Purpose of Local System Plan
2
2
LSP Communication
• LSP is communicated to the PAC at an ISO-NE PAC RSP
meeting once a year.
– Separate meetings can be arranged if needed
• PAC, Transmission Customers, and other Stakeholders
have 30 days to provide written comments for
consideration to CMP
– CMP’s contact:
Curtis Beveridge
Manager System Planning
Central Maine Power Company
83 Edison Drive
Augusta, Maine 04336
(email: curtis.beveridge@cmpco.com)
3
3
LSP Communication cont.
4
4
CMP LSP Project List
• Central Maine Power will update the LSP project list at least annually.
• Similar to PTF projects in the RSP, the LSP project list contains a status of each
non-PTF project:
5
5
CMP’s Local System Planning
Process
6
6
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Bowman St 115/34.5
kV transformer
Bowman St Add 2nd 115/34.5
overloaded and low 2011 Under Construction
Substation kV transformer
34.5 kV bus voltage,
Augusta post-contingency
Area Reliability Add 115/12.47 kV
Study transformer at Voltage violations
Coopers Mills
Coopers Mills following loss of 2014 Proposed
Substation
(Maxcy's) Maxcys 115/34.5 kV
Coordinate transformer
w/MPRP
7
7
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Overloaded under
Rebuild 34.5 kV single element
Bath Area 2011
Line work Sections 55 & 58 contingency Under Construction
Load Study conditions
8
8
LSP Projects
New 34/12 kV
Experiencing high Under
Bassett Substation
Bassett load growth, Construction
and 2nd 34.5 kV 2011
Substation thermal restriction
transmission line to
on Section 118
Quaker Hill
Berwick -
Lebanon New 34/12 kV Load growth,
Area Reliability Berwick Substation inadequate 34/12 2013 Planned
Berwick
and 34.5 kV kV capacity,
Study Substation
transmission line to overloaded
Bassett distribution circuits
Add new Lebanon Load growth in Planned
New Lebanon Substation and 34.5 Lebanon area will
2013
Substation kV transmission line exceed area
to Butler’s Corner capacity
9
9
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Install a 115 kV Severe Low Voltage
Bath
bus-tie breaker at occurs with a Bath 2013 Proposed
Substation
Bath Substation 115 kV bus-fault
Overloaded under
Re-rate 34.5 kV single element
Line work 2013 Proposed
Section 76 contingency
conditions
Upgrade
Brunswick - Brunswick Overloaded under Proposed
Brunswick Hydro
Topsham Area Hydro normal operating 2013
T1 34/12 kV
Study Substation conditions
transformer
Upgrade Overloaded under
Woolwich Woolwich T1 normal operating
conditions 2014 Proposed
Substation 34/12 kV
transformer
Upgrade Topsham Overloaded under
Topsham
T2 34/12 kV normal operating 2014 Proposed
Substation
transformer conditions
10
10
10
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Brunswick -
Topsham Area Upgrade Topsham Overloaded under
Study Topsham 115 115 kV T1 and T3 single element
2014 Proposed
kV Substation 115/34.5 kV contingency
(Cont)
transformers conditions
11
11
11
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Build a new Leeds Voltage violations
Leeds 115/34.5 kV and overloaded Under Construction
Substation distribution transformer at 2012
substation Turner
Change protection 34.5 kV line Proposed
Lewiston - Line work settings on overload post- 2013
Auburn Area Section 72 contingency
Reliability Replace Section
Study 34.5 kV line Proposed
Great Falls 148 cable into
overload post- 2013
Substation Great Falls
contingency
Substation
Transformer
Upgrade Gulf Concept
Gulf Island overloaded with load
Island 115/34.5 kV 2020
Substation growth, with MPRP
T1 transformer
reinforcements
12
12
12
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
New (9.5 mile)
34.5 kV line from Concept
2015
Bridgton to
Kimball Road
Voltage violations
Install a 5.4 MVAR
under contingent
capacitor bank at 2015 Concept
system conditions
Kimball Road
Lovell Area
Lakes Region Upgrades Install a 5.4 MVAR
Area capacitor bank at 2015 Concept
Lovell
Reliability
Study Back feeding NH
Remove voltage
under post-
supervision for the Proposed
contingent
reverse power 2013
conditions creates
relaying on Lovell
voltage and thermal
T1
violations
Two 34.5 kV
North Voltage violations Concept
breakers, two 5.4
Limington under contingent 2015
MVAR capacitor
Upgrades system conditions
banks 13
13
13
LSP Projects
14
14
14
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Add 5.4 MVAR Under Construction
34.5 kV capacitor Low voltage 2011
Park St bank
Substation Add 3.6 MVAR Proposed
34.5 kV capacitor Low voltage 2013
Midcoast Area
bank
NTA Analysis
(the Camden - Add two 5.4 MVAR Under Construction
Meadow Rd
Rockland 34.5 kV capacitor Low voltage 2011
Substation
banks
Area Reliability
Study) Voltage and thermal
Add 1 mile 34.5 kV violations under
line to separate contingent system Proposed
Line Work conditions 2013
Section 51 (Warren
– Waldoboro) (Not needed if NTA
is approved)
15
15
15
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Add a 2.7 MVAR
capacitor bank at Low voltage 2013 Proposed
Boothbay
Boothbay
Upgrades Power Factor
Correction at
Low voltage 2013 Proposed
Boothbay Harbor
12 kV
Relay 34.5 kV line
Midcoast Area Mason Modifications on overload post-
contingency 2013 Proposed
NTA Analysis Upgrades Section 25 at
(Cont) Mason
Voltage violations
under contingent
Rebuild 34.5 kV system conditions
Line Work 2013 Proposed
Section 23
(Not needed if NTA
is approved)
Transformer
Coopers Mills Upgrade Coopers
overloaded post- 2013 Planned
Upgrades Mills T1 115/34 kV
contingency
16
16
16
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
New 115 kV bus
with four breaker, Voltage and thermal
breaker-and-a-half violations under
Raven Farm configuration. contingent system
Expansion Also, install a conditions 2015 Proposed
(115/34.5 kV) 115/34 kV (Not needed if NTA
transformer and is approved)
34.5 kV line to
Elm Street
Portland
Area NTA Overloaded under
Analysis single element
Rebuild 34.5 kV contingency
conditions 2015 Proposed
Section 181
(Not needed if NTA
Line work is approved)
Overloaded under
Rebuild a portion
single element
of 34.5 kV Section 2015 Proposed
contingency
180
conditions
17
17
17
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Portland Transformer
overloaded under
Area NTA Upgrade Red contingent system
Analysis Red Brook Brook T1 to a 2015 Proposed
conditions
(Cont) 30/50 MVA
(Not needed if NTA
is approved)
18
18
18
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Thermal violations
Re-rate portions of under normal
Line work 34kV line Section operating and 2011 Under Construction
102 contingent system
conditions
19
19
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Add two 2.7 MVAR Voltage violations
Voltage
capacitor banks at under contingent 2013 Proposed
support
Freeport system conditions
Add two 5.4 MVAR
Voltage violations
Voltage capacitor banks at
under contingent 2013 Proposed
support North Windham
system conditions
Portland North S/S
Area Reliability Voltage violations
Bishop Street Add a 5.4 MVAR Proposed
Study under contingent 2013
Substation capacitor bank
(Cont) system conditions
Thermal violations
under contingent
Bring S164 in/out of
Elm Street system conditions Proposed –Pending
Elm St, re-rate 2013
Substation (Not needed if NTA conclusion
S164A
Raven Farms 115
kV is built)
20
20
20
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Could overload under
normal operating
Rebuild Section
Line work and/or single element 2013 Planned
103
contingency conditions
in 2010
Voltage and 25 MW
loss of load criteria
Add two 34.5 kV Proposed –Pending
Falmouth violations under
Portland North breakers 2013 NTA conclusion
Substation contingent system
Area Reliability (Not needed if hybrid
Study NTA is approved)
(Cont)
Proposed – Pending
Swett Rd. Low Voltages in the
Add two 34 kV Lakes Region Area
local area under single 2014
Substation breakers Reliability Study
element contingencies
results
115-34 kV Additional source
Proposed –Pending
East Deering substation with needed in the area
2015 NTA Analysis
Substation 115 kV line from (Not needed if NTA is
Raven Farm. approved)
21
21
21
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
New 115/34kV Voltage violations
S/S tapped from under contingent
North Sect 166, and system conditions
Proposed –Pending
Yarmouth 14.8 mi 34.5 kV 2015
(Not needed if hybrid NTA Conclusion
Substation line to Gray &
Freeport with NTA is approved)
breakers
Portland North
Area Reliability Proposed – Pending
Voltage violations
Swett Road Add 5.4 MVAR Lakes Region Area
Study under contingent 2016
Substation capacitor bank Reliability Study
(Cont) system conditions
results
Voltage violations
under contingent
Add an additional
Prides Corner system conditions Proposed –Pending
5.4 MVAR 2018
Substation NTA Conclusion
capacitor bank
(Not needed if hybrid
NTA is approved)
22
22
22
LSP Projects
Projected Status
Project Project Needs
Major Project In-Service
Origin Description Assessment
Date
New 115/34.5 kV
Substation in Old
Orchard Beach Additional 115 kV
New Vallee Lane and 115 kV transformer capacity
Saco Bay Substation double-circuit line and voltage support is
Area from Louden to needed in the Saco
Old Orchard Bay Area. Loss of Under
Reliability 2012
Beach Section 193 violates Construction
Study
CMP’s 25 MW loss of
load criterion.
New Goosefare New 115/12 kV
Substation substation in Saco
23
23
23
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Overloaded under
Re-rate Section single element Under Construction
Line work 2011
73 contingency
conditions
Tap Section 73,
Skowhegan install 34/34 delta- Distribution circuit
Area Norridgewock wye isolating becoming
2012 Under Construction
Reliability Source transformer for overloaded, need a
Study new distribution new source
supply
Loop Section 241
Lakewood into a new 115 kV Voltage violations
Substation ring bus with 2nd under contingent 2013 Under Construction
Expansion 115/34.5 kV system conditions
transformer
24
24
24
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Overloaded under
Re-rate portions of
single element
Line work 34.5 kV line 2012 Planned
contingency
Section 38.
conditions
Reliability and
Install a 115/34 kV voltage concerns on
Waterville - transformer and a very long 34.5 kV
Winslow Area two 115 kV distribution circuit
Reliability Belgrade breakers at North out of Rice Rips;
Study Source / Augusta with a need to bring in a 2012 Planned
Hospital Feed new 34.5 kV new source to shift
distribution circuit load. The addition of
into the Belgrade a new hospital is
area. also driving these
upgrades.
Overloaded under
Re-conductor a
single element
Line work portion of 34.5 kV Proposed
contingency 2013
line Section 56.
conditions
25
25
25
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Overloaded under
Re-rate portions of
single element
Line work 34.5 kV line Proposed
contingency 2013
Section 13.
conditions
Re-rate 34.5 KV Overloaded under
overhead portion single element
Line Work of Section 38B Proposed
Waterville - contingency 2013
Winslow Area conditions
Reliability Bring the new line
Study Section 241 in/out
(Cont) of Rice Rips by
constructing 7
miles of new 115 Voltage and thermal
Rice Rips kV Transmission. violations under
2014 Proposed
Substation Also, upgrade contingent system
Rice Rips into a 4- conditions
breaker ring bus
with a second
115/34 kV
transformer.
26
26
26
LSP Projects
Projected Status
Project Major Project Needs
In-Service
Origin Project Description Assessment
Date
Bristol Upgrade Bristol
Substation T1
Overloaded under Planned
Bar Mills Upgrade Bar Mills
normal operating 2012
Substation T4
conditions
South China Upgrade South
Substation China T1
Maintenance - These 34.5 kV line
Reliability sections are in very
Inspection Rebuild Sections;
Line work poor condition and 2013 Planned
5A, 48, 172, 187
need to be rebuilt to
improve reliability.
Move Section 40 CMP Facilities at the
termination to Fort Halifax
Vassalboro Vassalboro. Move Substation are being
2012 Under Construction
Substation two 34.5 kV retired and moved to
breakers to the Vassalboro
Vassalboro. Substation
27
27
27
LSP Generation Projects
28
28
28
LSP Generation Projects
29
29
29
LSP Generation Projects
30
30
30
LSP Generation Projects
31
31
31
In-Service LSP Projects
32
32
32
In-Service LSP Generation
Projects
Generator Projected In-
Project Description Status Current Progress
ID Service Date
33
33
33
LSP Future Studies
Projected
Study Study Status Needs Assessment Solutions
Date
Portland North Area Re-affirm timing and need of Re-assessing transmission
Reliability Study Dec 2010 In Review projects from the original study. and NTA requirements
Lakes Region Area Contingency processor showed Conduct area reliability study
Reliability Study 2011 In Progress thermal and voltage violations and assess possible system
under single element contingencies upgrades
34
34
34
Augusta Area
Go Back to Augusta
Rice Rips
Go Back to Winslow
Winslow
Vassalboro
North Belgrade
Sidney
Augusta Section XX
McCoy's S. China
115/34 kV
Hospital
Section 38
D4 Blair Rd
115/12 kV
D3 Bond Brook
Section 38B
D2
Section 1
D1
Augusta
115/34 kV Augusta K5 East Side
Puddledock Maxcys
Section 39B
Road Section 39C
Section 33
Section 14
Section 39 115/34 kV
Section 19
Section 213
Winthrop
115/34 kV Section 88
Capital St (Upgrade)
Section 2
Manchester
Cony Rd 345/115 kV
115/34 kV
Coopers Mills
115/34 kV
Gulf Island (Maxcys) 35
Section 60 PTF Upgrades
Bowman
Street 35 Non-PTF Upgrades
35
Skowhegan Area
Go Back
Wyman Hydro
Williams Sect. 66
Hydro
Sect. 63A
Sect. 83
Lakewood Detroit
Sect. 241
Sect. 63
Sect. 79
Sappi
Sect. 15 Sect. 73 Skowhegan N. Somerset
Sect. 44
Rice Rips
Anson Weston
Harmony
Madison New Non-PTF
Electric Skowhegan S.
New PTF
Works North Anson
Norridgewock Sect. 9
Heywood New Construction
Sturtevant Re-rate
Shawmut
Re-Conductor
36
36
36
Portland North Area
Go Back Surowiec
Raymond Gray
North Gorham
North Freeport
Hydro
Yarmouth
S/S
10.8 MVAR 5.4 MVAR
Sect. 103
Sect. 102
Sect. 180A
10.8 MVAR
East Deering
10.8 MVAR
Brighton Ave.
12-kV
Sect. 188
Blue Rock Quarry
Moshers
Spring Street 34.5
12-kV
New Non-PTF
New PTF
New Construction
Spring Street 115 37
Re-rate
37 Re-Conductor
Westbrook Pleasant Hill
37
Waterville/Winslow Area
Go Back Wyman Hydro Detroit
Maxcys
Heywood Bowman St. Mason
Se
Sect. 83
Sect. 241
Road c t. 6
(future)
Sect. 67A Sect. 67 0
Sect. 68
Sect. 242
Sect. 241
Sect. 80
Highland Sect. 84 Sect. 88
Winslow Augusta
East Side
Rice Rips
115/34 kV
20/37 MVA
Sect. 47
Sect. 56
Sect. 71
Sect. 1
Sect. 10
Sect. 56A
Sect. 38
Sect. 38A
West Fairfield
Keyes Fiber
Waterville
Augusta East Hydro
Oakland Kennebec
Side
Sect. 38 Shawmut
Sydney
New Non-PTF
South New PTF
Waterville
New Construction 38
Sect. 13 Sect. 40 Re-rate
38 Re-Conductor
Vassalboro Fort Halifax
38
Lakes Region Area
Go Back Saco Valley
Kimball Rd
Section 214 Section 214
T1
20/37
Lovell Section 94 MVA
T1
20/37
5.4 MVAR
MVA
Hiram
Section 170
5.4 MVAR
Baldwin
N. Windham
2 x 5.4 MVAR
Section 103
Fort Hill Swett Rd
Section YY
Moshers
Section 187
Topsham 115 kV
Mason
Section 62
Gulf Island
Bath
Crowleys
115/34 kV
Section 72 Sabattus
Hardings
Section 11
Section 76
Mason
Pejepscot Cooks Corner Woolwich
Lisbon Section 55
Section 43
Brunswick
West Side
Topsham Old
Brunswick
Hydro
PTF Upgrades 40
Non-PTF Upgrades
40
40
CMP’s 14 Local Planning Areas
Go Back
41
41
41