Gi) Semiconductor veetifiers 4. Neon contactor,
using power Acodes ov thyustors: |g) «94 diveetly connects the vai) te earth. |
Lif-veil voltage vises above 150¥. i
ce. 3 ys
2. Civeu breakers 7 E
ZWase ve Special ype of suites used |B? bre baw |
ching of Mace tine as wal es to [8 ae ema tig) lead?
provide safely = ae ae
— lses paver Semicmrducte devices.
and de side Her ie —
ane) €.5./Pom diedd | tok — smod
a
3. Smoothing equipment, - These ere_filtering
pak
LC Oda
33304.
= unt = 3380
— Polytechnic Academy Patni:.. Academy Patna
wirements of high voltage ac. power
| 4. The Hyévo, Thame or Diesel power stations
Shoeld Supply the large vequivement of power
for the ralways aa
2. Sf shosld be « relia
3. Canfinuity of sippy in ell conditions.
Ij. Pover stations voaintain soppy accor-
ding to seasonal load changes. efficely
High wolege poser supply arrangement:
The power is purchased from sopply authonhes
en hansmissi
mission.
shansformey
for vail oe
h Voltage Supply
The poner Sepply to substation arangem-
anfe toy be of following types: —
6) Gephi)yauthorities oon install, operate and
wiainiein 132. kY transmission lines to 25 8Y
Ontpat termine! from substation.
Qailwaspyeuthorities only Contre) the circuct bre-
Aakexs hroxgh remote Control by traction power:
contaller. gti / bi
‘authorities. o1n. install operate and
ananfarre ai) the [52 kv equipment he Sub
uth oly gre BEY Foti
Gi)of Conshtuents
“Constituents or elements oP supply «stem
ase: =
{iy Sub-stetions »~
4B, 8c,
inh
io) Sb-sectioning and feral as pte
1) Sub-seetioning- post cube?
jer Alementany setion- >
Ik. Si statins Eee recto used
provide. ly to the eclectic
the Sub-
by emote control.
Hs main slements ave francformerc, isolators,
cincuif breakers and bus couplers
2. Fasding post CEP)" Shiga eantral pose which Combrale
25 AY trast ply 4 th estos heck. Ye
Tiomduments ove ssleins crest breakers
| dbus coplere.
ly cystem.
3. Sectioning and paralleling past (59)- TH is
is sifwated efproximetely between
feeding poste of duo zones. Sis used for
ating ef passers) ss ee
Bye DEA) cxehiom sUindey voltage Yley 2d
4. Seb-sectioning and fesaliding post nee -
Fach cection is divided into one or move. SSP.
qenwrelly ak @ distance of 10 40 15 kw»
Ssf is used fo isolate a faulty section
5. Seb-sectionmg post di simlov 40 SP except
iF has ne interne fav peraliding ef op are don.
tracks. df is rarely ated
ls Farris ‘Section = Each subsection i¢ divided
info ementary sechins. for fault vepair an mein
ferance oon!
Polytechnic Academy Patna‘The main components of @ traction sub- vance time:
‘Stain and hor functions ave given below i= civ) Isolators.
iy 220/t92 kV . 50 Ha duble cincut incoming | The main fenction of isolates is H iselete
line. One chreuit from ofher eireuct:
Y Double eivenct incoming line is used +0 7H isp ‘on both sides of Girewct
ensure continues supply 4o the traction Sub- breakers for iselating pur past during: maint
Station. Unanee Or fault clearance work
we atis sho upd im case of dong mates | Snase 7 SE Sarin”
a Raa of log v The function of cirewt breaker is +o break
i) Main bes bar ‘he civeait automatically in ease of fase
eee eich Gaev Soke | spat naky sete ving Ei
Sobply eerie os fine maun
+ 9 ic used to faed sapbly fo the traction. Ragu copaectealtstietn. he Pb zo
aoe Spy ends bus bar and transfer bus bave.
Sis connected through bus coupler creme | ©") Gus coupler
breaker. 4 tus eanlr chit eae with 490 iselabos
i) Transfe bus bar is provided between the $00 bus bars.
aa eae acs ak Ja2ky, SONS. ¥ Using bus coupler , the bus bar Seton Can
‘7 Sg bedone “on load” without disconbinatty in Service.
Bates previde power espply to Freche Sees
spphemmease of maintenance or fault clea, Polytechnic Academy PatnaWii) 132/25 kV Stepdown transformer | transformers are used.
133/as e
Y The function of this Hans former is #0
step-down the Voliege from 152.kv 40 26 xv.
Y Genveally $00 dane formers of (10-125 MVA))
‘ating ave used fav dhe fnain Und and
Gruintenance fine.
Sis Comethon do trachm system is given
bebo: i
rer a |
: —
V One 26 bY eicast breaker and 25uy feedey
Hippos eacetiery rad on the output tide, |
le
< i Hike ransfermer fo clearence of alt fast
© buy onctensfarme ied ation and Be | oy GHE and vaubre manfnance
Har is
< Th orer fo aid wibalence of, 3f neoming- Polytechnic Academy Patna
SAYPY. Scott Cols called scott-T) Connectedgett it 16 @ switching and control po.
ovide Supbl 5
Bearer Sith Plorrhiad aestae tre
+ The paver to the feeding post comes from the
traction substation.
vy Generally. there are too 25kV feeders betu-
een substation and ferding pest.
v One feeder is for normal oferation and other
these feeders axe tonmucted 40 tuo sete of
bas bors fhvsngh 40 oil type tieuit breatere
vy Tha tee Sus of bus bovs ave connected by
(pus couples)to be used during maintenance
FE foulk correction wor
The distance of feedi from the subst-
thin ae eat
]e The 25 eixeut breakers ore reste controlled
|
v Dosble leona suitehabne provided on
“bath sides oy every civeuct breaker: 3} povides
abhte ety nse fall saely $0 in-
tenance Steff ihn
Intereopters are used as Suitches{in the bus
bare Tn case of(tun Track lines) there ave
eras Shon ne
vy Tnternspiers ove single pole lou oil type Suitches
of isuned fo Ria orides|
acfomatic baking of faslh
Test can be both remote
emblled
One lo kVA, 250/230 step-down francine
is tied for charging badenies shih provide spply for
‘pve cohol ad Ifiting event
oilype C8, air blast type CB: » Vacuum pe <6
Polytechnic Academy PatnaFeeding and sso Asvangements
¥ Flectric traction needs single phase se- |v) Usin connect
iy bat the power unevating setine and |" substation
hase type
mess in traction
ans mission systems are
Nate: Sape limits of unbelancing- aS ‘
(i) current unbalance Y
unbelanced eatio. eS
AT
357.
287
doy
¥ Unbalance. abore a limit has following effects:
iy problems for adler consumes 2} SHpbly
(ip Lange beating of veer, ahich is very baemfil
for eHernator.
. Otel, effet om be Gadicced) by fell
igo 1. Sepply fo the subsHations iy
oy “thing from, agony sh sn,
ee aiff Substations ak di ffe- e pene e RS
Be ieee eieeoe@ 0 | Polytechnic Academy PatnaFeeding ervangement
To reduce_undalancing of 3-¢ supp-
| ys power is supplied from dif
tent phases as shown in dhe fig
«So Subply to each substation ne-
Yer Werks in pavalie.
gecgehibih Pela forde stony
jioning ax
ing 1s done to isolate clectvc
bebuean tus sebstatjons
tr
«This is necessary 50 that the panto-
do nat brides Couches) the
Newel Cdea4)
‘sectionsic
¥ OWE and its pouer supply arrangement |v These bridging Uva inhraptors
butwun feuding post and neutral section
is called as @ (section >)
wv rach substation (or feeding post) feeds tas
Sections.
The supply 4o exth section is controlled by
fe cineuit breaker
¥ Sectioning and paralleling post (SP) consist:
of aan and four inferepters
Aoable Fine traction eystem-
interoptors. axe_paralleling, intereip-
tors, IE of up and down tracks
wv The offer +00 infermeptors are bridging inte-
= Ee provided with Te (onde? ai a
ioe Nhage dh
«Bie tau chan ev drops from a
i maintenance & fault corcech)
mer gency )
dering novmel Working- and are Closed
provide sepbly 4o theGdpacenb section ae,
emergency _ohen its 25 41 SfPly is ig infernupted
for ang reason
oT ey EU post is located
at the mid-point between two feeding posts CFP)
X ey phase a YB phase
MSC Chace
Eel ws (sa
al 24 Dean
Tn
Polytechnic Academy Patnaload.nent at Substation (Ts)
ivctit byeakers:- These civeutt breakers
any foot per) F
)_Infervuptor 07 Sener S)
on- automatic we cu
etive relay.
opening and closing: of; ORE
rolsignalling ond lighting
led with automatic Yoltoge reg -
Init he voldoge fluchuations
Seeondory side 2304 I'sV
Pf ave inshument transformers used to.
‘and indicate high volleqes.
‘Stations indicate the con-
s axe needed for 4he oberation,
_tquipment and interr-
ging {zility 16 provided a en.
jemy Patna
aan
oe
Ee level in the transformer is. such
4o stand following tes
ne jo on prima
eae
eae% Oil cooling Arrangement ksing Tadiators. Installation iv
4 ely ¥ During Hensbortation fo protect windings
v Breather - to protect from moisture in air. from moisture, fransfrmass gre, filled withy
¥ Gil lee indicador , dvain velve & filteing] 2 Ths ol hs do be vemoved,and hence He
velve =) Aransformer is dried for_I5 40 2edays.
v Died gangs thermometer
Racca ent t8 914 ee,
ipe- To prevent from high oi] en) fidldrysatieyen pat and_se
cats peas pet rmakts_eacy dhe hed in jar
V Two thermostals 40 indicate vise in tem} eyed carien ssi ates ace
one qves an slay indicahon and 4he other) At drying frecess « the hans former is ready
trips ‘the civcu’t breaker. ‘to beinstatled at the TSS.
Polytechnic [Academy Patnabreokers ave provided» - 12/2 kv of 500 MVR
(1) On the 132 KY primorg side of hanstomer
Gi) Dn the _25 kV secondary side of transformer | ~ OF is cebable of passing following tests:
Gis_Breaking test: |
< On the primary side (G2 KV_dowbe pole bus
c2upler cincut_ breakers ave provided 4o connect 1 C8 HSS
rain bus bar and mainenance (or transfer) bas
bar.
¥ On she secondary side 4h
Sets ofp circuit Breakers
(iy Francformer civeut breaker”
Gi) farder cireuct breakers:
These: ave 25 KV single pole circuit breakers.
v Transformer civcuit breakers on 25 *V
side ave normally closed and rip when Here.
ig any internal fault in the trans former:
v Feeder circuit breakers trip if there is
| any fault in OWE. Polytechnic Aca
are provided 4u0
For,
Gil) Endurance fest - 5+ is of(Bo0o operations)
Of one make followed by 2 brea -
pértalan ov brgenie meeting waloial
‘ov by rewote Control
ning. contects
cee
ea saapeaed by puch.
r Cicwif breaker
VM tach substation following sub y cneut | ¥ ‘508 ee ee ping cast
Tripping time = weloyTransformer. protection relays : - ‘pth Substations Hhrengh « senes EP
1 h 1 The eavth, feslt relay operetes from brs
Series connected CT:
¥ The veley used is Buchhila veley which,
provides ‘protection from —
Gy earth foul
Gi) inter winding faults inside He donsfarmer
¥ dF 15 Simple reliable» Ceonomicel and easy to
meindarn,
) Distance fault protection relay -
v This raley trips the circuit breaker ify amy faulke
occurs Up to a distance on ORE
~The opevakian of His velny dapends on the distance
af Faulk on dectic transmission line.
”
Polytechnic Academy Pat
(2) werload thermal vey -
V9 is provided on the secondary side-
4H gives protection against long peries
overloads
v SFallons she transformer fo operate for
Shecified de @ overloact
C3) Earth fault velay =
ok of The Fersfuney is Connected
by ground eed to He mein eertirg:—
A 35 kV Catenary protection
| TF Pratection system for 25 KV Cotenony
has ea cen.
¥ 25 kV catenory protection Scheme 15
Shown below: -
= Bridging -
ssastahon at
| ea et attr
ee ios Li rae
V7 Fut laed cervent: is tore than hss reat
Corvent iit takes place ok farthest privt -
v Phase angle of traction load is in the.
range Ho to 60".
Polytechnic Academy PatnaLocation & sbacin
The factors which determine location of
Tss and distance between them are giver
bulow:- 9
pela
1 Systm viltape a
For larger system voltage » specing:
between Tss is large-
W This 15 because for larger system witeye
the maxiroum allowed voltape drap oll be large
‘and hence conductor vesistaace sill be large
between substations. fre
“2, Availability of HT: grid lines We. grid fhe.
v Af aT in lines ave near 4o the TSS
sadweel the bus bor veplsion at TSS
This, in effect, reduces dhe Voltage
im af fhe trains, with changing lead.
L
3- Availability of land a
v Transformers, AY suiteh gears , bes bars ete:
fluche-
spacing betaeen TSS con be Ket Inge
traction substations (Tss)
rp
dete lange sh
v So Sufficient
Ietation ob Tss.
4 Sufficient land 15. generally avilable ot gunchone
tnd portant stations
V Se distance buluear, gupthins & stotions determines:
he lneafion and number of Substations
nd 1s Important focby for
ovinit 5 |, Losses in the track Conductor system
V. hasses in the over head conductor (ONC) very
the curvent, resistance o te
3
cin increase im tonductance One
wi) Sea leche Acs oes oad euwent-|
Polytechnic Academy Patnative must jet a Specified mu
e_ farthest point from TS