King Edward Memorial Park Foreshore
King Edward Memorial Park Foreshore
Location plan
Introduction
Construction
Phase one construction plan
Diversion only required when internal site road in use
Construction
Phase two construction plan
Diversion only required when internal site road in use Maximum extent of construction site for phase 2 Site hoarding Cofferdam Controlled (day time) crossing open unless required by construction activities Piling rig Local authority boundary Site support/welfare Excavated material storage and processing Maintenance workshop and storage Construction support Internal site road Crane Barge Site access Existing Thames Path Thames Path diversion
Phase three construction plan
Diversion only required when internal site road in use Maximum extent of construction site for phase 3 Site hoarding Cofferdam Controlled (day time) crossing open unless required by construction activities Local authority boundary Site support/welfare Excavated material storage and processing Construction support Internal site road Site access Drop shaft Option for contractor to transport materials using barges Existing Thames Path Thames Path diversion
Draft limit of land to be acquired or used
Ca
et ble Stre
North East Storm Relief CSO
Proposed tunnel route centreline Local authority boundary Existing sewer Existing CSO
Maximum extent of construction site for phase 1 Site hoarding Cofferdam
Controlled (day time) crossing open unless required by construction activities
Local authority boundary Site support/welfare Internal site road Site access
y The Highwa
Glamis Road
King Edward Memorial Park
TOWER HAMLETS Free Trade Wharf
Jack up barge servicing piling operations Barge TOWER HAMLETS
Existing Thames Path Thames Path diversion
Shadwell Basin
SOUTHWARK
Cranes
SOUTHWARK
Drop shaft
TOWER HAMLETS
SOUTHWARK N
TOWER HAMLETS
SOUTHWARK N
N
Figure 1A: King Edward Memorial Park Foreshore location plan
Figure 2C: Illustrative phase 1 construction plan
Figure 2D: Illustrative phase 2 construction plan
Figure 2E: Illustrative phase 3 construction plan
Layout of the site showing landscape advance works
Relocated multipurpose sports area
3
King Edward Memorial Park Foreshore
Memorial Park benches permanently relocated in line with Memorial Thames Path diverted around construction site hoarding
13
Future use
14
Future use
Related documents: Design Electrical and control kiosk against existing brick wall
Layout of the site once construction works complete
Football pitch access Relocated childrens play area Memorial Park benches relocated on line with Memorial
15
Relocated bandstand
The Highway
The Highway
Artists impression of the site after the works are completed
Glamis Road
Glamis Road
Bowling green Football pitch
Proposed construction site
Proposed construction site
Tennis courts New North East Storm Relief CSO outlet
Figure 3B: Artists impression of the site after the works are completed
King Edward Memorial Park Foreshore
27
Controlled (daytime) crossing of construction access route open unless required by construction activities
Aerial view of the completed works
Thames Path widened and improved. Provides maintenance access to shaft
N Thames Path remains open during construction Minor reconfiguration of tennis courts Relocated childrens play area Paving and landscaping improvements to area around Rotherhithe Tunnel ventilation shaft Advanced tree planting to improve Memorial Avenue
Bike stands New gated entrance to park and Thames path Activity/ fitness zone Seating area Ventilation columns
N Grassed area around relocated bandstand
Figure 3C: Layout of the site showing landscape advance works
Figure 3D: Layout of site once construction works complete
28
29
Figure 3E: Aerial view of the completed works
30
www.thamestunnelconsultation.co.uk