILLING AND COMPACTION. SHUTTERING,REBAR,CONCRETING WORKS.SURVEY,LIFTING Issue Dates:30/03/2024 WSS:Muhammad imran, Shaffi
WORKS WITH CRANE,TRAILER.USING DUMPU Permit Number:1669477H
17 LANDFILL-DAY SHIFT HOT TRUCKS,LOADER,EXCAVATOR,GRADER,ROLLER,WATER TANKER,REFUELLING,CONCRETE Field: Green PA:Abdulrahman a y, Al-eidy
TRANSIT MIXER, DEWATERING WITH PUMP VIBRATOR,VACUUM TANKER HAND AND POWER Closing Date: 06/04/2024
TOOLS, AT LANDFILL AREA. PI:Sajith , Uthuppan
TO CARRY OUT LOADING, UNLOADING, LIFTING OF PRECAST FOUNDATION, MANUAL,
MECHANICAL EXCAVATION FOR DITCH, EVAPORATION POND, BACKFILLING, GRADING OF Issue Dates: 04/04/2024 WSS:Jean adib, El chikhani
LIGHT POLES-LANDFILL ROADS, SURVE, PHOTOGRAPHY, WELDING,CUTTING, GRINDING FOR LIGHT POLES & DIESEL Permit Number:1671501H
18 HOT FOUNDATION USING CRANE,TRAILER TRUCK,GRADER, LOADER, DUMP TRUCKS PA:Abdulrahman a y, Al-eidy
Field: Green
ROLLER, JCB, BOOM TRUCK, FORKLIFT, HALF LORRY, WELDING MACHINE, HAND & POWER Closing Date: 11/04/2024
TOOLS AT LANDFILL AREA. PI:Sajith , Uthuppan
Issue Dates: 31/03/2024 WSS:Abner, Soriano
Permit Number:1669877H
19 ELECTRICAL WORKS -LANDFILL HOT TO CARRY OUT LIFTING AND INSTALLATION OF SOLAR LIGHT POLES USING CRANE, HALF Field: Green PA:Abner, Soriano
LORRY AND ASSEMBLY OF SOLAR COMPONENTS, CABLE TERMINATIONS FOR ELECTRICAL Closing Date: 07/04/2024
WORKS USING HAND AND POWER TOOLS AT LANDFILL AREA. PI:Sajith , Uthuppan
Issue Dates: 04/04/2024 WSS:Mohammed, Rahimuddin
TO CARRY OUT PREPARATION WORKS.MANUAL AND MECHANICAL EXCAVATION, Permit Number:1671503H
20 PREPARATION WORKS HOT CONCRETING, REBAR AND SHUTTERING FORM WORKS, LOADING UNLOADING OF Field: Green PA:Abdulrahman a y, Al-eidy
MATERIALS BY USING BOOM TRUCK. JCB, GRADER, CONCRETE MIXER HAND AND POWER Closing Date: 11/04/2024
TOOLS AT PORTION 4 TREATMENT TECHNOLOGY PLANT AREA. PI:Sajith , Uthuppan
Issue Dates: 03/04/2024 WSS:Paulino, Gove
TO CARRYOUT UXO RFI INSPECTION OF SUB AREA 5A(OVER ALL SHEET) FIDS-NEW Permit Number:1671152H
21 UXO HOT WOL&DOL&OCP TO USING MANUAL DIGGING TOOLS & METAL Field: Brown PA:Dongiri, Nagaraja
DETECTORS,LLMD,F3,QUEST, SCHONSTEDT&EARTH MOVING EQUIPMENTS Closing Date: 10/04/2024
(EXCAVATOR,BACKHOE,FEL,DOZER PI:Al-AL-Nadaf, Essa
Issue Dates: 03/04/2024 WSS:Previous, Ngwenya
TO CARRYOUT UXOCLEARANCE & CRUSHING OF OCP OVERSIZED MATERIALS Permit Number:1671149H
22 UXO HOT SUBAREA4D(SHEET-07) Field: Brown PA:Dongiri, Nagaraja
,TO USING MANUAL DIGGING TOOLS &METAL DETECTORS,LLMD,F3,QUEST,SCHONSTEDT Closing Date: 10/04/2024
&HYADRAULIC BREAKER, EARTH MOVING EQUIPMENT(EXCAVATOR,BACKHOE,FEL,DOZER PI:Al-Buloshi, Tareq

Portion Location Activiry

Subarea 3A Boundary Delineation at subarea 3A.


Portion 1B
Subarea 5A UXO (BAC) clearance at subarea 5A WOL.
Stockpile Area/Treatment
pad
Unloading of Contaminated soil from site to stockpile area

Portion 3A Stockpile area Screener maintenance works and Contaminated Soil screening works.

Subarea 3A Screening of contaminated soil at Subarea-3A Sheet-2 (Temporary Stockpile area).

Subarea 3A Excavation of contaminated soil in Subarea 3A Sheet-05 DOL.

Portion 02 Subarea 5A Excavation of contaminated soil in Subarea 5A Sheet 15 WOL.

Subarea 3A Loading and Transportation of Contaminated soil from Subarea 3A sheet-03 to Sheet-02 temporary stockpile area.

Subarea 3A Loading and Transportation of Screened soil from Subarea 3A Sheet-10 to Bio-Remediation area.
Work Planned for Tomorrow

Subarea 5A Loading and Transportation of Contaminated soil from Subarea 5A sheet-15 to stockpile area.

Near-Bio Remediation Pad Operation of weighbridge No.1,2 & 3.

Bio remediation works.

Loading and Transportation of Screened soil from Stockpile to Bio-Remediation Area.

Preparation for inoculum & nutrients.


Portion 3A Remediation Treatment Pad
Application Of water for batch
Application Of Inoculum and nutrients for batch
Tilling, mixing and tunning for bio-batch

Preparation of Bio-remediation Inoculum in bio reactor unit.

Cable Trench backfilling works.

Apply 150mm sand protection layer

Portion 5A Landfill Sand placement and leveling work

Filter Geo Textile laying

Textured HDPE Welding Works & Apply Sand protection layer

Work Suspension :

Delays or potential delays and proposed steps to mitigate delays, If any :

Area of Concern :

Remarks /

PREPARED BY CONTARCTOR : JV/C of Enshaat Al-Sayer General Trading & Contracting Co. WLL with Water & Soil Remediation S.R.L REVIEWED BY COMPANY :

DESIGNATION : Project Manager NAME :


DATE : DESIGNATION :
DATE :
SIGNATURE : - SIGNATURE : -

Form No: 21056720-SK3-CM-FRM-00001 Rev A. 19 Oct.2021 Page 5 of 25


KUWAIT OIL COMPANY
DAILY MANPOWER REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO. 0
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : CENTRAL PROCESSING FACILITY (CPF)
CONTRACT NO. : 15050901
MANPOWER SUMMARY - CENTRAL PROCESSING FACILITY (CPF)
(FIRST COMBINED (FIRST
(FIRST (FIRST COMBINED
(AL-GHANIM) KUWAITI) (AL-GHANIM) KUWAITI)
(HEISCO) KUWAITI) GROUP (SINOPEC) (HEISCO) KUWAITI) GROUP (SINOPEC)
MANUAL TANKAGE
(AG3) (FK2)
(FK1)
TOTAL NON-MANUAL TANKAGE
(AG3) (FK2)
(FK1) (CG 1) CPF CPF- MEI
TOTAL
BUILDINGS PIL (CG 1) CPF CPF- MEI BUILDINGS PIL
CPF "CIVIL" CIVIL CPF "CIVIL" CIVIL
FACILITIES FACILITIES

#REF! 23 7 16 - 46 #REF! 1 - 1 - - 2
#REF! 51 31 43 - 125 #REF! 1 1 - 1 1 4
#REF! 35 30 89 - 154 #REF! 1 - - - - 1
#REF! 19 11 19 - 49 #REF! - - - - 1 1
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! 5 - 1 - 6 #REF! - - - - - -
#REF! 1 - - - 1 #REF! - - - - - -
#REF! 7 - - - 7 #REF! - - - - 1 1
#REF! 58 36 100 5 199 #REF! - - - - - -
#REF! - - - - - #REF! 1 - - - 1 2
#REF! - - - - - #REF! 3 1 2 - - 6
#REF! - - - - - #REF! 6 - - - - 6
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! 1 - - - - 1
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! 1 - - - 1 2
#REF! - - - - - #REF! - - - - - -
#REF! 2 2 - - 4 #REF! - - - - - -
#REF! - - - - - #REF! 1 - - 1 - 2
#REF! - - - - - #REF! 7 - - - - 7
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - 1 1
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! 6 2 10 3 - 21
#REF! - - - - - #REF! 2 - 5 7 1 15
#REF! - - - - - #REF! 1 - - - - 1
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - 8 - - 8 #REF! - - - - - -
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! - - - 1 - 1
#REF! - - - - - #REF! - - - 1 - 1
#REF! 3 - - - 3 #REF! 3 1 2 6 1 13
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! 4 - 1 2 - 7
#REF! - - - - - #REF! 1 - - - - 1
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! 4 1 - - - 5
#REF! - - - - - #REF! 5 - - - 1 6
#REF! - - - - - #REF! 2 - - - 1 3
#REF! - - - - - #REF! 7 - - - 3 10
#REF! - - - - - #REF! 1 - - - - 1
#REF! - - - - - #REF! - - - - - -
#REF! - - - - - #REF! 15 1 - 3 19
#REF! - - - - - #REF! -
#REF! - - - - - #REF! -
#REF! - - - - - #REF! -
#REF! - - - - - #REF! -
#REF! - - - - - -
#REF! - 1 - - 1 -
#REF! - - - - - -
#REF! - - - - - -
#REF! - - - - - -
#REF! - - - - - -
#REF! - - - - - -
#REF! - - - - - -
#REF! - - - - - -
#REF! - - - - - -
#REF! 19 1 27 - 47 -
#REF! 41 4 8 - 53 -
#REF! - - - - - -
#REF! 4 - - - 4 -
#REF! 1 - - - 1 -
#REF! - - - - - -
#REF! 2 - - - 2 -
#REF! - - - - - -
#REF! - - - - - -
#REF! - - - - - -
#REF! - - - - - -
#REF! - - - - - -

TOTAL MANUAL - 271 - 131 303 5 710 TOTAL NON-MANUAL - 74 6 22 22 16 140

Page 6 of 25
KUWAIT OIL COMPANY
DAILY MANPOWER REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO. 0
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : WELL BLOCK / INFIELD SATELLITE STATION NO. 2 (WB/ISS #2)
CONTRACT NO. : 15050901
MANPOWER SUMMARY - WELL BLOCK / INFIELD SATELLITE STATION NO. 2 (WB/ISS #2)

(TRANS. (AL- (TRANS. AL- (AL-


AL-GHANIM
ATLANTIC) GHANIM) ATLANTIC) GHANIM GHANIM)
MANUAL (AG1) TOTAL NON-MANUAL - - - TOTAL
PIONEER (AG3) PIONEER (AG1) (AG3)
CMEI
OFFICES BUILDINGS OFFICES CMEI BUILDINGS

#REF! 20 1 21 #REF! 1 - 1
#REF! 91 - 91 #REF! - - -
#REF! 78 - 78 #REF! - - -
#REF! 51 - 51 #REF! 1 - 1
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! 24 - 24 #REF! - - -
#REF! - - - #REF! - - -
#REF! 17 - 17 #REF! - - -
#REF! 132 8 140 #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! 13 1 14
#REF! - - - #REF! 1 - 1
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! 2 - 2
#REF! - - - #REF! 1 - 1
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! 12 2 14
#REF! 3 - 3 #REF! 4 2 6
#REF! - - - #REF! 1 - 1
#REF! - - - #REF! - - -
#REF! 2 - 2 #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! 3 - 3 #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! 7 1 8
#REF! - - - #REF! - - -
#REF! - - - #REF! 1 - 1
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! 1 - 1
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! 2 - 2
#REF! - - - #REF! - - -
#REF! - - - #REF! - - -
#REF! - - - #REF! 3 - 3
#REF! - - - #REF! -
#REF! - - - #REF! -
#REF! - - - #REF! -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! 22 3 25 -
#REF! 51 3 54 -
#REF! - - - -
#REF! 2 - 2 -
#REF! 8 - 8 -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - -
TOTAL MANUAL - 504 15 - - - 519 TOTAL NON-MANUAL - 50 6 - - - 56

Page 7 of 25
KUWAIT OIL COMPANY
DAILY MANPOWER REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO. 0
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : WELL BLOCK / INFIELD SATELLITE STATION NO. 3 (WB/ISS #3)
CONTRACT NO. : 15050901
MANPOWER SUMMARY - WELL BLOCK / INFIELD SATELLITE STATION NO. 3 (WB/ISS #3)

(AL-
(FIRST (FIRST
NBTC (NB2) (AL-GHANIM) NBTC GHANIM)
MANUAL KUWAITI) (AG3) TOTAL NON-MANUAL KUWAITI) - - - TOTAL
MEI BUILDINGS (NB2) MEI (AG3)
(FK1) CIVIL (FK1) CIVIL
BUILDINGS

#REF! 12 1 13 #REF! - 1 - 1
#REF! 30 2 32 #REF! - 1 - 1
#REF! 46 - 46 #REF! - - - -
#REF! 22 - 22 #REF! - - - -
#REF! 5 - 5 #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! 10 2 12 #REF! - - - -
#REF! - - - #REF! - - - -
#REF! 6 - 6 #REF! - - - -
#REF! 52 7 59 #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! 1 - 2 3
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! 8 - 8 #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! 6 - 2 8
#REF! - - - #REF! 4 - 2 6
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! 4 1 5 #REF! 2 - 1 3
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - 1 - 1
#REF! 7 - 7 #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! 1 - 1 #REF! - - - -
#REF! - - - #REF! 1 - - 1
#REF! - - - #REF! -
#REF! - - - #REF! -
#REF! - - - #REF! -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! 0 - - -
#REF! - - - -
#REF! - - - -
#REF! 14 3 17 -
#REF! 14 1 15 -
#REF! 3 - 3 -
#REF! - - - -
#REF! - 1 1 -
#REF! - - - -
#REF! 2 - 2 -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
TOTAL MANUAL 236 - 18 - - - 254 TOTAL NON-MANUAL 14 3 7 - - - 24
Page 8 of 25
KUWAIT OIL COMPANY
DAILY MANPOWER REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO. 0
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : EXPORT OIL FACILITY (EOF) INCLUDING COCC - PIL SCOPE
CONTRACT NO. : 15050901
MANPOWER SUMMARY - EXPORT OIL FACILITY (EOF) INCLUDING COCC - PIL SCOPE

(NBTC) FIRST (NBTC) FIRST (AL-


(AL-GHANIM)
HEISCO KUWAITI (FK2) HEISCO KUWAITI (FK2) GHANIM)
MANUAL (NB1) (TANKS) PIL
(AG3) TOTAL NON-MANUAL (NB1) (TANKS) PIL (AG3)
- - TOTAL
CMEI FACILTITIES BUILDINGS CMEI FACILTITIES BUILDINGS

#REF! 9 - 9 #REF! 1 - - 1
#REF! 28 2 30 #REF! 1 - - 1
#REF! 17 - 17 #REF! 1 - - 1
#REF! 6 - 6 #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! 8 - 8 #REF! - - - -
#REF! 4 - 4 #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! 50 16 66 #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! 2 1 1 4
#REF! - - - #REF! 1 - - 1
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! 1 - 1 #REF! - - - -
#REF! - - - #REF! 2 - - 2
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! 1 - - 1
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - 3 3 #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - 2 2
#REF! - - - #REF! 5 - 3 8
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! 1 - - 1
#REF! - 1 1 #REF! 1 1 2 4
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! 1 - - 1
#REF! - - - #REF! - - - -
#REF! - - - #REF! 1 - - 1
#REF! - - - #REF! - - - -
#REF! - - - #REF! - - - -
#REF! - - - #REF! 1 - - 1
#REF! - - - #REF! 1 - - 1
#REF! - - - #REF! - - - -
#REF! - - - #REF! 6 - 6
#REF! - - - #REF! -
#REF! - - - #REF! -
#REF! - - - #REF! -
#REF! - - - #REF! -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! 17 2 19 -
#REF! 26 6 32 -
#REF! - - - -
#REF! 1 - 1 -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
#REF! - - - -
TOTAL MANUAL 167 - - 30 - - 197 TOTAL NON-MANUAL 26 - 2 8 - - 36

Page 9 of 25
KUWAIT OIL COMPANY
DAILY MANPOWER REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO. 0
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : EXPORT OIL FACILITY (EOF) - CCC SCOPE
CONTRACT NO. : 15050901
MANPOWER SUMMARY - EXPORT OIL FACILITY (EOF) - CCC SCOPE

MANUAL TOTAL NON-MANUAL - - - - - - TOTAL

#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - #REF! -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -
#REF! - -

TOTAL MANUAL - - - - - - - TOTAL NON-MANUAL - - - - - - -

Page 10 of 25
KUWAIT OIL COMPANY
DAILY MANPOWER REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO. 0
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : LAYDOWN AREA
CONTRACT NO. : 15050901
MANPOWER SUMMARY - LAYDOWN AREA
FIRST FIRST
FIRST FIRST FIRST FIRST
KUWAIT AL- NBTC KUWAIT AL- NBTC
KUWAIT KUWAIT AL-GHANIM COMBINED (NBTC) TOTAL KUWAIT KUWAIT AL-GHANIM COMBINED (NBTC) TOTAL
(FK2) GHANIM HEISCO (NB2) MEI (SINOPEC) (FK2) GHANIM HEISCO (NB2) MEI (SINOPEC)
MANUAL (FK1)
PIL
(FK2) PIL
(AG1)
(AG3)
LAYDOWN
GROUP (NB1)
WB 3 & CPF- MEI
EXCLUDED NON-MANUAL (FK1)
PIL
(FK2) PIL
(AG1)
(AG3)
LAYDOWN
GROUP (NB1)
WB 3 & CPF- MEI
EXCLUDED
FK LAYDOWN LAYDOWN LAYDOWN CMEI EOF CCC FK LAYDOWN LAYDOWN LAYDOWN CMEI EOF CCC
LAYDOWN CMEI ISS3 LAYDOWN CMEI ISS3
LAYDOWN EOF LAYDOWN EOF
CPF CPF

#REF! 6 1 1 3 - - 1 1 - 13 #REF! 1 - - 3 1 1 - - - 6
#REF! 30 4 4 - 15 - - 1 - 54 #REF! 1 1 - 2 3 - - - 7
#REF! 35 - - - 25 - - - - 60 #REF! - - - - - 1 - - - 1
#REF! 5 2 - - 6 - 1 3 - 17 #REF! 1 - - - - - - - 1
#REF! - - - - - - 1 - - 1 #REF! - - - - - - - 1 1
#REF! - - - - - - - - - #REF! - - - - - - - - -
#REF! - - - - - - - - - #REF! - - - - - - - - -
#REF! 2 - - 9 15 - 1 - - 27 #REF! - - - - - - - - -
#REF! - - - - - - 7 - - 7 #REF! - - - - - - - - -
#REF! - - - - - - - - - #REF! - - - - - - - - -
#REF! 25 11 6 1 20 - 6 2 4 - 75 #REF! - - - - - - - - -
#REF! 2 - - - - 6 1 - - 9 #REF! 1 - - - 1 1 - - - 3
#REF! 2 - - - - - 1 - - 3 #REF! 2 1 1 - - 1 - - - 5
#REF! - - - - - - - - - #REF! - - - 4 - - 1 - 5
#REF! - - - - - - - - - #REF! - - - - - - - - -
#REF! - - - - - 18 - - 18 #REF! - - - 5 - - 1 - 6
#REF! - - - - - 31 - - 31 #REF! - - - - - - - - -
#REF! - - - - - 10 - - 10 #REF! - - - - 2 - - - 2
#REF! - - - - - 7 - - 7 #REF! - - - 3 - - - - 3
#REF! - - - - - 5 - - 5 #REF! - - - 1 - - - - 1
#REF! 2 - - - - 26 - - 28 #REF! - - - - - - - - -
#REF! 15 - - - - 29 - - 44 #REF! 4 - - - - 2 - - - 6
#REF! - - - 1 - - - - 1 #REF! - - - - - - - - -
#REF! - - - - - - - - - #REF! 2 - - - - - - - 2
#REF! - - - - - - - - - #REF! - - - 2 - - - - 2
#REF! - - - - - - - - - #REF! - - - - - - - - -
#REF! - - - - - - 2 - - 2 #REF! - - - - - - - - -
#REF! - 2 - 8 - - - - 10 #REF! - - - - - - - - -
#REF! - - - - 6 - 1 - - 7 #REF! - - - - - - - - -
#REF! - - - 14 - - - - 14 #REF! - - - 3 4 - - - 7
#REF! - - - - - - - - - #REF! - - - 2 - - - - 2
#REF! 4 - - - - - - - 4 #REF! - - - - 1 - - - 1
#REF! - - - 1 - - - - 1 #REF! - - - - - 1 - - - 1
#REF! - - - 9 - - - - 9 #REF! 11 2 - - 1 - - - 14
#REF! - - - - - - - - - #REF! 10 - - 1 - - 1 - 12
#REF! - - - - - - - - - #REF! - - - 4 - - 1 - 5
#REF! - 7 - 2 - - 1 3 - 13 #REF! 3 - - - 4 - - - 7
#REF! 4 - - 50 - - 2 2 - 58 #REF! - - - 2 - - - - 2
#REF! - - - - - - - - - #REF! - - - 1 - - - - 1
#REF! - - - - - - - - - #REF! - - - - 3 - - - 3
#REF! - - - - - - - - - #REF! - - - 5 - - 1 - 6
#REF! 4 - - - - - - 1 - 5 #REF! - - - 2 - - - - 2
#REF! - - - 5 - - - 9 - 14 #REF! - - - 1 1 - - - 2
#REF! - - - - - - 1 - 4 - 5 #REF! 1 - - - - 1 - 1 - 3
#REF! 4 6 - 32 - 3 3 1 9 1 59 #REF! 4 1 1 9 6 1 1 - 23
#REF! - - - - - - - - - #REF! - - - - - - - - -
#REF! - - - 21 - - - 1 - 22 #REF! 4 - - 5 4 4 1 - - 18
#REF! - - - - - - - - - #REF! 1 - - - 2 2 - - - 5
#REF! - - - - - - - - - #REF! - - - - - - - - -
#REF! - - - 1 - - - - 1 #REF! 2 1 - 3 1 1 - 1 1 10
#REF! 2 - - 75 - - - 1 - 78 #REF! 2 - - 3 - - - - 5
#REF! - - - - - - - - - #REF! - - - 1 - - - - 1
#REF! - 1 - - - - - - 1 #REF! - - - 8 3 7 - 3 - 21
#REF! - - - - - - - - - #REF! - - - - - - - - -
#REF! 4 - - - - - - - 4 #REF! 2 - - - - 1 - 1 - 4
#REF! - - - - - - - - - #REF! 4 - - 8 5 3 - 1 - 21
#REF! - - - - - - - - - #REF! -
#REF! - - - - - - - - - #REF! -
#REF! - - - - - - - - - -
#REF! - - - - - - - - - -
#REF! - - - - - 1 - - 1 -
#REF! 1 - - - - 2 - - 3 -
#REF! - - - - - - - - - -
#REF! - - - - - - - - - -
#REF! - - - - - - - - - -
#REF! - - - - - - - - - -
#REF! - - - - - - - - - -
#REF! - - - - - - - - - -
#REF! - - - - - - - - - -
#REF! - - - - - - - - - -
#REF! 11 2 3 10 - 4 - 2 - 32 -
#REF! 10 5 4 26 - 10 1 5 1 62 -
#REF! 1 - - - - 5 1 - 7 -
#REF! - - - - - - 1 1 - 2 -
#REF! - - - 2 - - 2 - - 4 -
#REF! 2 - - - - - - - 2 -
#REF! 2 4 - - - - - 1 - 7 -
#REF! 8 - - - - - 2 - - 10 -
#REF! 4 - - - - - - - 4 -
#REF! - - - - - - - - - -
#REF! - - - - - - - - - -
#REF! - - - - - - - - - -

TOTAL MANUAL 185 45 18 270 87 157 29 11 47 2 851 TOTAL NON-MANUAL 56 6 2 78 - 42 26 2 13 2 227

Page 11 of 25
KUWAIT OIL COMPANY
DAILY EQUIPMENT REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO.: 0
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : CENTRAL PROCESSING FACILITY (CPF)
CONTRACT NO. : 15050901
CONSTRUCTION EQUIPMENT REPORT - CENTRAL PROCESSING FACILITY (CPF)
COMBINED
(HESICO) AL-GHANIM (AG3) FIRST KUWAITI (FK2) FIRST KUWAITI (FK1) (SINOPEC)
DESCRIPTION TANKAGE BUILDINGS PIL FACILITIES CPF "CIVIL"
GROUP (CG 1) TOTAL
CPF- MEI
MAIN CIVIL
PORTION Overall 1 1 2 4
Portion 1A - 7 - 7
0 2 3 3 8
0 - 4 1 5
Armoured Loader - 2 1 3
Armoured Excavator 1 11 3 15
Armoured Dozer - - - -
EM63 6 - - 6
Ebinger LLMD 740M - - - -
Quest Metal Detector - - - -
RTK GPS - - 2 2
Err:509 - - - -
Err:509 3 - - 3
Err:509 - - - -
Err:509 - - - -
Water well drilling rig - - - -
Grader - 2 1 3
Err:509 - - - -
Wheel loader - - 8 8
Excavator - - 5 5
Err:509 - - - -
Roller compactor - - - -
Err:509 - - - -
Boom Truck 2 - 2 4
Skid Loader 6 - 4 10
Screening machine 4 - - 4
Pulverizing machine 1 - - 1
Ambulance - - - -
Mini Bus 2 - - 2
Coaster - - - -
Bus 55-Seater - - - -
Half lorry - - 2 2
Pickup - - - -
Sedan - - - -
SUV/Jeep 10 - - 10
Err:509 - - - -
Err:509 - - - -
Err:509 - - - -
Crane 50 Ton - - 1 1
Forklift - - - -
Welding machine 2 35 9 46
Tower Light - - - -
Generator (220,500,550,40,30 Kva) - - - -
Flatbed trailer 2 - 2 4
Err:509 3 5 3 11
Err:509 - - - -
Err:509 1 - - 1
Err:509 1 2 - 3
Err:509 - - - -
Err:509 - - - -
Err:509 8 - - 8
Err:509 4 4 - 8
Err:509 20 - 4 24
Err:509 4 1 5 10
Err:509 1 - - 1
Err:509 - - - -
Err:509 - - - -
Err:509 - - - -
Err:509 - - - -
Err:509 - - - -
Err:509 - - 4 4
Err:509 - - 5 5
Err:509 - - - -
Err:509 - - - -
Err:509 - - - -
Err:509 -
Err:509 -
Err:509 -
Err:509 -

Page 12 of 25
KUWAIT OIL COMPANY
DAILY EQUIPMENT REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO.: 12/30/1899
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : WELL BLOCK / INFIELD SATELLITE STATION NO. 2 (WB/ISS #2)
CONTRACT NO. : 15050901
CONSTRUCTION EQUIPMENT REPORT - WELL BLOCK / INFIELD SATELLITE STATION NO. 2 (WB/ISS #2)
(TRANS.
ATLANTIC) AL-GHANIM (AG1) AL-GHANIM (AG3)
DESCRIPTION BUILDINGS
TOTAL
PIONEER CMEI
OFFICES
PORTION Overall 4 1 5
Portion 1A 1 - 1
0 5 - 5
0 4 - 4
Armoured Loader 3 - 3
Armoured Excavator 3 - 3
Armoured Dozer - - -
EM63 4 - 4
Ebinger LLMD 740M - - -
Quest Metal Detector - - -
RTK GPS - - -
Err:509 - - -
Err:509 5 1 6
Err:509 3 - 3
Err:509 - - -
Water well drilling rig - - -
Grader - - -
Err:509 - - -
Wheel loader - - -
Excavator - - -
Err:509 - - -
Roller compactor - - -
Err:509 1 - 1
Boom Truck 3 - 3
Skid Loader - - -
Screening machine 2 - 2
Pulverizing machine 1 - 1
Ambulance - - -
Mini Bus 4 - 4
Coaster - - -
Bus 55-Seater - - -
Half lorry - - -
Pickup - - -
Sedan - - -
SUV/Jeep 3 - 3
Err:509 - - -
Err:509 - - -
Err:509 - - -
Crane 50 Ton 3 - 3
Forklift - - -
Welding machine 3 1 4
Tower Light - - -
Generator (220,500,550,40,30 Kva) - - -
Flatbed trailer 4 - 4
Err:509 2 1 3
Err:509 - - -
Err:509 - - -
Err:509 2 - 2
Err:509 - - -
Err:509 - - -
Err:509 29 - 29
Err:509 12 - 12
Err:509 39 1 40
Err:509 12 - 12
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -

Page 13 of 25
KUWAIT OIL COMPANY
DAILY EQUIPMENT REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO.: 12/30/1899
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : WELL BLOCK / INFIELD SATELLITE STATION NO. 3 (WB/ISS #3)
CONTRACT NO. : 15050901
CONSTRUCTION EQUIPMENT REPORT - WELL BLOCK / INFIELD SATELLITE STATION NO. 3 (WB/ISS #3)
FIRST KUWAITI AL-GHANIM (AG3)
DESCRIPTION NBTC (NB2) MEI BUILDINGS
TOTAL
(FK1) CIVIL
PORTION Overall - 1 1
Portion 1A - - -
0 2 - 2
0 5 - 5
Armoured Loader 1 - 1
Armoured Excavator 4 - 4
Armoured Dozer - - -
EM63 - - -
Ebinger LLMD 740M - - -
Quest Metal Detector - - -
RTK GPS - - -
Err:509 - - -
Err:509 - 1 1
Err:509 - - -
Err:509 - - -
Water well drilling rig - - -
Grader 2 - 2
Err:509 - - -
Wheel loader - - -
Excavator - - -
Err:509 - - -
Roller compactor - - -
Err:509 - - -
Boom Truck - - -
Skid Loader - 1 1
Screening machine - - -
Pulverizing machine - - -
Ambulance - - -
Mini Bus - - -
Coaster - - -
Bus 55-Seater - - -
Half lorry - - -
Pickup - - -
Sedan - - -
SUV/Jeep - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Crane 50 Ton - - -
Forklift - - -
Welding machine 6 - 6
Tower Light - - -
Generator (220,500,550,40,30 Kva) - - -
Flatbed trailer 1 - 1
Err:509 4 - 4
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 1 - 1
Err:509 4 - 4
Err:509 - - -
Err:509 1 1 2
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - -
Err:509 -
Err:509 -
Err:509 -
Err:509 -

Page 14 of 25
KUWAIT OIL COMPANY
DAILY EQUIPMENT REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO.: 12/30/1899
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : EXPORT OIL FACILITY (EOF) INCLUDING COCC - PIL SCOPE
CONTRACT NO. : 15050901
CONSTRUCTION EQUIPMENT REPORT - EXPORT OIL FACILITY (EOF) INCLUDING COCC - PIL SCOPE
(NBTC) (NB1) CMEI FIRST KUWAITI (FK2) AL-GHANIM (AG3)
DESCRIPTION HEISCO (TANKS)
PIL FACILTITIES BUILDINGS
TOTAL

PORTION Overall 1 1 2
Portion 1A 3 - 3
0 4 - 4
0 3 1 4
Armoured Loader 2 - 2
Armoured Excavator 5 1 6
Armoured Dozer - - -
EM63 - 1 1
Ebinger LLMD 740M - - -
Quest Metal Detector - - -
RTK GPS - - -
Err:509 - - -
Err:509 - 1 1
Err:509 - - -
Err:509 - - -
Water well drilling rig - - -
Grader 1 - 1
Err:509 - - -
Wheel loader - - -
Excavator 2 - 2
Err:509 - - -
Roller compactor - - -
Err:509 - - -
Boom Truck 2 - 2
Skid Loader - - -
Screening machine - - -
Pulverizing machine - - -
Ambulance - - -
Mini Bus - 3 3
Coaster - - -
Bus 55-Seater - - -
Half lorry - - -
Pickup - - -
Sedan - - -
SUV/Jeep - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Crane 50 Ton 1 1 2
Forklift 1 - 1
Welding machine 17 3 20
Tower Light 4 - 4
Generator (220,500,550,40,30 Kva) - - -
Flatbed trailer - - -
Err:509 4 1 5
Err:509 1 - 1
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 4 2 6
Err:509 6 1 7
Err:509 - 2 2
Err:509 4 - 4
Err:509 1 - 1
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 1 - 1
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - - -
Err:509 - -
Err:509 -
Err:509 -
Err:509 -
Err:509 -

Page 15 of 25
KUWAIT OIL COMPANY
DAILY EQUIPMENT REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO.: 12/30/1899
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : EXPORT OIL FACILITY (EOF) - CCC SCOPE
CONTRACT NO. : 15050901
CONSTRUCTION EQUIPMENT REPORT - EXPORT OIL FACILITY (EOF) - CCC SCOPE
DESCRIPTION [SC Name & Scope] TOTAL

PORTION Overall -
Portion 1A -
0 -
0 -
Armoured Loader -
Armoured Excavator -
Armoured Dozer -
EM63 -
Ebinger LLMD 740M -
Quest Metal Detector -
RTK GPS -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Water well drilling rig -
Grader -
Err:509 -
Wheel loader -
Excavator -
Err:509 -
Roller compactor -
Err:509 -
Boom Truck -
Skid Loader -
Screening machine -
Pulverizing machine -
Ambulance -
Mini Bus -
Coaster -
Bus 55-Seater -
Half lorry -
Pickup -
Sedan -
SUV/Jeep -
Err:509 -
Err:509 -
Err:509 -
Crane 50 Ton -
Forklift -
Welding machine -
Tower Light -
Generator (220,500,550,40,30 Kva) -
Flatbed trailer -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -
Err:509 -

Page 16 of 25
KUWAIT OIL COMPANY
DAILY MANPOWER SUMMARY REPORT

REPORT DATE: 4-Apr-24 REPORT NO. 21056720-SK3-CM-DAR-00728


CONTRACTOR: JV/C of Enshaat Al-Sayer General Trading & Contracting Co. WLL with Water & Soil Remediation S.R.L

PROJECT TITLE: South Kuwait Excavation, Transportation and Remediation (SKETR) Project (Zone-3)
ZONE # 3
CONTRACT NO. 21056720
OVER ALL MANPOWER SUMMARY
KEY PERSONNEL NO. HRS TOTAL Cum DIRECT NO. HRS TOTAL Cum
Req. Ava.
Project Manager 1 1 8 8 6,080 Portion 1-A
Construction Manager 1 1 8 8 6,128 EOD Technician Level 1 - 8 - 10,424
Civil Engineer 1 1 8 8 5,080 EOD Technician Level 2 - 8 - 10,376
Civil Supervisor 1 1 1 8 8 6,056 Pre-Topo Surveyor 2 8 16 13,144
Civil Supervisor 2 1 1 8 8 6,144 Assist-Surveyor 2 8 16 7,440
Planning engineer 1 1 1 8 8 6,096 Geologist & Land Surveyour - 8 - 7,320
Planning engineer 2 1 1 8 8 5,792 SSC Technician 3 8 24 11,360
Fleet Coordinator 1 1 8 8 6,112 Heavy Eqp.Operator / Driver - 8 - 59,608
Land Surveyor 1 1 1 8 8 6,160 Flag Man - 8 - 28,392
Land Surveyor 2 1 1 8 8 6,128 Helper 6 8 48 173,352
Land Surveyor 3 1 1 8 8 6,120 Welder 1 8 8 4,360
Land Surveyor 4 1 1 8 8 5,944 Subtotal 14 8 112 325,776
Quantity Surveyor 1 1 1 8 8 6,096 Portion 1-B
Quantity Surveyor 2 1 1 8 8 5,208 Surveyor 3 8 24 12,000
Administration Officer “Mandoub 1 1 8 8 6,088 Foreman 4 8 32 17,296
QA/QC Engineer 1 1 8 8 6,088 Geologist 1 8 8 5,001
HSE Manager 1 1 8 8 6,056 Helper 21 8 168 140,349
HSE Engineer 1 1 8 8 6,160 EOD Technician Level 1 6 8 48 256,696
Environmental Engineer 1 1 8 8 5,728 EOD Technician Level 2 5 8 40 43,488
Environmental/Remediation Specialist 1 1 8 8 6,104 EOD Technician Level 3 - 8 - 5,336
Remediation Specialist 1 1 8 8 6,104 UXO/EOD QC Specialist 3 8 24 13,664
Remediation Site Supervisor 1 1 8 8 5,568 Land Surveyor 1 8 8 6,856
GIS Specialist 1 1 1 8 8 6,088 Flag Man 2 8 16 61,005
GIS Specialist 2 1 1 8 8 4,784 Driver/Opertor 2 8 16 64,372
UXO/EOD Specialist 1 1 8 8 6,104 Subtotal 48 8 384 626,063
UXO/EOD Supervisor 1 1 8 8 6,104 Portion 2
UXO/EOD Safety Officer 1 1 8 8 6,104 Driver/Operator 112 8 896 208,720
UXO/EOD Quality Control Specialist 1 1 8 8 5,800 Helper/ Flagman 42 8 336 94,584
Multimedia Specialist 1 1 8 8 5,848 Rigger/Welder 1 8 8 3,520
Subtotal 29 29 8 232 171,872 Subtotal 155 8 1,240 306,824
INDIRECT NO. HRS TOTAL Portion 3A
Construction Manager - 8 - 2,856 Operator 56 8 448 58,384
Engineering Manager 1 8 8 3,984 Helper/ Flagman 33 8 264 34,744
Snr. Techinical Engineer - 8 - 3,240 Foreman 2 8 16 3,272
Snr. Planning Engineer 1 8 8 4,112 - -
Secretary 1 8 8 4,272 - -
Data Entry Clerk 2 8 16 4,688 Subtotal 91 24 728 96,400
Document Control 2 8 16 10,600 Portion 5A
Contract Admin - 8 - 3,408 Foreman 2 8 16 4,600
Draftsman 1 8 8 7,744 Driver/Operator 38 8 304 80,576
Supervisor 12 8 96 44,120 Helper/ Flagman 57 8 456 67,282
QA/QC Engineer 1 8 8 4,104 Land Surveyor 1 8 8 2,446
QA/QC Inspector 3 8 24 11,392 Welder/GCL Techinician 14 8 112 11,160
Paramedic 2 8 16 9,144 Mason/Electrician 4 8 32 2,792
Supervisor Scaffolding 1 8 8 4,152 Carpenter 3 8 24 7,470
Assistant Land Surveyor - 8 - 8 Subtotal 119 8 952 176,326
Permit Coordinator 1 8 8 8,608 General
HR Coordinator 1 8 8 4,104 Electrician 2 8 16 10,928
Time Keeper 1 8 8 4,608 Ambulance Diver 1 8 8 8,464
Store Keeper 1 8 8 4,224 Halflorry Driver 1 8 8 8,336
Hygiene officer 1 8 8 4,008 Water tanker Driver 3 8 24 24,224
HSE Trainer 1 8 8 4,008 Pipe Fitter 1 8 8 4,168
Safety Officer 15 8 120 66,584 Foreman 2 8 16 16,936
Civil Engineer 11 8 88 40,720 Helper 20 8 160 67,160
Warehouseman 1 8 8 4,440
Light Driver / Heavy Driver 47 8 376 147,896
Carpenter - 8 - 80
Mason 1 8 8 2,800
Scaffolder - 8 - 1,408
Fabricator - 8 - 24
Steel Fixer - 8 - 1,464
Crane, Trailer, Forklift & boom Truck Op 4 8 32 12,416
Subtotal 59 8 472 254,688 Subtotal 83 8 664 310,744
TOTAL Direct & Indirect 598 8 4,784 2,268,693 TOTAL Direct 510 8 4,080 1,745,733
PREPARED BY CONTARCTOR : JV/C of Enshaat Al-Sayer General Trading & Contracting Co. WLL with Water & REVIEWED BY COMPANY :
Soil Remediation S.R.L

DESIGNATION : Project Manager NAME :


DATE : DESIGNATION :
DATE :

SIGNATURE : - SIGNATURE : -

Form No: 21056720-SK3-CM-FRM-00001 Rev A. 19 Oct.2021 Page 17 of 25


KUWAIT OIL COMPANY
DAILY EQUIPMENT SUMMARY REPORT

REPORT DATE: 4-Apr-24 REPORT NO. 21056720-SK3-CM-DAR-00728


CONTRACTOR: JV/C of Enshaat Al-Sayer General Trading & Contracting Co. WLL with Water & Soil Remediation S.R.L

PROJECT TITLE: South Kuwait Excavation, Transportation and Remediation (SKETR) Project (Zone-3
ZONE # 3
CONTRACT NO. 21056720
OVER ALL CONSTRUCTION EQUIPMENT SUMMARY AS PER PORTION
DESCRIPTION NO. HRS. TOTAL CUM. HRS. REMARKS DESCRIPTION NO. HRS. TOTAL CUM. HRS. REMARKS
PORTION Overall
Portion 1A
- 8 - -
- 8 - -
- 8 - -
Portion 1B
Armoured Backhoe - 8 - 16,776
Armoured Loader 1 8 8 20,200
Armoured Excavator 1 8 8 19,760
Armoured Dozer - 8 - 3,552
EM63 - 8 - -
Ebinger LLMD 740M 2 8 16 48,160
Schonstedt GA 72 Cd 6 8 48 297,288
Minelab F3 2 8 16 22,384
Quest Metal Detector 3 8 24 59,856
RTK GPS 3 8 24 11,736
Excavator - 8 - 576
Loader - 8 - 304
Water well drilling rig - 8 - 240
Dump Truck - 8 - 256
Plate Compactor - 8 - 152
Portion 02 .
Grader 2 8 16 14,208
Dozer 5 8 40 8,648
Wheel loader 19 8 152 31,552
Excavator 15 8 120 28,576
JCB (Backhoe Loader) - 8 - 4,216
Roller compactor 1 8 8 8,608
Dump truck-32M3 37 8 296 89,712
Dump truck-19M3 & 24M3 32 8 256 53,224
Skid Loader 1 8 8 3,648
Screening machine - 8 - 736
Pulverizing machine - 8 - 592
Screener/Pulverizer Centralized 6 8 48 8,472
Portion 3A
Loader 11 8 88 8,336
Dump truck-19M3 - 8 - 2,608
Dump truck-32M3 14 8 112 17,152
Skid Loader - 8 - 248
Excavator 18 8 144 16,240
Water Tanker 9 8 72 9,384
JCB (Backhoe Loader) 4 8 32 3,112
Bobkat - 8 - -
Portion 5A
Truckmounted Rig - 8 - 1,192
Excavator 4 8 32 7,352
Wheel loader 4 8 32 7,248
Grader 1 8 8 4,848
Roller compactor 1 8 8 2,936
Dump truck-45M3 - 8 - 176
Dump truck-32M3 5 8 40 7,328
Dump truck-19M3 9 8 72 36,664
Water Tanker 2 8 16 3,752
Skid Loader / Bob cat 6 8 48 3,904
Crane 80 Ton 1 8 8 832
Crane 25 Ton 1 8 8 888
Crane 55 Ton 1 8 8 680
Flatbed trailer 2 8 16 1,632
Tower Light/Tower Loop 16 8 128 20,800
Diesel Generator 1 8 8 1,984
General
Ambulance 1 8 8 8,112
Mini Bus 16 8 128 73,320
Coaster 2 8 16 8,376
Bus 55-Seater 5 8 40 20,480
Half lorry 1 8 8 9,448
Pickup 24 8 192 102,336
Sedan 4 8 32 18,208
SUV/Jeep 21 8 168 88,048
Crane 50 Ton 1 8 8 4,528
Forklift 1 8 8 3,694
Welding machine 2 8 16 8,272
Tower Light 15 8 120 40,568
Generator (220,500,550,40,30 Kv 7 8 56 24,392
Flatbed trailer 1 8 8 4,224
Boom Truck 1 8 8 3,536
Water tanker 3 8 24 15,552
- - - -
TOTAL 351 8 2,808 1,345,822 TOTAL
PREPARED BY CONTARCTOR : JV/C of Enshaat Al-Sayer General Trading & Contracting Co. WLL with Water & Soil REVIEWED BY COMPANY :
Remediation S.R.L
DESIGNATION : Project Manager NAME :
DATE : DESIGNATION :
DATE :

SIGNATURE : - SIGNATURE : -

Form No: 21056720-SK3-CM-FRM-00001 Rev A. 19 Oct.2021 Page 18 of 25


KUWAIT OIL COMPANY

ATTACHMENT # 01
REPORT DATE: 4/Apr/24 21056720-SK3-CM-DAR-00728
CONTRACTOR: JV/C of Enshaat Al-Sayer General Trading & Contracting Co. WLL with Water & Soil Remediation S.R.L
PROJECT TITLE: South Kuwait Excavation, Transportation and Remediation (SKETR) Project (Zone-3)
ZONE # 3
CONTRACT NO. 21056720

UXO CLEARANCE - DOL

S.N DESCRIPTION UOM CUMM.TILL PREV.WEEK 30-Mar-24 31-Mar-24 1-Apr-24 2-Apr-24 3-Apr-24 4-Apr-24 5-Apr-24 CUMM. TILL DATE
1 REVISED BL PLAN M2 5,327,207 - 5,327,207
2 ACTUAL M2 5,297,813 - - 5,297,813

3 Variance M2 (29,393) - - - - - - - (29,393)

UXO CLEARANCE - WOL

S.N DESCRIPTION UOM CUMM.TILL PREV.WEEK 30-Mar-24 31-Mar-24 1-Apr-24 2-Apr-24 3-Apr-24 4-Apr-24 5-Apr-24 CUMM. TILL DATE

1 REVISED BL PLAN M2 2,820,853 - 2,820,853

2 ACTUAL M2 2,815,127 2,815,127

3 Variance M2 (5,726) - - - - - - - (5,726)

UXO CLEARANCE - OCP

S.N DESCRIPTION UOM CUMM.TILL PREV.WEEK 30-Mar-24 31-Mar-24 1-Apr-24 2-Apr-24 3-Apr-24 4-Apr-24 5-Apr-24 CUMM. TILL DATE

1 REVISED BL PLAN M3 242,863 - - - - - - - 242,863

2 ACTUAL M3 243,144 - - 243,144

3 Variance M3 281 - - - - - - - 281

EXCAVATION OF DOL & WOL AND LOADING OF OCP SOIL

S.N DESCRIPTION UOM CUMM.TILL PREV.WEEK 30-Mar-24 31-Mar-24 1-Apr-24 2-Apr-24 3-Apr-24 4-Apr-24 5-Apr-24 CUMM. TILL DATE

1 REVISED BL PLAN Ton 2,178,695 6,867 6,867 6,867 6,867 6,867 6,867 2,219,899

2 ACTUAL Ton 2,310,568 7,253 7,149 6,933 6,930 6,961 6,961 2,352,755

3 Variance Ton 131,873 386 282 66 63 94 94 132,856

TRANSPORTATION

S.N DESCRIPTION UOM CUMM.TILL PREV.WEEK 30-Mar-24 31-Mar-24 1-Apr-24 2-Apr-24 3-Apr-24 4-Apr-24 5-Apr-24 CUMM. TILL DATE

1 REVISED BL PLAN Ton 1,902,265 7,024 7,024 7,024 7,024 7,024 7,024 1,944,407

2 ACTUAL Ton 2,183,747 8,278 9,188 7,746 7,462 8,070 8,743 2,233,234

3 Variance Ton 281,482 1,254 2,164 722 438 1,046 1,719 288,827

SCREENING AND PULVERIZING

S.N DESCRIPTION UOM CUMM.TILL PREV.WEEK 30-Mar-24 31-Mar-24 1-Apr-24 2-Apr-24 3-Apr-24 4-Apr-24 5-Apr-24 CUMM. TILL DATE

1 REVISED BL PLAN Ton 1,620,807 7,944 7,944 7,944 7,944 7,944 7,944 1,668,470

2 ACTUAL @ STOCKPILE Ton 1,621,930 10,582 9,188 10,077 10,027 9,706 8,910 1,680,420

5 VARIANCE Ton 1,123 2,638 1,244 2,133 2,083 1,762 966 - 11,950

LOADING OF BIO PILES

S.N DESCRIPTION UOM CUMM.TILL PREV.WEEK 30-Mar-24 31-Mar-24 1-Apr-24 2-Apr-24 3-Apr-24 4-Apr-24 5-Apr-24 CUMM. TILL DATE

1 REVISED BL PLAN Ton 1,372,398 1,372,398

2 ACTUAL Ton 1,151,664 9,095 8,479 6,429 10,696 11,665 8,822 1,206,849

3 Variance Ton (220,734) 9,095 8,479 6,429 10,696 11,665 8,822 (165,549)

OFFLOADING OF BIO PILES

S.N DESCRIPTION UOM CUMM.TILL PREV.WEEK 30-Mar-24 31-Mar-24 1-Apr-24 2-Apr-24 3-Apr-24 4-Apr-24 5-Apr-24 CUMM. TILL DATE

1 REVISED BL PLAN Ton 216,000 216,000

2 ACTUAL Ton 432,551 6,700 5,450 3,810 4,700 5,000 6,250 - 464,461

3 Variance Ton 216,551 6,700 5,450 3,810 4,700 5,000 6,250 - 248,461

REMARKS / ISSUES & CONCERNS

3
PREPARED BY CONTARCTOR : JV/C of Enshaat Al-Sayer General Trading & Contracting Co. WLL with REVIEWED BY COMPANY :
Water & Soil Remediation S.R.L
DESIGNATION : Project Manager NAME :
DATE : DESIGNATION :
SIGNATURE : - DATE :
SIGNATURE :-
KUWAIT OIL COMPANY
DAILY EQUIPMENT REPORT (BY AREA)
DATE : 30-Dec-99 REPORT NO.: 12/30/1899
CONTRACTOR : CONSORTIUM OF PETROFAC AND CCC
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
AREA : LAYDOWN AREA
CONTRACT NO. : 15050901
CONSTRUCTION EQUIPMENT REPORT - LAYDOWN AREA
FIRST KUWAIT FIRST KUWAIT
FIRST KUWAIT (SINOPEC)
(FK2) (FK2) HEISCO AL-GHANIM (AG1) AL-GHANIM (AG3) NBTC (NB2) MEI TOTAL EXCLUDED
DESCRIPTION CCC (FK1) CPF- MEI LAYDOWN CMEI LAYDOWN AG LAYDOWN LAYDOWN
PIL LAYDOWN PIL LAYDOWN CCC
FK LAYDOWN LAYDOWN
CPF EOF
PORTION Overall 1 - 1 - - 1 3
Portion 1A - - - - - - -
0 2 - - - - - 2
0 - - 1 - - - 1
Armoured Loader - - - - - - -
Armoured Excavator - - - - - - -
Armoured Dozer 3 1 - - - 1 5
EM63 - - - - 3 - 3
Ebinger LLMD 740M - - - - - - -
Quest Metal Detector - - - - - - -
RTK GPS 8 - - - - - 8
Err:509 2 - - - - - 2
Err:509 1 - - - - - 1
Err:509 1 1 - - 1 - 3
Err:509 - - - - - - -
Water well drilling rig - - - - - - -
Grader 4 2 - - - - 6
Err:509 - - - - - - -
Wheel loader 6 - - - - 4 10
Excavator 2 - - - - - 2
Err:509 - - - - - - -
Roller compactor 3 - - - - - 3
Err:509 1 - - - - - 1
Boom Truck 2 - - - - - 2
Skid Loader - 2 - 1 - - 3
Screening machine 2 - - - 2 - 4
Pulverizing machine 2 - - - 3 1 6
Ambulance - - - - - - -
Mini Bus - - - - 6 2 8
Coaster - - - - 21 1 22
Bus 55-Seater - - - - - - -
Half lorry - - - - - - -
Pickup - - - - - - -
Sedan - - - - - - -
SUV/Jeep 6 - - - - - 6
Err:509 - - - - - - -
Err:509 - - - - - - -
Err:509 - - - - - - -
Crane 50 Ton 2 - - - - - 2
Forklift 2 - - - - - 2
Welding machine - - 1 - - - 1
Tower Light - - 1 - - - 1
Generator (220,500,550,40,30 Kva) - - - - - - -
Flatbed trailer 1 - - - - 1 2
Err:509 1 - 1 - - - 2
Err:509 2 - - - - - 2
Err:509 1 - - - - 1 2
Err:509 3 - - - 1 1 5
Err:509 - - - - - - -
Err:509 - - - - - - -
Err:509 8 - - - 3 - 11
Err:509 4 2 1 - 2 - 9
Err:509 - - - 1 5 - 6
Err:509 10 - - - 2 - 12
Err:509 1 - - - 1 - 2
Err:509 - - - - - - -
Err:509 - - - - - - -
Err:509 - - - - - - -
Err:509 - - - - - - -
Err:509 - - - - - - -
Err:509 - - - - - - -
Err:509 - - - - - 2 2
Err:509 - - - - 12 1 13
Err:509 - - - - 2 - 2
Err:509 - - - - - -
Err:509 -
Err:509 - -
Err:509 -
Err:509 -

Page 20 of 25
LOWER
PROJECT
FARS
: HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
SUB -C CONTRACTOR MANULA MANPOWER SATUS DATE 30-Dec-99
CPF WB2 & ISS 2 WB3 & ISS 3 EOF CAMP

(First (First (Al- OVER ALL


(Al-Ghanim) Al-Ghanim (Al-Ghanim) (First (NBTC) First Kuwaiti (Al-Ghanim) (Al-Ghanim) Al-Ghanim First Kuwait First Kuwait SUB-CON MP
(HEISCO) Kuwaiti) Kuwaiti) (CG) Main NBTC (NB2) Ghanim) HEISCO (HEISCO)
MANUAL (AG3) TOTAL (AG1) (AG3) TOTAL Kuwaiti) TOTAL (NB1) (FK2) (AG3) TOTAL (AG3) (AG1) (FK1) (FK2) TOTAL (MANUAL)
Tankage (FK2) (FK1) Civil MEI (AG3) (Tanks) Tankage
Buildings CMEI Camp FK Camp PIL Camp
Buildings CMEI Buildings (FK1) Civil CMEI PIL faciltities Buildings
PIL facilities CPF "Civil" Buildings

Civil Foreman - 23 - 7 16 46 20 1 21 12 - 1 13 9 - - - 9 #REF! #REF! #REF! #REF! #REF! #REF! #REF!


Civil Carpenter - 51 - 31 43 125 91 - 91 - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Civil Steel Fixer - 35 - 30 89 154 78 - 78 - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Civil Mason - 19 - 11 19 49 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Civil Scaffolders - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Civil Labour - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Civil Signal/Banks Man - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Civil Technician - 5 - - 1 6 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Eqp. Foreman - 1 - - - 1 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Eqp. Rigger - 7 - - - 7 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Eqp. Millwright - 58 - 36 100 194 - - - 14 - 3 17 17 - - 2 19 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Eqp. Helper - - - - - - - - - 14 - 1 15 26 - - 6 32 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Pip. Foreman - - - - - - - - - 3 - - 3 - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Pip. Pipe Fitter - - - - - - - - - - - - - 1 - - - 1 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Pip. Welder - - - - - - - - - - - 1 1 - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Pip. Rigger - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Pip. Grinder - - - - - - - - - 2 - - 2 - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Pip. Gas Cutter - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Pip. Helper - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Str. Foreman / Chargehand - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Str. Rigger - 2 - 2 - 4 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Str. Fitter - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Str. Helper - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Str. Welder - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Str. Grinder - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Elec & HVAC Foreman - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Elec & HVAC Electrician - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Elec & HVAC Cable Jointer - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Elec & HVAC Welder - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Elec & HVAC Helper - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Ins. Foreman Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Ins. Technician Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 22 3 25 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Ins. Welder Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 51 3 54 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Ins. Helper Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Paint. Foreman Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 2 - 2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Paint. Blaster Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 8 - 8 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Paint. Painter Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Paint. Helper Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
NDT Technician Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Gen. Operator Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Gen. Mechanic Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Gen. Helper/Plumber Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Gen. Driver Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Surveyor Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Insulator Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Painter Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Drillers Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Firewatch Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
Sand Blaster Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! Err:509
TOTAL MANUAL Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
LOWER
PROJECT
FARS
: HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
SUB -C CONTRACTOR MANULA MANPOWER SATUS DATE 30-Dec-99
CPF WB2 & ISS 2 WB3 & ISS 3 EOF CAMP

(First (First (Al- OVER ALL


(Al-Ghanim) Al-Ghanim (Al-Ghanim) (First (NBTC) First Kuwaiti (Al-Ghanim) (Al-Ghanim) Al-Ghanim First Kuwait First Kuwait SUB-CON MP
(HEISCO) Kuwaiti) Kuwaiti) (CG) Main NBTC (NB2) Ghanim) HEISCO (HEISCO)
MANUAL (AG3) TOTAL (AG1) (AG3) TOTAL Kuwaiti) TOTAL (NB1) (FK2) (AG3) TOTAL Tankage
(AG3) (AG1) (FK1) (FK2) TOTAL (MANUAL)
Tankage (FK2) (FK1) Civil MEI (AG3) (Tanks) Buildings CMEI Camp FK Camp PIL Camp
Buildings CMEI Buildings (FK1) Civil CMEI PIL faciltities Buildings
PIL facilities CPF "Civil" Buildings

Managers - 1 - 1 - 2 1 1 2 - 1 - 1 1 - - - 1 #REF! #REF! #REF! #REF! #REF! #REF! #REF!


HSE supervisor /Cordinator - 1 1 - 1 3 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Superintendents - 1 - - - 1 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Craft Supervisors - - - - - - 13 - 13 - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Field Engineer - - - - - - 1 - 1 - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Procurement - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Cost/Planning - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accounting - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Contracts - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Other Non-Manual - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Safety Officer - - - - - - 1 - 1 - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Supervisors - 1 - - - 1 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
QC - 3 1 2 - 6 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Technician - 6 - - - 6 2 - 2 - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Foreman - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Scanner - 1 - - - 1 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
CPT Operator - - - - - - 3 - 3 - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Geologist - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Security Guard - 1 - - - 1 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Store Keeper - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Male nurse - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Quatity Surveying - 1 - - 1 2 - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- Err:509 - - -
TOTAL MANUAL - 16 2 3 2 23 21 1 22 - 1 Err:509 1 1 - - - - 1 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
LOWER
PROJECT
FARS
: HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
SUB -C CONTRACTOR EQUIPMENT SATUS DATE 30-Dec-99
CPF WB2 & ISS 2 WB3 & ISS 3 EOF CAMP

(First (First (Al- OVER ALL


(Al-Ghanim) Al-Ghanim (Al-Ghanim) (First (NBTC) First Kuwaiti (Al-Ghanim) (Al-Ghanim) Al-Ghanim First Kuwait First Kuwait SUB-CON MP
(HEISCO) Kuwaiti) Kuwaiti) (CG) Main NBTC (NB2) Ghanim) HEISCO (HEISCO)
MANUAL (AG3) TOTAL (AG1) (AG3) TOTAL Kuwaiti) TOTAL (NB1) (FK2) (AG3) TOTAL (AG3) (AG1) (FK1) (FK2) TOTAL (MANUAL)
Tankage (FK2) (FK1) Civil MEI (AG3) (Tanks) Tankage
Buildings CMEI Camp FK Camp PIL Camp
Buildings CMEI Buildings (FK1) Civil CMEI PIL faciltities Buildings
PIL facilities CPF "Civil" Buildings

SUV/Car - 1 - 1 2 4 4 1 5 - - 1 1 1 - - 1 2 #REF! #REF! #REF! #REF! #REF! #REF!


Pickup - - - 7 - 7 1 - 1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Mini Bus- 22/13 Seater - 2 - 3 3 8 5 - 5 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Bus - 55 Seater - - - 4 1 5 2 - 2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Ambulance - - - 2 1 3 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Hiab / Boom Truck - 1 - 11 3 15 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
DumpTruck - - - - - - 29 - 29 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Trailer - 6 - - - 6 12 - 12 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Lo-bed Trailer - - - - - - 39 1 40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Diesel Tanker - - - - - - 12 - 12 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Forklift - - - - 2 2 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Manlift - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Crane upto 20T - 3 - - - 3 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Crane >20 to 100T - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Crane > 100T - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Excavator - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Backhoe (JCB) - - - 2 1 3 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Grader - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Skid Steer Loader - - - - 8 8 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Loader - - - - 5 5 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Compactor/Roller - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Conc. Mixer - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
DG upto 60KVa - - - - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
DG > 60 KVa to 250KVa - 2 - - 2 4 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
DG >250 Kva to 500KVa - 6 - - 4 10 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
DG > 500KVa - 4 - - - 4 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Diesel Welding Machine - 1 - - - 1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Welding Rectifier - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Tower Light - 2 - - - 2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Bar Cutting Machine - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Barbending Machine - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Drilling Rig - - - - 2 2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Concrete Vibrator - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Mother Oven - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Pipe Layer / Side Boom - 10 - - - 10 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Rock breaker - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Jeep - 2 - - 2 4 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
JCB - 3 - 5 3 11 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Truck - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Water tanker - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Tipper Truck - - - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
EIA Study Mobile Van - - - - - - - - - - - - - - - - - - #REF! #REF! #REF! #REF! #REF! #REF!
Half Lorry Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Pay welder Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Air Compressor Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Portable Oven Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Hopper Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Screening Plant Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Pump - LD Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Pump - HD Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Batch Plant < 25 CMH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Batch Plant > 25 CMH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Auger / Drill Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Facing Machine Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Induction Heater Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Drilling Truck Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
CPT Machine Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Cable Locator Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Bob Cat Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Total Station Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Dozer Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Vaccum Tanker Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
Scissor /Man Lift Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! Err:509
-
TOTAL MANUAL Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 #REF! #REF! - #REF! #REF! #REF! #REF!
PROJECT : LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
CONTRACT NO. : Date 30-Dec-99

OVER ALL MANUAL MANPOWER STATUS

CONT / SUB CON / AREA SITE OFC CCC CPF ISS 2 ISS 3 EOF PIPE LINE PSC CAMP Total Remarks

PIL #REF! #REF!

CCC #REF! #REF! #REF!

HEISCO 0 0 #REF! #REF!

ALGHANIM 3 271 15 18 30 #REF! #REF!

ALGHANIM 1 504 #REF! #REF!

FIRST KUWAITI 1 131 236 #REF! #REF!

FIRST KUWAITI 2 0 0 #REF! #REF!

NBTC 1 167 167

NBTC 2 0 0

COMBINED GRP. 303 303

SINOPEC 5 5

Total #REF! 0 710 519 254 197 0 #REF! #REF! #REF!

OVER ALL NON-MANUAL MANPOWER STATUS


CONT / SUB CON / AREA SITE OFC CCC CPF ISS 2 ISS 3 EOF PIPE LINE PSC CAMP Total Remarks

PIL #REF! #REF!

CCC #REF! #REF! #REF!

TRANS ATLANTIC 0 0

HEISCO 0 0 #REF! #REF!

ALGHANIM 3 74 6 7 8 #REF! #REF!

ALGHANIM 1 50 50

FIRST KUWAITI 1 22 14 36

FIRST KUWAITI 2 6 2 #REF! #REF!

NBTC 1 26 26

NBTC 2 3 3

COMBINED GRP. 22 22

SINOPEC 16 16

Total #REF! 0 140 56 24 36 0 #REF! #REF! #REF!