0% found this document useful (0 votes)
14 views1 page

Julius School 1

Uploaded by

wanjiruf767
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

Julius School 1

Uploaded by

wanjiruf767
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 45 6 7 8 2T16

1 2 3 45 6 7 8 2T16 2T16

33T12-14-150(B2)

33T12-15-150(B2)
42T12-05-150(T1)

42T12-05-150(T1)

42T12-05-150(T1)
8T10-11-200(B2)

16T8-04-200(T2)

16T8-04-200(T2)

16T8-04-200(T2)
28T8-12-200(T2)
13T12-10-150(B2) 35T12-13-150(B2)

A
A T8-01-200 T8-01-200 T8-01-200
33T12-05-150(T1)
B 2T20 3T16 2T20
B 450x200 BEAM FB01 450x200 BEAM FB02 450x200 BEAM FB03

(5) (5)
10T8-07-200(T2) (5)
2T16
(5) (5) (5) (5) (5)
33T12-09-150(B1) 30T8-03-200(T2) 2T20 2T16

C
33T12-05-150(T1)
100T10-02-200(B2)

C T8-01-200 T8-02-200
D
8T12-08-150(B2)
(50) (18)
68T8-01-200A.R.(T1/B1)
T8-01-200
(5) 2T20 2T20
10T8-07-200(T2)
(5)
D 450x200 BEAM FB04 450x200 BEAM FB05 2T16
E 450x200 BEAM FB06

F
7T10-18-200(B2)
E 2T20

7T10-19-200(B2)
6T10-17-200(B2)
2x7T10-20-200A.R.(T2/B2)
42T12-05-150(B2)
13T8-22-200A.R.(T1/B1) F
SEC. C1B-C1B SEC. C2B-C2B
SCALE 1:10 SCALE 1:10 (5) (5) (6) T8-01-200
16T8-04-200(T2)

3T20
33T12-06-150(B2) 7T10-23-200(B2) 450x200 BEAM FB07
6T10-17-200(B2)

1
G
42T12-05-150(T1)
G 08 2T20
3T20
2T20

2T20

(5) (5) (6) 3T30


SEC. C1A-C1A SEC. C2A-C2A 16T8-04-200(T2)
SCALE 1:10 SCALE 1:10
T8-01-200
08 2T20
450x200 BEAMFB08
2T20
SEC. 08-08
H 1ST FLOOR SLAB DETAILS D B A
SCALE 1:25 SCALE 1:25
43T8-01-200A.R.(T1/B1)
67T12-02-150(B1)
H 09A 09B 2T16 2T16
20T8-03-200(T2)
2T16
2T16
1ST FLOOR BEAM LAYOUT 3T30
T8-01-200
T8-01-200
09A 09B 2T20
450x200 BEAMFB09 2T20

Truss T14
SEC. C2-C2 SEC. C2-C2 SEC. 09A-09A 2T20

13
H
ip

sT
SCALE 1:20 SCALE 1:20
SEC. 09B-09B

Tr

us

5
us

Truss T8

Truss T8

Truss T8

Truss T8

Truss T8

Truss T8

Truss T7

Truss T6
Tr

sT
s
D B

T1

us
ip
SEC. C1-C1

Tr
3
SCALE 1:20

ip
2T16 2T16

H
Truss T12 10A 10B
Truss T4 2T16
2T16
Truss T12 3T30
Truss T1 T8-01-200

H
Truss T11 T8-01-200

ip
Tr
10A 10B 2T20 2T20

T3
us
Truss T2 SEC. 10A-10A

ss
450x200 BEAMFB10

sT
2T20

u
Tr
9
Truss T10 SEC. 10B-10B

y
E D B

le
al
V
SCALE 1:25 SCALE 1:25 Truss T1 2T16 2T16

V
al
11A 11B

le
y
2T16

Tr
Truss T8
B2
B2

us
SCALE 1:25 2T16
2T16

sT
Truss T1 3T30

5
T8-01-200
Truss T8
T8-01-200 T8-01-200

11A 11B 2T20 2T20


C1 C1 SEC. 11A-11A
450x200 BEAMFB11 2T20
C2 C2 Truss T8
2T20 2T12 SEC. 11B-11B
C1 2T16
450x200
TYP. ROOR BEAM
TYPICAL BASE B3 Truss T8 01
TYPICAL BASE B1 TYPICAL BASE B2 01
SCALE 1:50 SCALE 1:50
SCALE 1:50 02 02 T8-01-200 T8-03-200
Truss T6 03 1ST TO 4TH FLOOR AND ROOF SLAB DETAILS
04 05 03 3T20 12T12
04 05 450x200 BEAM FB12 450x200 BEAM FB13 1.SCALE
This 1:100
drawing should NOT be scaled.
s T5

2. Concrete cover to reinforcement steel to be:


us
Tr

Truss T1

Truss T1

Truss T1
Truss T2
Truss T4

TRUSS TYPE T1 Foundations = 50mm


ip

TRUSS TYPE T8
H

1 2 3 45 6 7 8 Columns = 40mm
Beams = 25mm
Slabs =20mm
3. Concrete strength for structural concrete members to be
A class 25, (1:1.5:3 mix) and 1:2:4 mix for strip footings
B1 B1 B1 4. Square twisted steel reinforcement bars to BS4461 denotes ``Y'
ROOF STRUCTURE LAYOUT
5. Mild steel reinforcement bars to B.S.4449 are denoted " R ".
B B1 B1 B1 B1 6. All timber to be grade II in accordance with KS 02-94: 1989.
B1

01
11 10
PROJECT;
02 10
03 03 10 PROPOSED FPFK KABIRIA
04 PHILADELPHIA SCHOOL ON
03 06
C 04 05 06
03
09 04
06
PLOT L.R. No. DAGORETTI / WAITHAKA 999
01

B1 04
04 08 03 (FREE PENTECOSTAL FELLOWSHIP IN
09
D TRUSS TYPE T12
04
04 08 KENYA REGISTERED TRUSTEES OF
01

07
05 06 CLIENT; P.O. BOX 5230 NAIROBI
05 06
E 04 03
08
07
FPFK PHILADELPHIA SCHOOL
B3 B2 B2 B2 02
04 13T10-03-200(B2)
F B3
7T12-01-150(T1/B1)
B1
7T12-01-150(T1/B1)
STRUCTURAL DETAILS
B1 B1 DETAIL 01 DETAIL 04 SECTION S1-S1 7T12-01-150(T1/B1)
02 02
SECTION S2-S2
S.M.K DRAWN; J.R.

7T12-09-150(B1) As shown DRG No.;

7T12-11-150(B1)
7T12-06-150(B1)
G
7T12-10-150(B1)

HARDCORE
DETAIL 02 4T10-04-250(T2) 4T10-04-250(T2)

7T12-06-150(B1)
B1 B2 B1
DETAIL 05 down (2) 4T10-08-250(T2)
4T10-04-250(T2) 4T10-04-250(T2)
13T10-03-200(B2)
1:4:8 BLINDING
T10-01-200(B) down (2) 4T10-08-250(T2)
13T10-03-200(B2)
01 01 3T10-02-200(B)
7T10-07-200(B2)
7T12-01-150(B1)

S1 13T10-03-200(B2) 9T12-05-150(B1/T1)
S1 8T10-07-200(B2)

7T12-01-150(B1)

7T12-01-150(B1)
TYPICAL SECTION 03-03
7T12-02-150(B1)

TYPICAL SECTION 01-01 SECTION 02-02 up S2 13T10-03-200(B2)


S2

9T12-05-150(B1/T1)
SCALE 1:50

7T12-02-150(B1)
SCALE 1:50 4T10-04-250(T2) up
4T10-04-250(T2) 4T10-04-250(T2)
DETAIL 03 4T10-04-250(T2)
4T10-04-250(T2) 4T10-04-250(T2)
H DETAIL 06
B1 B2 B1
FOUNDATION LAYOUT STAIRCASE S1 LAYOUT
SCALE 1:100 STAIRCASE S2 LAYOUT

You might also like