Table of Contents
Message from the Municipal Mayor
Table of Contents i
List of Tables iv
List of Figures v
Abbreviation of terms vi
Executive Summary vii
Chapter 1: Introduction
1.1 Purpose of the SWM Plan 1
1.2 Approach in preparing the plan 3
1.3 Acknowledgement 4
Chapter 2: Municipal Profile
2.1 Location 5
2.2 History 6
2.3 Population 7
2.4 Economic Profile/Land Use 10
2.5 Physical Characteristics 14
Chapter 3: The Current Solid Waste Management Condition
3.1 Institutional Arrangements 15
3.2 Inventory of Equipment & Staff 17
3.3 Waste Reduction at Source 18
3.4 Collection 18
3.5 Transfer 19
3.6 Processing Facilities 19
3.7 Final Disposal 19
3.8 Special/Hazardous Wastes 19
3.9 Market for Recyclables 19
3.10 Information and Education Campaign (IEC) 19
3.11 Revenue and Cost 20
3.12 Definition of Problems and key Issues 20
i
Chapter 4: Waste Characterization survey (WACS) 21
Chapter 5: Institutional Framework
5.1 Local Laws and Regulations 23
5.2 Roles 23
5.3 Municipal Ecological Solid Waste Management Board (MSWMB) 24
5.4 Barangay Solid Waste Management Committees 25
5.5 Stakeholders Participation 25
Chapter 6 Plan Strategy
6.1 Vision 26
6.2 Diversion Targets 27
6.3 Strategies 27
6.3.1 Waste Reduction at Source 27
6.3.2 Division of collection responsibilities 28
6.3.3 Diversion 28
6.3.4 Appropriate Final Disposal 28
6.3.5 Capability-building of the BSWMC 28
Chapter 7: Solid Waste Management System
7.1 Source Reduction 30
7.2 Collection 31
7.3 Waste Reduction, Segregation, Recycling and Composting 40
7.4 Transfer Station 45
7.5 Alternate technologies for residual wastes 45
7.6 Waste Disposal 45
7.7 Domestic Hazardous Waste/ Special Wastes 46
7.8 Information, Education and Communication (IEC) 46
Chapter 8 Implementation Strategy
8.1 Framework 50
8.2 Diversion Projection 51
8.3 Monitoring Program 53
8.4 Incentive Programs 53
ii
Chapter 9 Institutional Aspects
9.1 Roles 54
9.2 Legal 54
Chapter 10 Social and Environmental Aspects
10.1 Social Aspects 55
10.2 Environmental Aspects 55
Chapter 11 Cost Estimates/Financial Aspects
11.1 Investment Cost 56
11.2 Annual Cost 57
11.3 Funding Options 57
11.4 Cost Evaluation and Comparison 58
11.5 Summary 59
Chapter 12 Plan Implementation
12.1 Phases, Responsibilities and Milestones 60
12.2 Implementation Schedule 60
Appendix
Appendix A: SB Resolution No. 2019-22 s. 2019– Resolution approving
and adopting the 10-year Solid Waste Management Plan of
the Municipality of Butig, Lanao del Sur for year 2019-2029
Appendix B: EO No. 2019-12 s. 2019 – An Executive Order Reconstituting
and Reorganizing the Municipal Ecological Solid Waste
Management Board (MESWMB) of the Municipality of Butig,
Lanao del Sur
Appendix C: SB Resolution No. 2019-19 s. 2019 – Resolution approving
the Implementing rules and regulations of the Municipal
Ordinance 2019-04 s. 2019 of the Municipality of Butig,
Lanao del Sur
Appendix D: Municipal Ordinance No. 2019-04 s. 2019 – An Ordinance
Institutionalizing the Ecological Solid Waste Management
Program of the Municipality of Butig, Lanao del Sur
Appendix E: Executive Orders creating the Barangay Solid Waste
Management Committees
iii