Apoorva Taduri
Boca Raton, FL | apurvataduriqs@gmail.com | (561) 875-3758
SUMMARY
Efficient Quantity Surveyor with 3 years in cost management and related work. Managed projects from inception to
completion, including initial cost projections, negotiation with contractors, regular reports, and revised projections for
presentation to executive officials and client correspondence maximizing customer satisfaction.
EDUCATION
Florida Atlantic University                                                                               Boca Raton, FL.
Masters in civil engineering                                                                 Expected date December 2024
National Academy of Construction                                                                         Hyderabad, India
PG Diploma in Quantity Surveying and Contracts Management                                                 September 2020
B V Raju Institute of Technology                                                                             Medak, India
Bachelors in civil engineering                                                                                 May 2019
GPA-3.46/4
RELEVANT COURSEWORK
Construction Management, Quantity Surveying and Contracts Management, Project Management, Estimation,
Transportation Engineering, Foundation Engineering, Surveying, and Reinforced Concrete Design
EXPERIENCE
Ark Builders                                                                                              Hyderabad, India.
Quantity Surveyor                                                                                     Jan 2021 to July 2023
Projects- Residential Gated Community with 9 Buildings, Kids Friendly Gated Community High Rise Residential
Building with 4 Buildings.
 Prepared quantity take off of structural, architectural, and external work quantities, by calculating material quantities
    and costs, labour costs, and an achievable project timeframe.
 Prepared cost control and budget allocation, monthly progress claims, variations/change orders, and Comparative
    Analysis.
 Meeting clients to determine their needs and discuss any areas needing price or feasibility revising.
 Negotiating labour contracts and schedules advising clients and crew on legal matters and disputes.
 Monitoring subcontractors, safety practices, construction progress, and material needs, including any changes which
    may impact costs.
 Mainly indulge in tracking and reducing the wastage of materials.
 Compare work estimates so the repair work stays within a specific budget guideline and meet with construction
    supervisors to discuss proper ways to disperse trash.
 Responsible for reviewing all drawings, preparing requests for information (RFI) to the general contractor, and
    copying to the Project Manager.
 Bring systems discrepancies, drawing dimensional Issues, etc. Follow up daily until a resolution is received.
 Preparation of Project Progress Reports & Analyse the Progress to ease the process of achieving milestones with
    correct Instructions.
 Evaluated sub-contractors claims and preparation of interim certificates of payments.
Trainee Quantity Surveyor                                                                   Hyderabad, India
Pennar Engineering Building Systems Ltd.
Project - Pre-Engineering Buildings
• Roles and responsibilities of order management and project management department.
• Visited and Learned about a completed project in Telangana and also ongoing projects
Trainee Civil Engineer                                                                     Hyderabad, India
Sudha Constructions
Project - G+3 Floors GHMC Project
• Was a Team player and gained experience in Estimating quantities and cost of materials, equipment, and labour to
    determine project feasibility.
• Handled project documentation and consulted with on-site engineers
ACADEMIC PROJECTS
Project-1: Adopting New Sustainability Technologies PEB COMPOSITE Structure for Large Warehouse Project, Area of
Study “COMPARISON OF THE PLANNED SPECIFICATION AND SCHEDULES TO ACTUAL”
Objective: To understand the importance of cost-effectiveness and effective execution of the project.
Description: Construction planning and scheduling were done using the project management software known as
MICROSOFT PROJECT, PRIMAVERA, CANDY, and the methodology adopted was Earned Value Management was
found effective in finding schedule variance, cost variance, and tracking of the project.
Project-2: PLANNING AND ESTIMATION OF G+2 EDUCATIONAL BLOCK
Objective: Draft the layout of the proposed building and calculate the approximate cost of the building
Description: Worked out the layout as per AICTE requirements, all the drafting was done using REVIT and AutoCAD and
concluded with a cost estimate for the entire project using MS Excel.
COURSES
Project Cost Management, Estimating, Budgeting and Control
TECHNICAL SKILLS.
AutoCAD 2D, Revit, Microsoft Office, MS Project, Primavera
LANGUAGES
Fluent in the written and oral communication of English