Pile Installation Concept
Pile Installation Concept
P.J. Stins
Conceptual Design of a Pile Installation
Frame with Adjustable Footprint
by
P.J. Stins
Master of Science
in
to obtain the degree of Master of Science at the Delft University of Technology, to be defended publicly on
Wednesday December 19, 2018 at 10:30 AM.
The New York Times, September 2017: "Caribbean Devastated as Irma Heads Toward Florida"[11]. Irma is
one of the most powerful ocean hurricanes ever recorded. This is one of the consequences of the widely
discussed "Global Warming".
Since this century, global warming is accepted as a major problem and gradually governments work on solu-
tions to restrain this. Finally, the whole world faces the problem and made commitments about the emissions
during the Paris Climate Conference (COP21) in December 2015. The agreement with 195 countries sets out
a plan to reduce the global warming below 2°C [5]. A couple of solutions are possible, reduce the energy con-
sumption and/ or generate energy by sustainable methods. To achieve the commitments most governments
increases the investments in sustainable energy, what induces an up-trend, which is also noticeable in the
offshore wind industry.
Seaway Heavy Lifting participate in the offshore wind industry with their installation services. Thanks to this
company I got the chance to do my master thesis project related to the renewable industry, and contribute
on small scale to the reduction of the greenhouse gases. In combination with my passion for heavy steel
structures, the topic about the pile installation frame was a nice opportunity.
Thanks to the helpful people in the office, I was able to solve all kind of challenges and questions. In par-
ticular, I want to thank Amin Shahbazkhani, which was always willing to discuss about solutions and the
interpretation of the results during the project. Thereby, I also want to thanks Shafiek Suliman and Pellegrino
Guerriero for the support with the software SACS.
Especially, I would like to thank Peter Meijers who had the role of university supervisor. During the whole
project I faced various difficulties, which I could talk through and finally makes more easy with his help.
Thereby, I would like to express my acknowledgement towards my committee members, ir. P.G.F. Sliggers,
(and once again) ir. P.C. Meijers and ir. A. Shahbazkhani, for their guidance and support.
P.J. Stins
Zoetermeer, December 2018
III
Table of Contents
Summary VII
1 Introduction 1
2 Background: Current Pile Installation Frame 3
2.1 Design of the Current PIF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.2 Procedure to Install the Piles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3 Design Requirements and Criteria 7
3.1 List of Requirements and Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3.2 Requirements in Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3.3 Criteria in Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
4 Design Concept Generation 11
4.1 Install Piles at Different Footprints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
4.2 Adjustable PIF Conceptual Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4.2.1 Concepts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4.2.2 Trade-off . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.3 Modification of Sleeve Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4.4 Center Base Frame with Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4.5 Material and Profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
4.6 Conclusion and Recommendation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
5 Pile-Shims Force Calculation Model 21
5.1 Calculation Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
5.2 Model Representation of the Pile-Sleeve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
5.2.1 Free Body Diagram. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
5.2.2 Boundary and Interface Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
5.3 Theoretical Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
5.3.1 Bending Theory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
5.3.2 Environmental Load Theory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
5.3.3 Selection of the Model Wave Theory . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
5.3.4 Airy (Classic) Wave Theory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
5.3.5 Current Profile Approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
5.4 Displacement: due to Gap between Pile and Shims . . . . . . . . . . . . . . . . . . . . . . . . 31
5.5 Displacement and Reaction Forces due to: Environmental Load . . . . . . . . . . . . . . . . . 32
5.5.1 Integration of Environmental Load over the Pile . . . . . . . . . . . . . . . . . . . . . . 32
5.5.2 Maximum Environmental Load in in Time and Space . . . . . . . . . . . . . . . . . . . 34
5.6 Displacement and Reaction Forces: due Second Order Effects . . . . . . . . . . . . . . . . . . 35
5.6.1 Hammer Weight on the Pile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
5.6.2 Self-Weight of the Pile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
5.6.3 Equations for Bending due to Hammer Weight and Self-Weight of the Pile. . . . . . . . . 38
5.7 Reaction Forces: Pile Two, Three and Four . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
5.8 Model Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
5.8.1 Individual Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
5.8.2 Environmental Load through Time . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
5.8.3 Comparison Calculation of Second order Bending Effect with Currently used Method . . . 42
5.9 Model Conclusion/ Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
V
VI Table of Contents
6 Structural Integrity 45
6.1 Design Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
6.1.1 Operational Load Scenarios . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
6.1.2 Conditions for the In-Place Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
6.1.3 Load Combinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
6.2 Results of Shims-Force Calculation Model for the Governing Load Combinations . . . . . . . . 49
6.3 SACS Model of the Adjustable PIF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
6.4 Ratio between Applied and Allowable Stress of Members . . . . . . . . . . . . . . . . . . . . . 51
6.5 Sleeve Integrity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
6.6 Deflection of the PIF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
6.7 Conclusions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
7 Influence of Variations in Design Conditions 57
7.1 Influence of Piles and Hammer on Forces in the Members . . . . . . . . . . . . . . . . . . . . 57
7.2 Environmental Conditions Influences . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
7.2.1 Water Depth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
7.2.2 Current Velocity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
7.2.3 Soil Stiffness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
7.3 Pile Design Influence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
7.3.1 Length . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
7.3.2 Diameter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
7.3.3 D/t Ratio . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
7.3.4 Hammer Weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
8 Conclusions and Recommendations 65
8.1 Conclusions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
8.2 Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
A Appendix 67
A.1 Adjustable PIF with Maximum Footprint on Deck of the Vessels . . . . . . . . . . . . . . . . . 67
A.2 Drag and Inertia Constants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
A.3 Profile of Wave Velocity and Acceleration over the Water Depth . . . . . . . . . . . . . . . . . . 68
A.4 Reference Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
A.5 Shear Forces and Moments From Hammer on Top of Pile . . . . . . . . . . . . . . . . . . . . . 70
A.6 SACS Model Exposed to Individual Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
A.7 Second Order Calculation Method of Current PIF . . . . . . . . . . . . . . . . . . . . . . . . . 72
A.8 On-bottom Stability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
A.9 Equipment Load on Adjustable PIF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
A.10 Detailed Unity Check Calculation by Hand . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
A.11 Detailed Unity Check Results From SACS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Bibliography 89
Glossary 91
Summary
An offshore wind turbine is placed on a so called “foundation” to gain height above the sea surface level. One
of the used foundations is the jacket structure, which is kept in place by pre-piled supports. The piles are
hammered into the seabed first, after which the jacket legs are stabbed into the piles. A template is used to
guide the piles during installation and to secure the relative distances as well as the straightness and depth of
the piles with respect to each other. This template is called the Pile Installation Frame (PIF).
Seaway Heavy Lifting has designed a PIF with a fixed footprint for the Beatrice offshore wind farm project.
However, there is a need to make the PIF adjustable in order to use it in different situations (e.g. environ-
mental conditions, pile designs and jacket configurations). Therefore, this thesis investigates the following
two questions: “How can the current PIF be altered in order to make the footprint adjustable for various
footprints?”, and: “What are the influences of variations in pile designs and conditions?”.
A trade-off method is used to find the most feasible conceptual design. Resulted in interchangeable frames
connected between the original pile supports and the center base frame (with equipment and a lifting point).
The integrity of the concept is checked for one of the operational scenarios, namely, “the in-place scenario”,
i.e., the PIF is at the seabed and the piles are stabbed into the sleeves with a hydraulic hammer on top of one
of the piles.
A model of the concept design is made with the structural simulation software SACS, that does not account
for the second order bending effect of the pile. Therefore, a new calculation model is developed. This model
calculates the reaction forces from the piles onto the PIF, and it is based on the linear wave theory, a linearised
approached current profile, and the Morrison equation. The bending of the pile is computed using the Euler-
Bernoulli beam theory, which is iteratively solved to take into account the second order bending effect.
The PIF is checked for the minimum square footprint of 20 m, 24 m and the maximum of 32 m for a rep-
resentative reference condition (Beatrice offshore wind farm). From the check, the maximum stress level in
the members and braces is below half of the maximum allowable stress. Furthermore, the deformations at
the pile supports in the sleeve are in the same order of magnitude than the current PIF. Hence, these are not
critical for the installation tolerances in the same conditions.
To show the influences of the variations per project in pile design and conditions, an analysis is executed.
From the analysis, it is concluded that the forces on the frame are maximum when the hammer is at the
seawater level. Moreover, a pile diameter of 2.2 meter is the optimum for the reference condition. It is also
observed that, the influence of the pile thickness is not considerable with respect to the forces onto the frame.
The forces in the members and braces of the frame are mainly caused by the pile reaction forces transferred
to the PIF. Therefore, the calculation model can be used for a first estimation of the PIF integrity. When the
reaction forces are lower than for the reference conditions, the PIF can be used; when they are higher, an
additional analysis with SACS is required.
VII
1
Introduction
Seaway Heavy Lifting (SHL) is an offshore contractor in the Oil & Gas and Renewable Industry and operate
through the whole world. The company offers Transport and Installation solutions (T&I) as well as Engi-
neering, Procurement, Construction and Installation solutions (EPCI). Two monohull crane vessels, Stanislav
Yudin and Oleg Strashnov, are in full ownership of SHL. These vessels have significant lift capacities of maxi-
mum 2,500 and 5,000 tonnes and are well known for the exceptional working characteristics. Seaway Heavy
Lifting owns all kinds of support equipment like: rigging, hammers, pile handling- and pile installation tools.
The support structure of an offshore wind turbine, like the word says, supports the wind turbine to gain
enough height above the sea surface level. Currently, the following support structures are applied (installed
share): Monopile (80.8%), Gravity (7.5%), Jacket (6.6%), Tripod (3.2%), Tripile (1.9%), Floating (0.02%)[8]. The
monopile is the most applied substructure. The new offshore wind farm projects moves to deeper waters and
further offshore, leading to larger wind turbines, therefore jacket substructures become more popular.
A jacket structure is kept in place at the seabed by piled foundations. The installation of the piles depends
on the design of the jacket, for some jacket installations the piles are installed first after which the jacket legs
are stabbed in the piles, also called pre-pile installation (A sketch of a pre-pile jacket stabbed into the piles
is given in figure 1.1).For the installation of the piles a template is used to secure the distances as well as the
straightness and depth of the piles into the soil. This template, named the Pile Installation Frame (PIF) is the
topic of this Master Thesis.
1
2 1. Introduction
Figure 1.2: Pile installation frame for Beatrice OWF (with worker mid-right)
Seaway Heavy Lifting has designed the current PIF (figure: 1.2) specially for the Beatrice offshore wind farm
(OWF) project, located at the coast of Scotland in the Northern North Sea. This PIF is more than 30 meters
height, which equals approximately 17 full grown people on top of each other. The Beatrice wind farm in-
cludes 84 turbines of 7 MW and two substations, both with pre-piled jacket structures. These turbines will
provide energy equivalent to the needs of roughly 450,000 homes [3], and covers an area comparable to 26,000
football fields, in water depths from 35 meter up to 55 meter [1]. The responsibility of Seaway Heavy Lifting
for this project, was the installation of the pile foundations and the jacket structures.
Because of a relatively short design period, SHL decided to make a fixed framing, which makes the PIF suitable
for only the particular footprint of 24 meter center to center. Since the project is finished SHL wants to use
the PIF for future projects in different situations.
Therefore, this thesis investigates the following two questions:
"How can the current PIF be altered in order to make the footprint adjustable for various footprints?",
and:
"What are the influences of the variations in pile designs and conditions?".
In order to answer these questions, the structure of the report is as follows, with the relations between the
chapters given in figure 1.3. Firstly, in chapter (2), a brief background of the current PIF is given with the
operational procedure. In chapter 3 the design requirements and criteria are given. Chapter 4 answers the
question: "What conceptual design is most feasible to work out further". Followed by chapter 5, where the
description of the developed model is given, to calculate the forces from the piles onto the PIF. In the subse-
quent chapter 6, the question is answered: "Is the conceptual resistant to the reference conditions, and does
it satisfy all the requirements?". Chapter 7 contains an analyses, about the influence of the variations in pile
designs and conditions. The report ends with the conclusions and recommendations in chapter 8.
In this chapter, a background is given of the current Pile Installation Frame (PIF) design and about the oper-
ational procedure.
3
4 2. Background: Current Pile Installation Frame
The lower part of the sleeve with the mudmat and hydraulic cylinders, are shown in figure 2.2b. The mudmat
is connected to the sleeve with three hydraulic cylinders. These cylinders can be extended to push the sleeves
upwards. By extending the individual sleeves and measuring the inclination, the PIF can be levelled straight.
The shims are located at the bottom and the top of the sleeve as indicated in figure 2.2a. These can be ex-
tended hydraulically to center the pile in the middle of the sleeve (see top view figure 2.2c). The shims can
also be retracted, to be able to go into the sleeves with a wider hammer. This is nesceserry to reach the target
penetration of the pile. In other words, the piles should be penetrated into the soil further than the top shims.
Figure 2.2: Sleeve (yellow) with mudmat (green) shims (grey) and hydraulic levelling cylinders (red)
2.2. Procedure to Install the Piles 5
Figure 2.4: Current PIF on deck of with ILT in slings of the crane
3
Design Requirements and Criteria
In the total organisation of an offshore wind farm design, a lot of parties are involved. These all have require-
ments and criteria that should be met for any particular part of the design and/ or installation process. In this
chapter these requirements and criteria are listed and explained.
A distinction is made, between design requirements and criteria. The definition of design requirements:
"state the important characteristics that your design must meet in order to be successful" [4], these are the
characteristics which are measurable and should be checked. The unmeasurable characteristics to meet, are
classified by the criteria.
First, the list of requirements and criteria are presented. Then, these are discussed in more detail.
7
8 3. Design Requirements and Criteria
Description Tolerances
Centre pile to centre pile +/- 100 mm
Absolute vertical position w.r.t. target elevation +/- 100 mm
Relative pile top height between lowest and highest pile 100 mm
Final inclination w.r.t. vertical 0.5°
Figure 3.1: Drawing of the square footprint with the pile installation tolerances (dimensions in mm)
2. The frame should be adjustable to an three and four leg footprint configurations with an center to center
distance varying from 20 meter to 32 meter.
The configuration of the PIF is depended on the footprint of the foundation structure design. These foot-
prints variates per location and sometimes even within one project. Based on the prospectives and cur-
rent project request for pile installation projects, the minimum and maximum variations are set for both
an three legged as an four legged footprint.
3. The integrity of the PIF against the environmental conditions should be higher than the maximum opera-
ble sea states of the Stanislav Yudin
Seaway Heavy Lifting wants to install the piles with theirs own heavy lift vessel, the Stanislav Yudin, at all
potential wind farm locations. Since every location has different environmental conditions, the operability
of the Stanislav Yudin is taken as the limiting factor. The limiting sea states are from a dynamic analysis,
with ANSYS simulation software. This is executed by the naval engineering department, for the current
PIF. The maximum operable sea states are given in table 3.2, together with the survival condition.
Seaway Heavy lifting wants to be able to leave the PIF at the seabed in any unexpected or emergency
situation. For instance, the environmental conditions are worse than was predicted. For this, Seaway
Heavy Lifting has a general assumption of the maximum survival sea state.
According to the ISO Code [2], the maximum wave height can be calculated from the significant wave
height: Hmax = 1.87 · H s .
3.2. Requirements in Detail 9
Table 3.2: Maximum operational and survival wave conditions for the Stanislav Yudin with the current PIF
Operational Survival
tp (s) 4 5 6 7 8 9 10 11 8.2
Hs (m) 1.11 1.8 2.43 1.89 1.13 0.7 0.52 0.45 3.50
Hmax (m) 2.08 3.37 4.54 3.53 2.11 1.31 0.97 0.84 6.50
4. The maximum weight of the design should not reach the maximum lifting capacities of the heavy lift ves-
sels.
The installation of the piles should be done with the heavy lift vessels of Seaway Heavy Lifting. Therefore,
the lifting capacities should not be exceeded. The lifting capacities depends on the distance the crane has
to reach to the side of the vessel. The limiting load capacities are given in figure 3.2.
Figure 3.2: Load capacity over the distance from the center of rotation of the crane for both HLVs
This chapter covers the generation of the conceptual design for a PIF with an adjustable footprint. The con-
cept generation process, answers the question as stated in the introduction: "How can the current PIF be
altered in order to make the footprint adjustable for various footprints?".
First, is explained way a frame is needed, followed by a trade off between different concepts to adjust the
PIF. Then an explanation is given, how the sleeve connections with the frame should be modified. Next,
the material and profiles are defined. And concluded, the configuration is given of the concept design with
adjustable footprint.
11
12 4. Design Concept Generation
4.2.1. Concepts
Four concepts are introduced and sketched in the figures. Figure 4.2 shows the meaning of the sketched
figures.
The sleeve, ILT-bucket and equipment are introduced in section 2.1. With base frame is meant, the frame
that is the basis of the adjustable PIF, this part is used for all footprints without modifications. The extension
frames are the frames that can be adjusted.
Concept a: Star-Frame
The star frame concept (figures 4.3 & 4.4) can be used for a three and four legged footprint using the same
base frame.
The operation to adjust the footprint exist of: loosen the connections of the extension pieces, loosen the
connections of the hoses and cables, lift the extension pieces, lift the sleeves at the right distances with respect
to each other, lift the different extension pieces between the base frame and the sleeves, connect the extension
pieces. And, re-connect the hoses and cables from the base frame to the sleeves.
Figure 4.5: Slide-frame square Figure 4.6: Slide-frame square for three piles Figure 4.7: Slide-frame triangular
Concept d: O-Frame
The O-Frame concept (figures 4.10 & 4.11) contains four/ three extension frames, that connect the sleeves to
each other.
The operation to adjust the footprint, is similar to the star frame. The main difference for this concept is the
ILT-bucket, which is pre-rigged with slings to the frame. This results in an additional operation. Namely, the
ILT-bucket should be placed in upwards position, to be able to put the internal lifting tool into it. Upward
positioning can be done for instance at the seabed or at the frame.
4.2.2. Trade-off
The selection of the concept is done according to a trade-off. The concepts are evaluated by rating on four
sub-categories: operational, structural, technical and commercial. The commercial subcategory is divided
into: operational costs (OPEX), initial costs CAPEX and maintenance costs. The ratings are shown in table
4.1, the higher the number the better the appreciation. Explanation of the ratings are given below.
Operational/OPEX:
Concept b. can be adjusted within the least time, since no lifting is required. The sleeve only need to be
unlocked, slid to the right position, and locked again. With the other concepts, the connections should be
loosened, and multiple lifting operations are required to adjust the footprint. Concept d. is lifted with a
pre-rigged ILT-bucket, which makes the installation procedure of the piles relatively time consuming, and
therefore the operational costs higher.
Structural/CAPEX:
For concept c. and d. the existing sleeve needs the least modifications, since the tubular members are con-
nected at the same positions. Therefore, it needs less investment costs. The design of the slide frame contains
no extension pieces.
Technical/CAPEX:
The slide frame is the most sophisticated method to adjust the footprint. This concept requires a the sliding
system, resulting in relatively high initial costs.
Maintenance: Concept b. requires more maintenance due to the existence of the sleeve sliding system. For
the other three concepts the same inspection and maintenance procedures are assumed.
Concept c. the OX-frame has the lowest initial costs, since the least modifications to the current PIF are
needed. Since offshore operational costs are relatively expensive, concept b the slide frame, becomes more
interesting when the PIF will be adjusted more often. For this thesis concept c. is worked out further.
4.3. Modification of Sleeve Connection 17
⇒
Figure 4.12: Cut lines current PIF Figure 4.13: Cut sleeve with connected members
(a) concept minimum footprint: 20x20 meter (b) concept maximum footprint 32x32 meter
Figure 4.15: Sketches of adjustable frame in minimum and maximum square footprint configuration
5
Pile-Shims Force Calculation Model
In this chapter, the model is described to calculate the reaction forces from the piles onto the shims in the
sleeve. This new model is introduced for three reasons. Firstly, the structural simulation software SACS is not
capable of taking the second order bending effects into account. Secondly, the pile bending due to the envi-
ronmental forces is calculated directly within the model, so no additional calculation with SACS is needed.
Thirdly, for the current PIF a calculation method was used with rough approximations.
In the subsequent sections, first the calculation procedure is explained, followed by the representation of the
model, and the theoretical framework. Then and the individual calculation steps are explained. Concluded
by a verification of the model and a conclusion and discussion.
21
22 5. Pile-Shims Force Calculation Model
Figure 5.2: Free body diagram pile - sleeve Figure 5.3: Section view: sleeve, pile, hammer
24 5. Pile-Shims Force Calculation Model
S A1 = S A1−ham = (S 1 ) (5.1)
M A1 = M A1−ham = (M 1 ) (5.2)
S A2 − S B 2 = R 2 (5.3)
M A2 = M B 2 = (M 2 ) (5.4)
ϕ A2 = ϕB 2 (5.5)
v A2 = v B 2 = 0 (5.6)
S B 3 − SC 3 = R3 (5.7)
M B 3 = MC 3 = (M 3 ) (5.8)
ϕB 3 = ϕC 3 (5.9)
v B 3 = vC 3 = 0 (5.10)
SC 4 − k · VC 4 = R 4 (5.11)
MC 4 = 0 (5.12)
R4
vC 4 = (5.13)
k Figure 5.4: Internal force/ moment equilibrium at nodes
5.3. Theoretical Framework 25
d2 d 2v d 4v
µ ¶
EI =q with E I (z) constant gives: E I =q [N /m] (5.14)
d z2 d z2 d z4
In which v(z) is the deflection of the beam in the x-direction at position z, q is a distributed load, E is the
elastic modulus and I is the second moment of area of the cross section of the pile.
By integration of the distributed force on the pile over z, the shear force is calculated (S), followed by double
integration to find the bending moment (M ), triple integration gives the rotation (ϕ) and with four times
integration the deflection v is found.
Performing these integration steps for the loads on pile section A:
d 4v
Z Z
−S A =E I d z = qd z [N ] (5.15)
d z4
Ï 4
d v 2 d 2v
Z
−M A =E I d z = −Sd z = E I · [N m] (5.16)
d z4 d z2
Ñ 4
d v 3 dv
Z
ϕ A · E I =E I d z = −Md z = E I · [r ad ] (5.17)
d z4 dz
ZZZZ 4
d v 4
Z
v A · E I =E I d z = ϕd z [m] (5.18)
d z4
For pile section B the internal moment expression is generated, and differentiated to find the shear force.
Followed by two times integration of the internal moment expression to find the bending. This gives the
following equations for section B :
M2 M3
−S B = − + (5.19)
LB LB
M2 M3 M2 zB M3 zB
−M B = (L B − z B ) + zB = M2 − + (5.20)
LC LB LB LB
2 2
1 M2 zB 1 M3 zB
ϕB · E I = M 2 z B − + +C 3 (5.21)
2 LB 2 LB
3 3
1 1 M2 zB 1 M3 zB
v B · E I = M 2 z B2 − + +C 3 z B +C 4 (5.22)
2 6 LB 6 LB
Every integration step, gives a constant. These constants can be solved with the boundary and interface
conditions, given in subsection 5.2.2.
Calculation of the constant C 4 by submitting interface condition 5.6 into equation 5.22:
vB 2 = 0 → C4 = 0 (5.23)
Calculation of the constant C 3 by submitting interface condition 5.10 into equation 5.22:
1 1
vB 3 = 0 → C 3 = − M2 L B − M3 L B (5.24)
3 6
26 5. Pile-Shims Force Calculation Model
The internal moment expression for section C is generated, and differentiated to find the shear force. Fol-
lowed by two times integration of the internal moment expression to find the bending. This gives the general
equations for section C :
M3
−SC = − (5.25)
LC
M3 M 3 zC
−MC = (LC − zC ) = M 3 − (5.26)
LC LC
2
1 M 3 zC
ϕC · E I = M 3 zC − +C 5 (5.27)
2 LC
3
1 1 M 3 zC
vC · E I = M 3 zC2 − +C 5 zC +C 6 (5.28)
2 6 LC
Calculation of the constant C 6 by submitting interface condition 5.10 into equation 5.28:
vC 3 = 0 → C6 = 0 (5.29)
1 1
ϕB 3 = ϕC 3 → C 5 = M2 L B + M3 (5.30)
6 3
−E I − 31 kLC3 − 31 kLC2 L B
v4 = 1
(5.31)
6 M2 L B LC
M 3 = kv 4 LC (5.32)
By knowing M 3 , the constants and the expressions for all pile sections can be solved for a load onto pile
section A.
5.3. Theoretical Framework 27
π 1
F M (x, z, t ) = C m ρ f D 2 a w +C D ρ f D(u w + u c )|u w + u c | (per meter lenght) (5.33)
| 4
{z } | 2 {z }
I ner t i a Dr ag
With C m is the inertia constant; C D the drag constant; a w the wave acceleration (equation 5.35); u w the wave
velocity (equation 5.34); u c the current velocity (equation 5.37); D the diameter.
The empirical inertia and drag constants from the ISO code for different diameter piles are shown in appendix
A.2.
Figure 5.5: Dean graph for the maximum operable wave conditions
From this graph is concluded, that the most relevant wave conditions requires the Stokes fifth order wave
theory. The Stokes fifth order wave theory is complicated to include in the model. Therefore, is checked
whether it is valid to use an other theory. This is done by comparing the differences between the classic airy
wave theory, the airy wave theory and the Stokes fifth order wave theory (for the reference conditions).
28 5. Pile-Shims Force Calculation Model
The simulation software SACS is used to compare the different wave theories. This program is an offshore
structure analysis and design software, based on international design codes, and is able to predict offshore
structural performance within environmental conditions. A SACS model similar to the new generated model
is used to calculate the reaction forces these wave theories, see figure 5.6.
The results from the SACS model are shown in figure 5.7.
Figure 5.7: Comparison wave theories with SACS for one wave cycle
From this graph is concluded, that the airy Classic theory is a little out of phase, though the maximum reaction
force in the same order as the other theories. The Stokes theory and airy theory are almost similar. Calculated
845.5 − 853.5
for the maximum reaction force, the difference is less then one percent, namely: < 1%.
853.5
In conclusion, the maximum reaction force of the top shim are in the same order for the mentioned theories.
The results of the airy wave theory 5th order theory are similar, therefore it is valid to use the airy wave theory.
5.3. Theoretical Framework 29
cosh (k (d − z))
u w (x, z, t ) = sin (ωt − kx) · ωa (5.34)
sinh (kd )
d u w (x, z, t ) cosh (k (d − z))
a w (x, z, t ) = = cos (ωt − kx) · ω2 a (5.35)
dt sinh (kd )
2π
With k the wave number (equation 5.36), ω angular speed related to the peak period ω = tp , a the wave
amplitude, d the water depth and z the distance with respect to the mean sea water level.
These formulas are applicable for all water depths. The wave particle accelerations are 90 degree out of phase
with the particle velocities. Due to pile bending and tilt, the pile is not exactly eccentric. This eccentricity
is small, therefore the calculation of the wave motions is based on the assumption that the pile is exactly
straight. In other words, the whole pile over the depth is at x = 0.
The distributions of the wave velocity and acceleration over the water depth are shown in figure 5.8a and 5.8b.
Figure 5.8: Profile of wave velocity and acceleration over the water depth z
The figures shows, that the maximum velocity and accelerations are at the mean sea water level (MSL).
The difference between the classic airy wave theory and airy wave theory, are the boundary conditions at the
water surface. The classic airy wave theory is calculated up to the mean sea water level (z = 0). And the airy
wave theory up to the water surface (z = η with η(x, t ) = a sin(ωt − kx)).
The required wave number is calculated with the Eckhart method, and a refinement of Fenton [9]:
¢−2
α + β2 cosh β
¡
1
k≈ · with α = ω2 d /g and β = α tanh (α)−1/2 (5.36)
d tanh β + β cosh β −2
¡ ¢
30 5. Pile-Shims Force Calculation Model
¶1/7
d −z
µ
u c (z) = u c (0) (5.37)
d
The linearised approach is introduced, because various numerical calculation software programs (Maple,
Matlab, Wolfram Alpha, www.integral-calculator.com) were not able to find the integral of the Morrison equa-
tion with the power law. To simplify the equation, a linear approximation of the current velocity (u c ) is as-
sumed, according to the linear regression equation. The expression for the linear approximation is given in
equation 5.38. This method is based on a linear approximation of individual results, n times the power law is
calculated equally over the water depth at locations z.
With n is the number of calculations. Σ(z · u c ) is the summation of the z locations for which the power law
is calculated, multiplied by the result of the power law at that z locations (u c ). Σz 2 is the summation of
the square of the z locations for which the power law is calculated. Σz is the summation of the z locations for
which the power law is calculated. And Σu c is the summation of the results of the power law for all z locations,
for which the power law is calculated.
5.4. Displacement: due to Gap between Pile and Shims 31
2 · ∆g ap
µ ¶
θt i l t = arctan (5.39)
LB
µ ¶
1
v A1,t i l t = sin (θt i l t ) L A + L B (5.40)
2
The constants from the result of the integration are solved using the boundary and interface conditions of
subsection 5.3.1.
The reaction forces at the shims are:
The Morrison equation with the wave motions and current profile substituted gives:
cosh (k (d − z))
µ ¶
1
F M (z = η, t ) = C D Dρ f sin (ωt − kx) · ωa + ez + f (5.43)
2 sinh (d k)
¯ ¯
cosh (k (d − z))
· ¯¯sin (ωt − kx) · ωa
¯ ¯
+ ez + f ¯¯
sinh (d k)
π 2 cosh (k (d − z))
+ D ρ f C I cos (ωt − kx) · ω2 a (per meter lenght)
4 sinh (d k)
The unit of the Morrison equation is in force per meter length. So, this represents a distributed force over the
height for a particular diameter (q(z) = F M (z, t = t max ). As can be seen in figure 5.11 the pile and hammer
has different diameters. Therefore, the forces and moments of each diameter section should be calculated
individually. The calculation boundaries depends on the water level with respect to these sections.
The distributed force of the Morrison equation can be substituted into the Euler-Bernoulli equation to calcu-
late the shear forces, moments, angle and displacement of the pile (and hammer).
The method to calculate the shear forces and moments at the hammer is elaborated in the appendix section
A.5. The interface between the hammer and the pile is assumed to be a fixed connection, so the total shear
force and moment is transferred to the pile top, so : S A1 = −S H ,4 , and = M A1 = −M H ,4 . This is assumed,
because the hammer is heavy; the pile diameter wide; and the pile bending is small, therefore the hammer
will not rotate and shift with respect to the pile top.
The environmental load is from the water level (integration boundary a) until the top shim (node 2), (defined
in equation 5.47). Calculation of the environmental force on pile:
Z a
−S A = FM d z + S1 (5.44)
z2
Z a
−M A = −S A d z + M 1 (5.45)
z
Z 2a
ϕA · E I = −M A (5.46)
z2
With: (
z1 ifz 1 ≥ 0
a= (5.47)
0 if z 1 < 0
The deformation of the pile depends on the environmental force, so the deformation is up until water level. If
the pile top (z 1 ) is higher than the water level, the part of the pile above water level will have a constant angle
with respect to vertical. This is shown in equation 5.48 and 5.49
Z z1
vA ·EI = ϕA d z if z 1 ≥ 0 (5.48)
z2
(R z
z2
1
ϕA d z for z ≥ 0
vA ·EI = ifz 1 < 0 (5.49)
v a (z 1 ) + ϕA(0) · z 1 for z < 0
Substitution of these results into equations 5.19 until 5.32 to calculate the reaction forces at the shims with
equation 5.42 and the displacement of the pile top with equation 5.41.
34 5. Pile-Shims Force Calculation Model
d F x (z = 0, t )
=0 → t max (5.50)
dt
The derivative of the Morrison equation with help of numeric software is:
2
d F M (z = 0, t ) aDρ f ω cosh (k (d − z))
= (5.51)
dt 4 sinh (d k)
¯ aω cosh (l (d − z)) sin (kx − t ω)
µ ¯ ¯ ¶
· 4C D cos (kx − t ω) ¯ − ex − f ¯ + πC I Dω sin (kx − t ω)
¯
¯ ¯
sinh (d k)
In figure 5.12 the inertia part (F I ), the drag part(F d ) and the sum(F m ) of these forces are plotted for z = η, as
well as the derivative of the total force (d F m /d t ). As you can see the derivative has an abrupt change at t ≈ 4
seconds. This is because of the absolute velocity part in the Morrison equation.
The first set up of the model was according to the classic airy wave theory, where t max is calculated at z =
0. Since the model is extended to the airy wave theory , t max have to be found for z = η. η Is dependent on
time, so the first derivative of the Morrison equation will change, and therefore t max possibly changes. In the
model t max is still calculated for the classic airy wave theory. Therefore, the model additionally calculates the
summation of the force over the pile for t 99 = 0.99t max and t 101 = 1.01t max . If one of these gives a higher force
than t max , the time is manually tuned until the maximum force is found.
C2
v A1,2nd = (5.52)
−E I
The reaction forces at the shims are:
Input:
The initial displacement is the summation of the tilt (result of equation 5.40 and environmental load (result
of equation 5.41 on the pile:
v 0 = v A1,i ni t i al = v A1,env + v A1,t i l t (5.54)
In the subsequent subsections, the bending due to the hammer weight and self-weight of the pile is elabo-
rated.
Figure 5.13: Flowchart second order effect (part of flowchart: figure 5.1)
36 5. Pile-Shims Force Calculation Model
(a) Pile bending due to hammer weight (b) Bended pile due to loads
Figure 5.14: Profile of the maximum wave velocity and acceleration at moment of time over the water depth z
5.6. Displacement and Reaction Forces: due Second Order Effects 37
The bending moment into the pile between of section A (between node 1 and 2) due to the hammer weight
is:
1
M A = ρg Az A tan(θi )z A (5.58)
2
Differentiation with respect to z gives the shear force:
S A = ρg Az A tan(θi ) (5.59)
Figure 5.15: Profile of the maximum wave velocity and acceleration at moment of time over the water depth z
38 5. Pile-Shims Force Calculation Model
5.6.3. Equations for Bending due to Hammer Weight and Self-Weight of the Pile
Previous subsections showed how the shear forces and internal moments are determined. With the Euler-
Bernoulli theory, described in subsection 5.3.1, the angle and bending of the pile is calculated for a particular
angle θi . Because this angle is getting bigger due to the second order effect, this calculation steps are per-
formed multiple times.
The equations for pile section A in between node 1 and 2 are:
1
v A2 = 0 → C 2 = − S A1 L 3A −C 1 L A (5.64)
6
1 1 1
ϕ A2 = ϕB 2 → C 1 = − S A1 L 2A − M 2 L B − M 3 L B (5.65)
2 3 6
The displacement of the pile top (v 1 ) is found as follows: Substitution of L A into equation 5.61 for z A gives
the moment at node 2(M A2 = M 2 ). Followed by substitution of M 2 into equation 5.31, and substitute this into
equation 5.32 gives the moment at node 3 (M 3 ). By knowing M 2 and M 3 , the bending profile of pile section A
can be found with equation 5.63. For z A = 0, equation 5.63 gives v 1 .
Figure 5.17: Environmental conditions from eight directions spaced at 45° interval
Table 5.1: Distance with respect to pile one, aligned with the environmental load direction
When the piles are stabbed in the sleeves, the direction of the pile tilt due to the gaps is random. Assumed
is, that the tilt of pile one is in the same direction as the environmental load, while the initial tilt of the other
piles are in the contrary direction. With this assumption the compression force in the top member becomes
the highest, and the tension force in the bottom member the lowest, see figure 5.18.
Table 5.2: Comparison of the pile tip displacement calculation model with SACS model
From this, one can conclude, that the forces onto the shims due to the hammer and pile self-weight are the
same. The differences in bending due to the environmental forces are within one percent. This is assumed to
be acceptable.
* Note: The SACS model is also based on the Euler-Bernoulli theory and the Morrison equation.
Figure 5.19 shows the convergence of the pile tip displacement, by illustrating the difference between each
iteration. Clearly, the solution becomes stable after multiple iteration steps. From this is conclude, the whole
computation converges, including the bending moments.
Figure 5.20: Comparison classic airy wave theory with Model and SACS including current velocity for one wave cycle
Noticeable is the result from the model at approximately 2.5 s and 5 s. This offset of the calculation model
occurs when the particle velocity at the seawater level change signs. Since only the maximum force at t max =
0.66 seconds is used for the integrity check of the PIF, this offset does not influence the results.
Figure 5.21 shows the results of the airy wave theory for both models. The differences between the models
are the current stretching methods up to the water surface.
The calculation model contains the Wheeler stretching method; the power law current profile is stretched till
the water surface z = η, as shown in figure A.4. In the model the stretched current profile is linear approxi-
mated as shown in figure 5.9.
The SACS model contains approached power law as current profile over the water depth, as shown in figure
5.9. This current profile is stretched by the extrapolating stretching method; when the wave is above mean
sea water level (MSL), the current velocity is assumed constant, and below MSL the current velocity is cut off
until the surface, see figure A.3.
Figure 5.21: Comparison airy wave theory with Model and SACS including current velocity for one wave cycle
The airy wave theory contains the same offset as described preciously. The different stretching methods give
also differences in the results of the models. The calculation model has a lower maximum reaction force and
earlier in time. Since the velocities of the extrapolated method are higher for the maximum wave elevation,
also the maximum reaction forces are higher. These higher velocities also results in a more drag dominated
environmental force. Since the drag and inertia force components are 90 degree out of phase, the maximum
force is at an other moment in time.
42 5. Pile-Shims Force Calculation Model
5.8.3. Comparison Calculation of Second order Bending Effect with Currently used Method
The calculation model results of the second order bending effect are compared with the currently used method
by Seaway Heavy Lifting. The comparison is executed for the reference condition. In the tables 5.3 the differ-
ences of the reaction forces in the shims are shown. For two water depths with a single pile and a pile with
hammer on top. The free body diagram of the current calculation method is shown in figure 5.22.
The differences of the currently used method with the new calculation model are:
• An additional step is needed, the bending due to environmental load is extracted from a SACS model
• Assumed is that all six degrees of freedom are fixed half way of section b between node 2 and 3
• The bending of the pile beneath the upper shim is not taken into account
• The reaction moment (M r ) at the fixity, is equally divided over the upper and lower shims
The calculation method is explained in appendix A.7
Table 5.3: Reaction forces into the shims of the current method the new calculation model
Table 5.3 shows that the currently used model underestimate the reaction forces at the top shims (R 2 ) and
overestimate at the lower shims (R 3 ).
Figure 5.23: Pile sleeve representation Figure 5.24: Distributed load Figure 5.25: Shear force
44 5. Pile-Shims Force Calculation Model
Figure 5.26: Internal moment Figure 5.27: Rotation Figure 5.28: Deflection
6
Structural Integrity
In this chapter the structural integrity of the conceptual design is checked with the structural simulation soft-
ware SACS. The following questions are investigated: "Is the frame strong enough to withstand the external
loads", and: "What are the deflections of the PIF, and are these critical for the installation tolerances?", and
last: "Should the sleeve be rechecked for the adjustable PIF?".
First the design loads are introduced, followed by the load combinations, and how these are systematically
reduced to manageable numbers.
Figure 6.1: Environmental conditions from eight directions spaced at 45° interval
This section explains for what design conditions and combinations the integrity of the conceptual PIF is
checked. The new designed PIF should be capable to install piles at all conditions of planned offshore wind
farms. It is not possible to check the integrity for all conditions, therefore the representative reference condi-
tion is considered, which is given in the appendix section A.4.
45
46 6. Structural Integrity
The PIF should be able to placed on the seabed in any direction with respect to the waves and current. For
the integrity check eight directions with 45° interval are considered as depicted in figure 5.17. Assumed that
waves and currents are aligned.
6.1. Design Loads 47
According to the requirements nine maximum wave conditions should be considered, for both the maximum
and minimum water depth, in eight directions. According to the ISO code, all conditions should be checked
with additional action factors existing of three combinations, shown in table 6.2. Since the PIF is adjustable,
all possible footprints should be checked. Representative is to considerer three square footprints: the maxi-
mum and minimum required footprint, and the reference footprint to compare the results with the current
PIF.
Table 6.3: Partial action factors for calculating internal forces according to the ISO-code ([2])
The significant load combinations are found by using the pile-shims force calculation model. The results of
the model are representative for the whole PIF, since the main loads into the members of the PIF comes from
the pile-shims reaction forces. This is shown in section 7.1. The results of the individual load combinations
are compared for only the top shims, because the ratio between the top and bottom shims is constant (for the
reference conditions).
First, the reaction forces are calculated for the operable wave conditions, for both the maximum and mini-
mum water depth, including the reference current velocity and pile and hammer. The results of these calcu-
lations are shown in figure 6.2 without the ISO action factors.
Figure 6.2: Reaction force at top shims for the maximum operable waves
The maximum reaction forces are at a peak period (t p ) of 6 seconds with the maximum wave height of 4.54
m and the deepest water depth of 60.53 meters (blue circles). Though the survival condition is exposed to a
48 6. Structural Integrity
"rougher sea state" (h s = 3.5 m, t p = 8.2 s), the reactions forces are significantly lower. This is because of the
absence of the hammer on top of the pile.
Figure 6.3 shows the results of the different action factor at the maximum load combination of figure 6.2.
Clearly is noticed that action factor combination 2 (LC2) gives the highest reaction forces. This is because of
the following: The wave loads induces a bending of the pile; the higher the wave loads; the more bending; and
consequently the higher the second order moments due to the weight of the pile and the hammer. Since both
the environmental loads as the mass loads are enlarge by action factor combination 2, this is the governing
load case.
All environmental directions should be considered. This is a result of the different distances from piles two
three and four are has with respect to pile one for different environmental directions, as explained in section
5.7.
In conclusion, the integrity of the three PIF footprints should be checked for the operational scenario in 8
environmental direction; in the the deepest water depth of 60.53 meter; exposed to a wave with a peak period
of 6 seconds and 4.54 meter high; with action factor combination 2.
6.2. Results of Shims-Force Calculation Model for the Governing Load Combinations 49
6.2. Results of Shims-Force Calculation Model for the Governing Load Com-
binations
The shim reaction forces due to the second order bending effect are calculated with the calculation model
introduced in chapter 5. In this chapter the results for the governing load combinations are shown. These
results have to be include in the SACS models of the adjustable PIF.
The reaction forces of the four piles at the top and bottom shim, for three different footprints, are given in
tables 6.4, 6.5 and 6.6.
Table 6.4: Square footprint of 20 meter, reaction forces at top and bottom shims for different environmental directions
Table 6.5: Square footprint of 24 meter, reaction forces at top and bottom shims for different environmental directions
Table 6.6: Square footprint of 32 meter, reaction forces at top and bottom shims for different environmental directions
From this tables can be noticed, that the reaction forces for the pile 1 with hammer are significantly higher
than the other piles without hammer.
50 6. Structural Integrity
Figure 6.4: SACS model of the adjustable PIF with a 24 meter x 24 meter footprint
6.4. Ratio between Applied and Allowable Stress of Members 51
Figure 6.5: Unity check of the adjustable PIF with 24 meter footprint
And combinations of these. The governing unity check is for the combination of compression, bending and
hydrostatic pressure. The results of the maximum unity checks are shown in 6.7
Table 6.7: Maximum ratio between the applied and allowable stresses of the members of the different footprints
Maximum Ratio
Footprint
applied/ allowable stress
(m) (-)
20 0.377
24 0.395
32 0.315
When the unity check is below 1, the members does not fail. So, from this can be concluded that all the
footprints of the PIF will survive the reference condition.
The SACS report with the calculation results of the unity checks are given in the appendix section A.11. To
verify the results from SACS, the calculation is also done by hand for the most critical member of the 24 meter
footprint configuration. These calculations are shown in appendix section A.10. Information of the member
with highest unity check are given in table 6.8.
52 6. Structural Integrity
The water depth at the member including wave elevation, for which the unity check is maximum, is H z =
63.625m.
To be able to calculate the unity checks, the forces and moments in the member should be known. These are
gained by the SACS model, given in table 6.9.
Table 6.9: Moments and forces at member with maximum unity check
The ISO code [2] requires the following resistance factors to apply over the stresses of the member, these are
given in table 6.10.
The results of the calculated unity checks for the 24 meter footprint are given in table 6.11.
Overall can be concluded, that the maximum unity check of the adjustable PIF for all footprints is not critical.
6.5. Sleeve Integrity 53
Figure 6.6: Comparison axial forces in the members connected to the sleeve Figure 6.7: Member name define
From this is concluded, that the axial forces in the members at the sleeve of the adjustable PIF are either
lower(-%) as higher(+%), than the current PIF. Therefore, the sleeve should be re-checked for the adjustable
PIF, whether it can resist the different loads from the members to the sleeve.
54 6. Structural Integrity
In table 6.12 the angle due to the deflections and the tilt due to the gaps between the shims are given.
From this can be concluded, that the stiffness of the adjustable frame with respect to the current frame is
equivalent. Also, is noticed that the tilt of the pile due to deflections is a small with respect to the total tilt.
The current PIF managed to install the piles just within the tolerances. Therefore, can be stated that the
different footprints of the adjustable PIF design also satisfies the required tolerances.
6.7. Conclusions
The ratio between the maximum stress and allowable stress of the members are in the same order for the
different footprints. The maximum ratio is under 0.4 for the representative reference condition, which is the
Beatrice offshore wind farm.
The deflections at the pile supports (shims), for the in-place condition are relatively small. This deflections
are not critical for the pile installation tolerances, since these are in the same order than the current PIF.
The members connected to the sleeve are both higher and lower than was designed for. Therefore, the sleeve
should be rechecked for the adjustable PIF, and if nesceserry modified.
7
Influence of Variations in Design
Conditions
Offshore wind farms with pre-piled jackets are planned at various locations around the world. In chapter 6
the integrity of the adjustable PIF is only executed for the reference load conditions. Therefore, this chapter
investigates the question: "What is the influence of variations in pile designs and conditions"; it is based on
the before mentioned reference condition with one parameter varied per analysis. The results are shown in
graphs, in which the results of two scenarios are depicted: one with only the pile; and one with the hammer
on top of the pile.
For the scenario, pile with hammer on top, the results are shown for the reaction forces due to the weight of
the pile and the hammer, the environmental load, and the total reaction forces.
For the scenario with only the pile, only the total reaction forces are shown. Because the contribution of the
pile weight on the total reaction force is relatively low, as concluded in section 6.2. Consequently, the total
reaction forces are almost equal to the reaction forces due to the environmental load.
Throughout this chapter, the following symbols and abbreviations are used:
• R2 - reaction force at top shim (node 2)
• R3 - reaction force at bottom shim (node 3)
• P&H - pile and hammer
• P - pile
• tot - total reaction force due to environment and weight of pile and hammer
• env - reaction force due to environment
• mass - reaction force due to weight of pile/ hammer
In the subsequent analyses, the graphs contains a intermittent horizontal line, representing the maximum
pile-shims reaction force of the reference condition. The vertical intermittent lines shows the representative
boundaries for reasonable offshore wind farm projects, which are presented in table 6.1.
The results of the axial forces in the members are shown in table 7.1 for both scenarios. Only the axial forces of
the Top x, Mid x and Bot x members are given, because the PIF is practically symmetrical in x and y direction.
The axial forces in the members for the "only PIF" scenario, are about 6% with respect to the axial forces of
the PIF with pile and hammer, meaning that the forces in the members are mainly caused by the pile-shims
57
58 7. Influence of Variations in Design Conditions
Table 7.1: Axial forces into the members connected to the sleeve
In combination with the conclusions of chapter 6, the frame of the PIF is capable to withstand the reference
condition, and to install within the installation tolerances. It can be assumed that: if the pile-shims reaction
forces are below these of the reference conditions the PIF can be used. Consequently, the direct results of the
pile-shims calculation force model (including environmental load) can be used for a first estimation of the
PIF integrity.
The influence of variations in wave conditions are not considered, since the maximum operable wave con-
ditions of the Stanislav Yudin with the PIF are equal at all locations. Therefore, the maximum operable wave
condition is used for all analyses, and it is found in section 6.1.3: t p = 6 s and h max = 4.54 m.
Figure 7.1: Reaction forces at top shims, with respect to the water depth
The environmental force of both the pile and the pile with hammer increase with the water depth until they
are fully submerged. With increasing water depth, more of the pile/hammer is exposed to the water. When
fully submerged, the reaction force decreases because of lower environmental loads. The current velocity
and wave velocity and accelerations are maximum at sea water level, and decreases over the water depth.
Therefore, the reaction force for only the pile increases until 55 meter water depth, followed by decreasing,
when fully submerged.
The hammer on top of the pile has different diameters, see the sketch of hammer in figure A.6); this results in
7.2. Environmental Conditions Influences 59
irregularities in the forces between 55 m and 75 m. The force on a cross section depends on the diameter, just
as the drag and inertia constants. So, with increasing water depth, another diameter is at the water surface
level, resulting in abrupt reaction force changes.
The reaction force due to the weight of the pile increases when the environmental load increase. The bending
of the pile increase with environmental loading, resulting in higher second order effects. Consequently, the
internal moment due to the hammer weight becomes higher, and therefore also the reaction force at the top
shims.
The reaction forces at the shims within the pile length boundary conditions are all below the maximum reac-
tion force of the reference condition.
Figure 7.2: Reaction forces at top shims, with respect to the current velocity
The load increase with the current velocity squared, see Morrison equation 5.33. Consequently, the pile bends
with the velocity squared. Therefore, the initial pile top displacement is larger, and the pile bends further,
resulting in higher reaction force due the second order effect. However, the increase in reaction force due to
the mass is marginal for the representative velocities (under 1.5 m/s).
A higher current velocity gives higher reaction forces; this means that the PIF can not be used for the reference
conditions with an increased current velocity.
Figure 7.3: Reaction forces at top shims, with respect to the replaced soil spring stiffness
The reaction force is constant for a spring stiffness below 107 1/m. For a stiffer soil, the displacement of the
pile tip becomes lower, and the soil will act as a hinged connection fixed in x direction, resulting in an increase
60 7. Influence of Variations in Design Conditions
Figure 7.4: Ratio between the reaction force of top and bottom shims with respect to the replaced soil spring stiffness
When the stiffness of the soil becomes higher, the pile bending changes, therefore the ratio between the top
and bottom shims also changes. The initial pile penetration is assumed small. Consequently, the replaced
soil spring will below 107 1/m.
The constant ratio below the spring stiffness of 107 1/m is calculated, by assuming is an infinitely stiff pile (no
bending) and a soil stiffness of zero (freely supported hinge), for a force at the top of the pile. A sketch is given
in figure 7.5.
For no soil stiffness, R 4 = 0 is assumed to be zero. The relation between the top and bottom shims can be
calculated by solving the static balance for the forces and moments:
R3 · B
ΣM 2 = 0 : F · A + R 3 · B = 0 → F =− (7.1)
A
R2 B
ΣF = 0 : F − R 2 − R 3 = 0 → = 1+ (7.2)
−R 3 A
For the reference condition: A = 41.8 m, B = 9.325 m, this gives −R 2 /R 3 = 1.22. This equals the result of the
model.
7.3. Pile Design Influence 61
7.3.1. Length
The influence of the pile length on the reaction forces at the shims are given in figure 7.6.
Figure 7.6: Reaction forces at top shims, with respect to the length of the pile
The reaction forces increase with the pile length due to both, the environmental load and bending due to
mass. The environmental load is the highest at the sea water level, as explained in subsection 7.2.1. When the
pile length becomes longer, it reaches above the sea water level, then the environmental load stays constant.
The weight of the pile and hammer increases with the length of the pile. The longer the pile, the bigger the
initial displacement of the pile top due to tilt. The larger the displacement the higher the internal moment,
and consequently higher reaction force at the shims.
Within the reasonable boundary conditions, the reaction forces for all pile lengths are approximately beneath
the maximum reference condition. So, the variation in pile length will not be a show-stopper.
62 7. Influence of Variations in Design Conditions
7.3.2. Diameter
The influence of the pile diameter on the reaction forces at the shims are given in figure 7.7.
Figure 7.7: Reaction forces at top shims, with respect to the current velocity
The diameter of the pile is varied from 1.3 meters, because with lower diameters the pile bends infinitely, in
other words the pile fails. The maximum diameter is 3.5, because a larger diameter cannot be installed with
the current sleeves.
The environmental load depends linearly on the pile diameter, see Morrison equation 5.33. Also, the inertia
and drag coefficients increase with the diameter. So, the environmental load increases with the diameter.
The second moment of inertia depends on the diameter to the power four. Meaning, the smaller the diameter,
the less resistance against bending. This results further pile bending, consequently the internal moment,
because of the mass of the hammer and self-weight, becomes higher. By increasing the diameter, the second
moment of inertia increases by the power four, and therefore the influence of the mass decreases.
Overall, increasing the diameter results in higher environmental load, and lower influence of the pile and
hammer weight. Moreover, an optimum is at 2.2 meter diameter, which equals the pile diameter of the refer-
ence conditions.
Figure 7.8: Reaction forces at top shims, with respect to the pile diameter
The higher the D/t ratio, means a smaller pile thickness for a constant diameter. A smaller pile thickness
results in a lower second moment of inertia, so the resistance against bending decreases. This means that the
pile bends further, resulting in a higher internal moment, and the reaction forces increase.
The additional bending for reasonable d/t ratio’s as given in the box are approximately constant. So, the
influence of the pile thickness is not considerable with respect to the reaction forces.
7.3. Pile Design Influence 63
Figure 7.9: Reaction forces at top shims, with respect to the pile diameter
The reaction force increases with the weight of the hammer. The higher the hammer weight, the higher
internal moment, and therefore higher reaction forces at the shims. Although, for the current used hammer
weights, the differences are not significant.
8
Conclusions and Recommendations
8.1. Conclusions
The Pile Installation Frame (PIF), with interchangeable connections between the original sleeves and the
center base frame, is the most feasible conceptual design to alter the existing PIF design. This concept, shown
in figure 8.1, contains eight interchangeable frames. Moreover, the center base frame (with equipment and
a lifting point) is usable for all footprint configurations. According to the trade-off, this concept requires the
least investment costs for the modifications, because the existing sleeve connections are reused. However, the
operational time to adjust the footprint is relatively time consuming. Assuming the footprint is not adjusted
on a regular base, this is of secondary importance.
Figure 8.1: Conceptual adjustable PIF design with the maximum footprint of 32 meter
The new generated model to calculate the reaction forces from the pile onto the shims, including second
order bending effect is developed and verified. From the verification, it is concluded that:
• The iteratively calculated second order bending, converges when the pile is capable to withstand the
bending forces. So, the model is stable.
• The reaction forces due to the weight of the pile and the hammer are exactly equal to the model in the
structural simulation software SACS.
• The environmental forces over time are within one percent difference with the SACS model. But, when
the horizontal velocity component of the wave change signs in time, an offset occurs. The maximum
environmental force is not at this offset. So, this will not influence the end results of the adjustable PIF
integrity check.
65
66 8. Conclusions and Recommendations
The integrity of the conceptual PIF is checked with three models in the structural simulation software SACS.
For the minimum square footprint of 20 meter, the reference footprint of 24 meter and the maximum foot-
print of 32 meter. From these models, it is concluded that:
• The deflections at the pile supports (shims), for the in-place condition (at the seabed with four piles
and a hammer) are relatively small. This deflections are not critical for the pile installation tolerances,
since these are in the same order than the current PIF.
• The ratio between the maximum stress and allowable stress of the members and braces are in the same
order for the different footprint. The maximum ratio is under 0.4 for the representative reference con-
dition, which is the Beatrice offshore wind farm.
From the analyses of the influences of variations in design conditions, it is concluded that:
• The forces in the members and braces of the frame are mainly caused by the reaction forces between
the piles and shims transferred to the PIF
• The forces onto the shims in the sleeve are maximum when the hammer is at the seawater surface. This
is because a section of the hammer diameter is wider than the pile.
• The pile diameter of 2.2 meter is the optimum for the reference conditions. Increasing the pile diameter
gives higher force due to environmental loads, decreasing the diameter results in higher loads due to
bending.
• The influence of the pile thickness is not considerable with respect to the forces onto the frame. Be-
cause the thickness is relatively small to the diameter.
8.2. Recommendations
When the footprint of the PIF should be adjusted on a regular basis, the operational costs become more
important than the investment costs. In that case the conceptual design, where the sleeves can slide to all
positions, should be considered. The adjustment of this concept is less time consuming during offshore
operation. So, the more the frame needs to be adjusted, the more interesting this concept becomes.
Modifying the calculation pile-shims reaction forces model, by solving the offset with the SACS model. Be-
cause, the results of the second pile (pile without hammer), can be effected by the offset in the model (in some
wave/ current conditions). Although, the influences of the offset in reaction forces are small with respect to
the total reaction forces.
Include wind load to the model. When the wind load is in the same direction as the wave and current loads,
the stresses in the frame becomes higher.
Check the on-bottom stability of the PIF. For this check another ISO load factor combination should be ap-
plied. When the overturning moment due to the environmental forces becomes high with respect to the
weight of the PIF, the PIF can fall over.
Include an integrity analyses for the transport and lift scenarios. These scenarios induces other loads and
therefore, the stresses in the frame becomes different.
Check the braces and the members on punching. If the check fails, connections between the members and
braces should be strengthened.
When tighter installation tolerances are required for a particular project, it is recommended to reduce the gap
between the pile and the shims. Because, the tilt due to the gaps between the shims and the pile induces the
largest angle with respect to vertical.
A
Appendix
Figure A.1: Deck Stanislav Yudin with adjustable PIF maximum footprint (32x32)
Figure A.2: Deck Oleg Strashnov with adjustable PIF maximum footprint (32x32)
67
68 A. Appendix
Diameter CD CI (CM)
inch m - -
12 0.305 0.61 1.39
24 0.610 0.665 1.4
48 1.219 0.72 1.45
72 1.8289 0.756 1.67
96 2.438 0.781 1.67
120 3.048 0.799 1.71
A.3. Profile of Wave Velocity and Acceleration over the Water Depth
The distributions of the velocity and acceleration over the water depth are shown in figure 5.8a and 5.8b.
( (
Z c c = z H ,2 if z H ,2 ≥ 0 d = z H ,3 if z H ,3 ≥ 0
− M H ,3 = M H ,2 + FM d z with and (A.5)
d c =0 if z H ,2 < 0 d =0 if z H ,3 < 0
( (
Z e e = z H ,3 if z H ,3 ≥ 0 f = z H ,4 if z H ,4 ≥ 0
− M H ,4 = M H ,3 + FM d z with and (A.6)
f e =0 if z H ,3 < 0 f =0 if z H ,4 < 0
Figure A.10: Horizontal force component hammer Figure A.11: Horizontal component pile
72 A. Appendix
1
M i = θi · F pi l e · · L A + θi · F ham · L A (A.10)
2
With the calculated moment M i of equation A.10 the new bending angle is calculated:
Mi L A
θi +1 = θ0 + (A.11)
EI
The new bending angle θi +1 is submitted in the moment equation A.10, and the following bending angle again
calculated with equation A.11. This is the iterative process. When the difference of the calculated moment
(M i +1 ) with the previous calculated moment (M i ) is almost zero, the equilibrium is achieved.
Subsequently, the forces into the shims are calculated by:
LB
F shi m1,2 = M r · (A.12)
2
1
ΣM R = 0 → F e · a − (F g − F b ) · b + F r 1 · b = 0 (A.13)
2
If the moments of the system do not equals zero, the system is not static. In this case the PIF is unstable and
will fall over. Rewriting equation A.13 gives the force due to the mass what should be higher than the external
forces due to the environmental and the reaction forces of the bottom.
Fe · a + Fr 1 · b
F g − Fb > 1
(A.14)
2b
F e = environmental force
F g = gravitational force
F b = buoyancy force
F r 1 = reaction force 1
F r 2 = reaction force 2
R = rotation point
Figure A.14: Access platforms sleeve top Figure A.15: Acces platforms sleeve middle
Figure A.16: Access platforms sleeve bottom Figure A.17: Center platform
A.8. On-bottom Stability 75
Figure A.30: PPSM Figure A.31: Cameras, lasers at ILT and catcher
π ¡ 4
D − (D − 2t )4
¢
I= (A.16)
16
π ¡
4574 − (457 − 2 · 12.7)4 = 437.8 · 106 mm 4
¢
I=
16
π ¡ 4
D − (D − 2t )4
¢
Ip = (A.17)
32
π ¡
4574 − (457 − 2 · 12.7)4 = 218.9 · 106 mm 4
¢
Ip =
32
Radius of gyration r :
r
I
r= (A.18)
A
s
437.8 · 106
r= = 157.1 mm
177.3 · 102
Slenderness parameter λ:
s
K L fys A r
λ= = (A.19)
πr EI L
r
λ= → λ = 0.000109 (A.20)
L
π ¡ 3 I
µ ¶
D − (D − 2t )3
¢
Ze = = (A.21)
32D D/2
π
457 − (457 − 2 · 12.7)3 = 191.5 · 104
3
N /mm 3
¡ ¢
Ze =
32 · 457
1¡ 3
D − (D − 2t )3
¢
Zp = (A.22)
6
1¡
Z p = 4573 − (457 − 2 · 12.7)3 = 250.8 · 104 N /mm 3
¢
6
A.10. Detailed Unity Check Calculation by Hand 79
Calculating of Stresses
Hydrostatic Pressure p (γe from table 6.10):
p = γe ρ f g H z (A.23)
2
p = 1.35 · 1025 · 9.81 · 63.625 = 0.640 N /mm
fx
σt = (A.24)
A
−708.9655 · 103
σt = = −39.994 N /mm 2
177.3 · 102
Bending Stress σb
M
σb = (A.25)
Ze
−187.2461 · 103 2.2139 · 103
σb,y = = −97.735 and σb,z = = 1.1556 N /mm 2
191.5 · 104 191.5 · 104
Shear Stress τb
2V
τb = (A.26)
A
2 · 407.6757 · 103
τb = = 45.995 N /mm 2
177.3 · 102
MD
τt = (A.27)
2I p
−9.149 · 103 · 457
τt = = −2.3877 N /mm 2
2 · 218.9 · 106
pD
σh = (A.28)
2t
0.640 · 457
σh = = 14.964 N /mm 2
2 · 12.7
Capped-end stress is a compressive axial stress due to capped-end hydrostatic actions calculated using the
value of pressure (p) (always positive):
σq = 0.5σh (A.29)
2
σq = 0.5 · 14.964 = 7.482 N /mm
From the calculated stresses is concluded that the critical member has a negative stress, which means the
member is in tension. Therefore, the member have not to be checked for compression.
80 A. Appendix
Unity checks
The tubular members subjected independently to tension, compression, bending, shear or hydrostatic pres-
sure shall be designed to satisfy the strength and stability requirements [2]. Also combinations are checked.
This is calculated in the subsequent.
Compression
σt
Um = (A.30)
f t /γR,t
σt
Um = → Um = 0.0967 → Um = 0.0967 (A.31)
f t /γR,t
With:
ft = ft → f t = 355.00 (A.32)
Beam Shear
τb
Um = → Um = 0.205 (A.33)
f v /γR,v
With:
Torsional Shear
τt
Um = → Um = 0.008 (A.35)
f v /γR,v
Combined Shear
The utilization of the member under torsional shear in combination with beams shear:
τb + τ t
Um = → Um = 0.2133 (A.36)
f v /γR,h
Hoop buckling
The utilization of the member under external pressure:
σh
Um = → Um = 0.1342 (A.37)
f h /γR,h
With f h is the representative hoop buckling strength, and since f he < 00.55 f y :
F y D Zp
µ ¶
f b = 1.13 − 2.58 · fy → f b = 450.37 (A.43)
E t Ze
Since the tension stress is higher than the cabbed end stress, the combined tensile stress σt ,c is:
With:
γR,h σh
B= → B = 0.134 (A.48)
fh
And:
fh
η = 5−4 → η = 3.430 (A.49)
fy
82 A. Appendix
[6] Dimitris Chrysafopoulos. Beatrice offshore wind farm pif structural design report. Technical report,
Seaway Heavy Lifting.
[8] Andrew Ho and Ariola Mbistrova. The european offshore wind industry - key trends and statistics. Tech-
nical report, Wind Europe, January 2017.
[10] A.V. Metrikine. Dynamics, Slender Structures and an Introduction to Continuum Mechanics. Faculty of
Civil Engineering and Geosciences.
[11] Frances Robles, Kirk Semple, P. Vivian Yee, and C. Thomas. Caribbean devastated as irma heads toward
florida. The New York Times, 2017.
89
Glossary
91