0% found this document useful (0 votes)
108 views3 pages

DPR Template

Use this Template to make construction DPR

Uploaded by

sandeepdas176
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views3 pages

DPR Template

Use this Template to make construction DPR

Uploaded by

sandeepdas176
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT OM MANGALAM DISHA

NAME
DATE :- 20-08-2024

SR NO BUILDING ID CONTRACTOR NATURE OF WORK WORK LABOUR DETAILS

PLASTER
PLUMBER MASON M/C F/C CARPENTER HELPER FITTER HELPER TOTAL
MASON

1) CLEANING WORK ON 9TH FLOOR .

2) DE SHUTTERING WORK OF TERRACE SLAB AT C BUIDLNG .


1 B & C BUILDING ARYA INFRA RCC 0 0 6 1 5 3 3 1 19
3) SHUTTERING WORK OF C BUILDING SOLAR PANEL & WATER TANK BEAM BOTTOM.

4) REINFORCEMENT WORK OF SOLAR PANEL BEAMS.

1) DE SHUTTERING WORK OF A & B BUILDING COLUMNS ABOVE TERRACE SLAB .

2) STEEL CUTTING & SHIFTING WORK FOR REINFORCEMENT WORK OF BEAMS .


2 A & B BUILDING ARPEE CONSTRUCTION RCC 0 0 6 5 2 2 3 2 20
3) MATERIAL SHIFTING WORK .

4) REINFORCEMENT WORK OF PARAPET WALL ABOVE TERRACE SLAB AT A & B


BUILDING.

1) MATERIAL SHIFTING WORK ON 2ND FLOOR AT SHOW FLAT.

COMPANY 2) WATER TANKER UNLOADING WORK AT LABOUR CAMP.


3 A ,B & C BUILDING DEVELOPMENT WORK 0 0 2 2
DEPARTMENT
3) DE WATERING & CLEANING WORK OF TERRACE OF ALL FLATS .

1) BLOCKWORK OF 8TH FLOOR C BUILDING FLATS.

2) MATERIAL SHIFTING WORK.


SAMARTH
4 B AND C BUILDING BLOCKWORK 2 4 5 4 15
CONSTRUCTION 3) INTERNAL TAR PLASTER WORK ON 8TH FLOOR C BUILDING FLAT NO. C-802

4) TAR PLASTER WORK OF STAIRCASES OF C BUILDING FROM 7TH TO 5TH FLOOR .

5 NO WORK. 0 0
B & C BUILDING AFK ENTERPRISES POP WORK 0

1) MATERIAL SHIFTING WORK.

6 A AND B BUILDING SYMA DÉCOR POP WORK 2) POP WALL PUNING WORK OF 6TH FLOOR B - 601 ( WALL PUNNING ). 4 1 0 5

1) MATERIAL SHIFTING WORK.

BLOCKWORK & 2) EXTERNAL PLASTER WORK FROM 6TH FLOOR TO 3RD FLOOR (2nd LAYER)
7 A AND B BUILDING RAVINDRA MUDAVAT ( CONSUMPTION : 120 BAGS OF RMP FOR EXTERNAL PLASTER) 0 5 5 6 16
PLASTERWORK

3) A BUILDING SCAFFOLDING WORK FOR DUCT PLASTER.

1) WATERPROOFING WORK ON 5TH FLOOR A AND B BUILDING FLATS


WATERPROOFING ( BRICKBAT WATERPROOFING) .
8 A AND B BUILDING SHRI ENTERPRISES 2 0 1 3
WORK
2) MATERIAL SHIFTING WORK.

9 A,B,C BUILDING MAHADEV MALI CORE CUTTING WORK NO WORK 1 1 2

10 C BUILDING JOSEPH PLUMBER PLUMBING WORK 0 0 0


NO WORKS

11 A,B,C BUILDING ALFA ELECTRICAL ELECTRIC WORK 1) 3RD FLOOR A,B AND C BUILDING FLATS DB FIXING WORK. 2 1 0 3

MATERIAL CONSUMPTION
SR. NO. MATERIAL NAME GRADE/UNIT QUANTITY (CU.M) WORKING DETAILS

MACHINERY REPORT
SR NO TYPE OF MACHIN WORKING HOURS WORK LOCATION WORKING DETAILS CH NO NAME OF AGENCY