0% found this document useful (0 votes)
54 views2 pages

10 TS ST-6016Vol.-1 (English)

Vol 1 english

Uploaded by

devd7314
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views2 pages

10 TS ST-6016Vol.-1 (English)

Vol 1 english

Uploaded by

devd7314
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PUNJAB STATE TRANSMISSION CORPORATION LIMITED

(Regd. Office: PSEB Head Office, The Mall, Patiala)


Office of Chief Engineer /Transmission System,
B-2, Shakti Vihar, Patiala.

NOTIFICATION NO. 10/TS/ST-6016/Vol.-1 Dated: 27.8.2012

It is hereby notified that Punjab State Transmission Corporation


Ltd. (here-in-after called the PSTCL) proposes to undertake the following
schemes/transmission works necessary for the dispersal/distribution of power
for the improvement of the transmission and distribution system of the Punjab
State Transmission Corporation Ltd.
TRANSMISSION WORKS FOR THE YEAR 2012-13

Sr. Name of Work. Scope of Size of Approx.


No. work, conductor cost (Rs
Approx. in Sq. in Lacs)
Length of inch.
line in
Kms.
1. Raising of 132KV Sarna-Pathankot 0.058 0.2 1.02
Circuit-1&2 at Sarna end for 66KV Link
from 220/66KV Transformer to 66KV
yard at Sarna.
Deposit works
2. Modification of over head crossing of 0.310 0.4 11.28
220KV D/Ckt. RTP-Lalton Kalan line at
CH 95.323 Chandigarh-Ludhiana
Railway line .
3. Raising of 132KV S/Ckt. line from 0.615 0.2 10.84
Ghulal to Samespur due to construction
of Railway Track at 78.877 Morinda-
Sahnewal section .
4. Raising of 132KV S/Ckt. line from 1.311 0.2 23.10
Ghulal to Doraha line due to construction
of Railway Track Morinda-Sahnewal
section CH 82.652.
5. Modification of 220KV D/Ckt. RTP- 0.585 0.4 21.29
Gobindgarh line Ckt-I & II infringing
dedicated freight corridor alignment at
KM 321/7-9.

DY.CE/TS (Design),
PSTCL, Patiala
It is hereby notified that the PSTCL is undertaking and executing the
sanctioned scheme and shall have the powers for placing of any Wires, Poles,
Stays, Apparatus and Appliances for the Transmission and Distribution of
Electricity or for Transmission of telegraphic or telephonic communications
necessary for proper coordination of the works of PSTCL for the areas
indicated above which the Telegraph Authority possess under Part-III of the
Telegraphs Act. 1885 (XIII of 1885) in respect of telegraphs established or
maintained and the provisions of section 12 to 16, 18 and 19 of the Indian
Electricity Act 1910 shall not apply to the same and therefore no separate
notice of the scheme of PSTCL is required to be given.
This notification has been issued with reference to the relevant clauses
of Indian Electricity Act 1910 alongwith latest statutory amendments,
modifications upto date over riding enactments if any and the provisions made
under Section 164 of the Indian Electricity Act 2003. Notice is hereby given that
any person may raise objection if any/and or make any representation against
the above scheme/transmission works within two month of issue of this
notification. Thereafter no objection and or representation will be entertained
and all schemes/transmission works will be deemed to be sanctioned with or
without modifications as approved by the PSTCL. Necessary plans showing the
tentative route of the Transmission Lines may be seen on any working day in
the office of Dy. CE/TLSC, PSTCL, Patiala. Objections and/or representations
in respect of the above schemes if any should be sent to the undersigned.

Dy. CE/TS (Design), Chief Engineer/TS


PSTCL, Patiala. Pb. State Trans. Corp. Ltd.
B-2, Shakti Vihar, Patiala.

DY.CE/TS (Design),
PSTCL, Patiala