JOB SAFETY ANALYSIS
WORK ACTIVITY (JOB) TITLE: WELDING H-BEAM & COLUMN Date Submission:
JSA PREPARED BY: REVIEWED BY: ACCEPTED BY:
DANNY SANTOSO RIFQI RAZAQI RAJAB
CONSTRUCTION SUPERVISOR HSE IKM HSE - MK (PROSYS)
REQUIRED SAFETY EQUIPMENT
LANGKAH KERJA POTENSI BAHAYA PENGENDALIAN BAHAYA PIC
Hard Hats Respirator/ Dust Safety Harness Hearing Protection Tools Lanyard Other
Safety Shoes mask Safety Gloves( electrical Gloves ) Barricades PSV (List):___________________________
Safety Glasses Electrical Stick Dosimeter Gás Detector _______________________________
Goggles Life Vest / PFD Flame Resistant Clothing Life Line / Yoyo _______________________________
Face Shield Blower Fire Extinguisher Radio ____________________________
Chemicals suit SCBA - EEBA Spill Kit / SOPEP Extraction Device
APPLICABLE SAFE WORK PRACTICES/SPECIAL PRECAUTIONS
PTW - (CS/HOT/COLD/ CREATED TBT – STARRT Card Ground Scan (underground utilities) WASTE and SPILL Measurement
OPENING / EXCAVATE) Drop Object -Created opening Safety Net – Catch Net Redundant Protection Measures
Energy Isolation / LOTO Checklist. Compressed Gas Cylinder / Toxic gas Control SIMOPS :
Written Procedure (MoS/ SOP) Confined Space Identification Commissioning authorization -Access Control Lighting / Illumination Plan
PSSR Doc /Line Checklist Emergency Rescue Plan Chemicals Handling (SDS DOC, etc ) other :
POTENTIAL HAZARDS
Lifting Hazards New Employees Elec. Shock/ Flash (includes utility lines) Dropped Objects Low Lighting Other : Chemical
Fall Potential Water/Drowning Hazard Haz. Chemical Exposure (N2, H2S,CO2 ) Tripping - Slipping Breathing Hazard spillage
Skin Irritants Mech. Equip. Hazards Sharp Edge, Hot - Cold surfaces Excavation Hazard Environmental Haz
Confined Spaces Fire/Explosion Potential Pinch/Crush/Striking Hazards Low Level hazard Ionizing Radiation
Elev. Load/Work Foreign Body in the eye Potential Release of Energy ( Mooring Fatigue/Biology Vehicle Operations
Heat stress High Noise Levels /tensioning sling / Pneumatic test) Hazard
LANGKAH KERJA POTENSI BAHAYA PENGENDALIAN BAHAYA PIC
PERSIAPAN PENGELASAN 1. TANGAN TERJEPIT a. MEMERIKSA PERALATAN DAN MESIN LAS DALAM SUPERVISOR
2. TERGORES MATERIAL KONDISI YANG BAIK CONSTRUCTION
b. MENGGUNAKAN APD DASAR LENGKAP (HELM,SARUNG PEKERJA
TANGAN,BAJU LENGAN PANJANG DAN SEPATU HSE
SAFETY)
c. MENGGUNAKAN APD TAMBAHAN (FULL BODY
HARNESS)
d. MEMBERSIHKAN AREA KERJA DARI MATERIAL YANG
MUDAH TERBAKAR
e. MEMERIKSA PERANCAH DALAM KONIDISI PERANCAH
SEBELUM PEKERJA NAIK
PENGELASAN 1. TERJATUH a. MENYIAPKAN APAR DISEKITAR AREA PENGELASAN SUPERVISOR
2. TERPELESET b. MENYIAPKAN COVER FIRE BLANKET AGAR SPARK CONSTRUCTION
3. KEBAKARAN (BUNGA API) TIDAK JATUH KEBAWAH PEKERJA
4. (SPARK) BUNGA API c. MEMBERIKAN SIGN (TANDA) PENGELASAN SEDANG HSE
MENGENAI PEKERJA BERLANGSUNG
5. TERTIMPA MATERIAL d. PEKERJA WAJIB MENGGUNAKAN FULL BODY HARNESS
DENGAN 2 LANYARD
e. PEKERJA WAJIB MENGGANTUNGKAN KEDUA HOOK
PADA ANCHOR POINT
f. MENGGUNAKAN APD TAMBAHAN (SARUNG TANGAN
LAS & KEDOK LAS)
g. MENEMPATKAN 1 HELPER / FIRE WATCHER DISEKITAR
AREA WELDING
SELESAI PENGELASAN 1. TERPELESET a. MELAKUKAN HOUSEKEEPING / PEMBERSIHAN AREA SUPERVISOR
2. TERJATUH KERJA SETELAH SELESAI PENGELASAN CONSTRUCTION
3. TERTIMPA MATERIAL b. MENURUNKAN MATERIAL DAN PERALATAN KELANTAI PEKERJA
DASAR HSE