Elect Format 1

Uploaded by

dharm6697
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 30

Measurement of M.

S Conduit

DOC. NO.:-KPIL/NRL/EIL/PNCPL/E&I IR/ F-02, REV.0


PROJECT - PNCPL -PART - B PIPELINE PROJECT
CLIENT- NUMALIGARH REFINARY LIMITED. Date-

CONSULTANT- ENGINEERS OF INDIA LTD. Report no.

CONTRACTOR- KALPATARUPROJECTS INTERNATIONAL LTD.(FORMERLYKALPATARU POWER TRANSMISSION LTD.) WEATHER

LOCATION / AREA

Point Wiring
Submains/ Power & Light Plug From To
S NO Area Conduit Size Length Conduit Size Length REMARKS
Point
Two Point One
One Point One Switch
Switch

L
P Y
AM P
S CO
E
Total
Length
KPIL EIL/NRL

SIGN:

NAME:
DATE:
Inspection report for Conduiting (Slab/Wall)& Wiring Work

DOC. NO.KPIL/NRL/EIL/PNCPL/E&I/IR - F - 01 REV- 00

PROJECT-PNCPL - PART - B PIPELINE PROJECT DATE :

CLIENT- NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT- ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU POWER PROJECTS INTERNATIONAL LTD.(FORMERLY) KALPATARU POWER TRANSMISSION LIMITED

REF. DRG / DOC


Location / Area
Sl No. DESCRIPTION OBSERVATION REMARKS
1 CONDUITING
1.1 Visual check of material
1.2 Routing of conduit & location of junction boxes

1.3 Proper clamping of conduit with clamp .

S.No Area/Location Size of Conduit Length Remarks

PL Y
2 WIRING

AM P
S CO
2.1 Identification of circuit check.
2.2 Check the size of wire & colour code
2.3 Check the earth continuity
2.4
2.5
2.6
Insulation test
Testing of earth continuity
Earthing of switch boxes
E
Remarks if any

CHECKED & VERIFIED BY


KPIL EIL/NRL

SIGNATURE

NAME
DATE
INSPECTION REPORT FOR INSTALLATION, TESTING & COMMISSIONING OF EXTERNAL,INTERNAL
LIGTHING/LIGHTIN POLE/EX- FAN & FAN

DOC. NO.:- KPIL/NRL/EIL//PNCPL/E&I/IR/F-00, REV.0


PROJECT-PNCPL - PART - B- PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED REPORT NO :

CONSULTANT - ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD.(FORMERLYKALPATARU POWER TRANSMISSION LIMITED) Location / Area

REF. DRG / DOC

S No. DESCRIPTION OBSERVATION


1 Mechanical damage:
2 Check proper installation of fittings/fixtures/fan/E. fan
3 Check proper installation of Swicthes / Sockets
4 Installtion of lighting poles (Street & hazadus area)
5 Check proper installation of fittings/fixtures
6 Check proper installation LDB/FLP JBs
7 Circuit continuity:
8 Check proper earthing with fittings/fixtures & DBs/JBs
9 Check the operation of fittings/fixtures with lighting DB / JBs

S No. Area/Location Type of Fitting / Fixture/Pole /EX - Fan &Ceiling Fan Qty Remarks

PL Y
AM P
S CO
E
Remarks if any

CHECKED & VERIFIED BY


KPIL EIL/NRL

SIGNATURE

NAME
DATE
INSPECTION REPORT FOR BURRIED CABLE TRENCH/ RCC CABLE TRENCH

DOC. NO.:- KPTL/E&I/DHPL/IR/F-02, REV.0


PROJECT-DOBHI-DURGAPUR-HALDIA PIPELINE PROJECT DATE :

CLIENT: GAS AUTHORITY INDIA LIMITED. REPORT NO :

CONSULTANT- ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU POWER TRANSMISSION LIMITED LOCATION-

REF. DRG / DOC

BURRIED TRENCH DIMENSION IN MM


TYPE OF CABLE DRESSING / SAND BRICKS
SL.NO CABLE ROUTE CABLE TAG NO. BACKFILLING REMARKS
TRENCH (RCC/DB) LENGTH WIDTH DEPTH BEDDING COVERING

PL Y
AM P
S CO
E

Remarks if any

CHECKED & VERIFIED BY


KPTL EIL/GAIL

SIGNATURE

NAME

DATE
INSPECTION REPORT FOR IR VALUE OF CABLE (BEFORE/AFTER) LAYING

DOC. NO.:-KPIL/NRL/PNCPL/E& I /IR/F-05, REV.0


PROJECT-PNCPL- PART-B- PIPELINE PROJECT

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT- ENGINEERS OF INDIA LTD. DATE:

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD.(FORMERLY) KALPATARU POWER TRANSMISSION LIMITED WEATHER :

LOCATION / AREA

REF. DRG / DOC


Insulation Testing Equipment
Modal No : Serial No :
Manufacture Name:
Calibration Date: Expiry Date : Test Voltage :

CABLE CABLE SIZE CABLE VOLTAGE


INSULATION RESISTANCE IN M.OHMS
SL.NO DRUM/CABLE TAG NO. TYPE CONTINUITY REMARKS
FROM TO
NO. OF
SIZE (MM2)
LENGTH GRADE
R-E Y-E B-E R-Y Y-B B-R RYB-N N-E
CORES

PL Y
AM P
S CO
E

Remarks if any

CHECKED & VERIFIED BY


KPIL EIL/NRL

SIGNATURE

NAME

DATE
INSPECTION REPORT FOR CABLE LAYING

DOC.NO.KPIL/NRL/EIL/PNCPL/E& I /IR/F-06, REV - 0

PROJECT: PNCPL - PART B - PIPELINE PROJECT

CLIENT: NUMALIGARH REFINARY LIMITED. DATE :

CONSULTANT: ENGINEERS OF INDIA LTD. REPORT NO :

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD. WEATHER :

LOCATION / AREA

REF. DRG / DOC

SL.NO INSPECTION ITEM OBSERVATION REMARKS


Physical checks :
1 No physical damage.
2 Proper laying and dressing.
3 Cable tray supports are adequate.
4 Glanding is proper.
5 Type & size of lugs
6 Insulation resistance test :

S.No. Cable Tag No. Cable Size Cable Length Cable From Cable To Continuity Remarks

PL Y
AM P
S CO
E
Remarks if any

CHECKED & VERIFIED BY


KPTL EIL/GAIL

SIGNATURE

NAME
DATE
INSPECTION REPORT FOR CABLE TERMINATION

DOC. NO.:-KPIL/EIL/E&I/PNCPL/IR/F- 00, REV.0


PROJECT-PNCPL - PART B - PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT: ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD. LOCATION-

REF. DRG / DOC.

SL.NO INSPECTION ITEM


PY
OBSERVATION

O
REMARKS

C
1 Verification of respective Post cable laying reports

2 Visual check

L E
P
3 Proper cable setting

4 Check loose connection

AM
5

6
Correct phase sequence

Proper Glanding
S
7 Proper tags on terminal, cable cores & cross ferruling check

Remarks if any

CHECKED & VERIFIED BY


KPTL EIL/GAIL

SIGNATURE

NAME
DATE
INSPECTION REPORT FOR INSTALLATION OF LT PANELS / DISTRIBUTION BOARDS

DOC. NO. KPIL/NRL/EIL/PNCPL/ELE / IR / F-07, REV.0

PROJECT-PNCPL - PART - B- PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT- ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU POWER TRANSMISSION LIMITED

REF. DRG / DOC MANUFACTURER SERIAL NO :

Insulation Testing Equipment


Modal No : Serial No :
Manufacture Name:

Calibration Date: Expiry Date : Test Voltage:

SL.NO INSPECTION ITEM OBSERVATION REMARKS


1 Proper Alignment of panels

PL Y
2 Proper support of panels
3 Proper earthing of panels

M P
4 Check all connection for tightening of wires, busbars, etc.

A
5 Proper termination of cable
6

7
Main Busbar Connection and Alignment

Power and Control fuse function S CO


E
8 Sealing of Unused hole

9 Polarity ratio test

10 Cleaning of Panels

11 IR Value

R-E Y-E B-E N-E R-Y Y-B B-R R-N Y-N B-N

Remarks if any

CHECKED & VERIFIED BY


KPTL EIL/GAIL

SIGNATURE

NAME
DATE
INSPECTION REPORT FOR INSTALLATION OF LIGHTING DISTRIBUTION BOARDS / JUNCTION BOX / WR

DOC. NO.:-KPIL/EIL/E&I/PNCPL/IR/F-00, REV.0

PROJECT: PNCPL - PART - B- PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT: ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU POWER TRANSMISSION LIMITED LOCATION:

LOCATION / AREA
REF. DRG / DOC
Insulation Testing Equipment Manufacture
Modal No : Serial No :
Name:
Calibration Date: Expiry Date : Test Voltage:

SL.NO INSPECTION ITEM OBSERVATION REMARKS


1 Proper Alignment
2 Proper earthing of

3 Check all connection for tightening of wires, busbars, etc.

4 Proper termination of wires & cable

5 Wiring as per drawing:


Operation of ELCB/MCCB/MCB

PL Y
6

7 Fitting of accessories & tightness

M
8 IR Value in M ohm

S. No.
Lighting/Power Distribution
Location R-Y Y-B

A P
B-R R-N/E Y-N/E B-N/E Remarks

S CO
Board No.

E
Remarks if any

CHECKED & VERIFIED BY


KPIL EIL/GAIL

SIGNATURE

NAME
DATE
INSPECTION REPORT FOR EARTHING

DOC. NO.:-KPIL/NRL/EIL/PNCPL/E&I/IR/F- 00, REV.0

PROJECT- PNCPL - PART - B - PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT- ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR:KALPATARO PROJECTS INTERNATIONAL LTD. LOCATION-

REF. DRG / DOC


Insulation Testing
Equipment Manufacture Modal No : Serial No :
Name:
Calibration Date: Expiry Date : Test Voltage :

SL.NO INSPECTION ITEM OBSERVATION REMARKS

Earth electrode , Pit & their connections are to be checked for


1
proper installation
2 Check all the connections to be tightened
3 Check the dimensions of earth strip
4 Check the welding of earth strip
5 Continuity test for earthing conductor.

No of Earth
S. No. Location / Area Size of Earth Strips Length of Strips Electrodes / Remarks
Busbar

L E
P
AM P Y
S CO
Remarks if any

CHECKED & VERIFIED BY

KPIL EIL/NRL

SIGNATURE

NAME

DATE
INSPECTION REPORT FOR EARTH RESISTANCE TEST

DOC. NO.:-KPIL/NRL/EIL/PNCPL/E&I \IR/F-5, REV.0


PROJECT- PNCPL - PART - B- PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT- ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU [PROJECTS INTERNATIONAL LTD.(FORMERLY)KALPATARU POWER TRANSMISSION LIMITED LOCATION-

REF. DRG / DOC

Insulation Testing Equipment Manufacture Name: Modal No : Serial No :

Calibration Date: Expiry Date : Test Voltage :

EARTH RESISTANCE
SL.NO AREA / LOCATION EARTH PIT NO. REMARKS
WITH OUT GRID WITH GRID

PL Y
AM P
S CO
Remarks if any
E
CHECKED & VERIFIED BY

KPIL EIL/NRL

SIGNATURE

NAME
DATE
INSPECTION REPORT FOR BATTERY CHARGER

DOC. NO. KPIL/NRL/EIL/PNCPL/E&I /IR/F-00, REV.0


PROJECT- PNCPL-PART- B - PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT- ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD.

REF. DRG / DOC .

LOCATION /AREA

SL.NO INSPECTION ITEM OBSERVATION REMARKS

1 Proper alignment of Battery Charger

2 Checking the proper connection / wiring L


P Y
3 Sequence & transfer test

AM P
4 IR check
S CO
E

Remarks

CHECKED & VERIFIED BY


KPIL EIL/NRL

SIGNATURE

NAME

DATE
INSPECTION REPORT FOR COMMISSIONING OF LT PANELS / DISTRIBUTION BOARDS

DOC. NO.:-KPIL/EIL/NRL/E&I/PNCPL/IR/F-00, REV.0

PROJECT: PNCPL-PART- B - PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT: ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD. LOCATION:

REF. DRG / DOC .

Insulation Testing Equipment


Modal No : Serial No :
Manufacture Name:
Calibration Date: Expiry Date : Test Voltage :

SL.NO INSPECTION ITEM OBSERVATION REMARKS

Verification of Inward Inspection report/Pre-commissioning report & check

PL Y
1
list
2 Permanent installation

M P
3 Input supply available & termination complete

A
4 Check the cleanness inside the panel

S CO
5 All bolted connection inspected for tightness

6 All input / out put wiring sized correctly

E
7 Proper termination of cable and wiring continuity.
9 Check all connection are tightened

9 Proper earthing of panel

10 IR check of incoming and out going cables

TESTS :
Sr No. ACTIVITY REMARKS
FUNCTIONAL TEST OF
a) Voltmeter
1 b) AMP meter
c) KWH meter
d) PF meter
2 Check O/P supply at each individual feeder
STATUS COMMENTS :

A ACCEPTED

B ACCEPTED AS NOTED

C NOT ACCEPTED

Remarks if any

CHECKED & VERIFIED BY


KPIL EIL/NRL

SIGNATURE

NAME

DATE
INSPECTION REPORT FOR INSTALLATION OF TRANSFORMERS

DOC. No. - KPIL/NRL/EIL/PNCPL/E&I /IR/F - 00, REV.0

PROJECTPNCPL : PART- B - PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT: ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD. LOCATION:

LOCATION / AREA.

REF. DRG / DOC.


Insulation Testing Equipment Manufacture
Modal No : Serial No :
Name:
Calibration Date: Expiry Date : Test Voltage:

SL.NO INSPECTION ITEM OBSERVATION REMARKS


1 Proper Alignment
2 Proper earthing of

PL Y
3 Check all connection for tightening of wires, etc.

4 Proper termination of cableS

5 Wiring as per drawing:

AM P
S CO
6
Damage,paint & crack check
7 lable/marking rating plate correctness check

S. No. TRANSFORMER NO Rating of Transformer Quantity Location EPrimary winding


Insulation resistance
check
Secondary winding
Insulation resistance
check
Winding
resistance
Ratio
measurement
Remarks

Remarks if any

CHECKED & VERIFIED BY


KPTL EIL/NRL

SIGNATURE

NAME

DATE
INSPECTION REPORT FOR LIGHTNING PROTECTION

DOC. NO.:-KPIL/EIL/NRL/E&I/PNCPL/IR/F-00, REV.0


PROJECTPNCPL : PART- B - PIPELINE PROJECT

CLIENT: NUMALIGARH REFINARY LIMITED. DATE :

CONSULTANT: ENGINEERS OF INDIA LTD. REPORT NO :

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD. WEATHER :

LOCATION / AREA

REF. DRG / DOC


Insulation Testing Equipment
Modal No : Serial No :
Manufacture Name:
Calibration Date: Expiry Date : Test Voltage :

SL.NO INSPECTION ITEM OBSERVATION REMARKS

1 EARTH ELECTRODE NETWORK

1.1 Installed as per Drawing

1.2 Earth electrode , Pit & their connections are to be checked for proper installation

1.3 Check the dimensions of earth strip


1.4 Check the welding of earth strip

PL Y
1.5 Check the welding of earth strip
2 LIGHTNING PROTECTION EQUIPMENT

M
2.1 Installed as per Drawing

2.2 Locations correct and fixing secure

A P
2.3
2.4
Earth taps and down conductors as per specification
Taps and conductors securely fixed S CO
E
2.5 Conductors cross connection and bonding tight
2.6 Disconnect fecilities installed
2.7 Connection to earth network as per drawing

Remarks if any

CHECKED & VERIFIED BY


KPIL EIL / NRL

SIGNATURE

NAME
DATE
INSPECTION REPORT FOR INSTALLATION OF BUS DUCT

KPIL/EIL/NRL/E&I/PNCPL/IR/F-00, REV.0

PROJECTPNCPL : PART- B - PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT: ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD. LOCATION-

LOCATION / AREA

REF. DRG / DOC


Insulation Testing Equipment Manufacture
Modal No : Serial No :
Name:
Calibration Date: Expiry Date : Test Voltage:

PL Y
SL.NO INSPECTION ITEM OBSERVATION REMARKS

1 Damage,paint & crack check


2 Busduct lines are aligned in plumb in case of riser & at zero level in case of horizontal run of busduct

3 Check whether all the joint bolts are sheared @14-15 kg-m. and tightening of joint bolt

AM P
4
S CO
Check whether earthing run along with Bus duct is physically connected to both the ends of the busduct flanged & equipment.

E
5 Check whether all the bolts at Flanged end are tightened
Check whether all the supports to the risers and bus duct line are installed properly to carry the tue required weight of Busduct
6

7 Check whether the entire name plates on Tap Off Box & panels indicating outgoing location of supply.

8 Check whether earthing wire is connected to Tap Off Box door & bus duct housing.

Insulation resistor
Quantity/
BUS DUCT Rating of Bus duct LENGTH
Location
S. No. R-N Y-N B-N R-E Y-E B-E N-E R-Y R-B B-Y

Remarks if any

CHECKED & VERIFIED BY


KPIL EIL/NRLL

SIGNATURE

NAME

DATE
INSPECTION TEST PLAN FOR INSTALLATION, TESTING & COMMISSIONING OF

DOC. NO.:-KPTL/E&I/DHPL/ITP/F-01, REV.0

Project PROJECT-DOBHI-DURGAPUR-HALDIA PIPELINE PROJECT

Client CLIENT: GAS AUTHORITY INDIA LIMITED.

CONSULTANT ENGINEERS OF INDIA LTD.


CONTRACTOR KALPATARU POWER TRANSMISSION LTD.
Document
:
Number

Record to be submitted by
Sr. No. Activity Description Inspection KPTL Verification by EIL
KPTL

1.0 APPROVAL OF PROCEDURE H AP

2.1 INSTALLATION OF LIGHTING FIXTURE


Installtion of lighting poles (Street & hazadus area) W RM
2.2 Check the type and rating of the lighting fixtures & Sr No. of FLP JBs/Fittings etc. W RM
2.3 Check the mounting height of lighting fixtures W RM
2.4 Operation check of lighting fixtures assembly. W RM
3.0 CABLE LAYING
3.1 Insulation test W RM
3.2 a. Phase to Phase. W RM
3.3 b. Phase to Neutral. W RM
3.4 c. Phase& Neutral to Armour. W RM
3.5 Continuity test W RM
3.6 Trench / cable tray check W RM
3.7 Dressing / Sand bedding / Bricks covering W RM
4.0 CABLE GLANDING & TERMINATION
4.1 Proper cable setting W RM
4.2 Check Loose connection W RM
4.3 Proper glanding W RM
4.4 Check cable cross ferrule / identification tags W RM
5.0 EARTHING SYSTEM W RM

5.1 Earth electrode , Pit & their connections are to be checked for proper installation W RM

5.2 Check all the connections are tightened. W RM


5.3 Check the electrode result. W RM
5.4 Measurement of earth resistance of W RM
5.5 Earth electrodes ( Individual & Grid ) W RM
6.0 PANEL INSTALLATION & TESTING
6.1 Proper Alignment & support of panels including (I/D,O/D LDB). W RM
6.2 Proper earthing of panels W RM
6.3 Check all connection should be tightened. W RM
6.4 Proper termination of cable and wiring continuity will be carried out. W RM
6.5 All metering Instruments functionality check will be done. W RM
6.6 Phase sequence check in MEDB shall be checked. W RM
6.7 All protection, alarm, annunciation system, metering test W RM
6.8 I/R of all CBs, bus bar, I/C & O/G cables W RM
6.9 Polarity and ratio test of all CTs & PTs W RM

Legend
W : Witness. AP :Approval
RM : Random Checking & Witnesss H :Hold
R : Review Documents.
CHECKED & VERIFIED BY
KPIL EIL/NRL

SIGNATURE

NAME

DATE

Page 26 of 30
INSPECTION REPORT FOR INSTALLATION OF LT PANEL / DISTRIBUTION BOARD

DOC. NO. KPIL/NRL/EIL/PNCPL/E& I / IR / F-09, REV.0

PROJECT-PNCPL - PART - B- PIPELINE PROJECT DATE :

CLIENT: NUMALIGARH REFINARY LIMITED. REPORT NO :

CONSULTANT- ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU POWER TRANSMISSION LIMITED

REF. DRG / DOC MANUFACTURER SERIAL NO :

Insulation Testing Equipment


Modal No : Serial No :
Manufacture Name:

Calibration Date: Expiry Date : Test Voltage:

SL.NO INSPECTION ITEM OBSERVATION REMARKS


1 Proper Alignment of panels

PL Y
2 Proper support of panels
3 Proper earthing of panels

M P
4 Check all connection for tightening of wires, busbars, etc.

A
5 Proper termination of cable
6

7
Main Busbar Connection and Alignment

Power and Control fuse function S CO


E
8 Sealing of Unused hole

9 Polarity ratio test

10 Cleaning of Panels

R-E Y-E B-E N-E R-Y Y-B B-R R-N Y-N B-N

Remarks if any

CHECKED & VERIFIED BY


KPTL EIL/GAIL

SIGNATURE

NAME

DATE
INSPECTION REPORT FOR INSTALLATION OF PV SOLAR MODULE

DOC. No. - KPIL/NRL/EIL/PNCPL/ELE/IR/F - 00, REV.0


PROJECT: PNCPL- PART- B - PIPELINE PROJECT

CLIENT: NUMALIGARH REFINARY LIMITED.

CONSULTANT: ENGINEERS OF INDIA LTD.

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD.

LOCATION / AREA

REF. DRG / DOC.

SL.NO INSPECTION ITEM

L E
P
1 Proper Alignment
2 Proper earthing of
3
4
Check all connection for tightening of wires, etc.
Proper termination of cableS

AM P Y
S CO
5 Wiring as per drawing:
6 Damage,paint & crack check
7 lable/marking rating plate correctness check
S. No. PV Solar Module No. Rating of PV Solar Module Quantity Location Remarks

Remarks if any

CHECKED & VERIFIED BY


KPIL EIL/NRL
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR INSTALLATION OF PV SOLAR MODULE

DOC. No. - KPIL/NRL/EIL/PNCPL/ELE/IR/F - 0, REV.0

PROJECTPNCPL- PART- B - PIPELINE PROJECT

CLIENT: NUMALIGARH REFINARY LIMITED.

CONSULTANT- ENGINEERS OF INDIA LTD.

CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD.

LOCATION / AREA

REF. DRG / DOC


P Y
SL.NO INSPECTION ITEM

C O
E
1 Proper Alignment

L
2 Proper earthing of

P
3 Check all connection for tightening of wires, etc.

M
4 Proper termination of cableS

A
5 Wiring as per drawing:

8
Damage,paint & crack check
lable/marking rating plate correctness check S
S. No. PV Solar Module No. Rating of PV Solar Module Quantity Location Remarks

Remarks if any

CHECKED & VERIFIED BY


KPIL EIL/NRL

SIGNATURE

NAME

DATE
INSPECTION REPORT FOR COMMISSIONING OF LT PANELS / DISTRIBUTION
BOARDS

DOC. NO.:-KPIL/NRL/EIL/ PNCPL/E&I/IR/F-00, REV.0

PROJECT-DOBHI-DURGAPUR-HALDIA PIPELINE PROJECT DATE :

CLIENT: GAS AUTHORITY INDIA LIMITED. REPORT NO :

CONSULTANT- ENGINEERS OF INDIA LTD. WEATHER :

CONTRACTOR: KALPATARU POWER TRANSMISSION LIMITED LOCATION-

REF. DRG / DOC

SL.NO INSPECTION ITEM

L E OBSERVATION REMARKS

1
P
Verification of Inward Inspection report/Pre-commissioning report & check

Y
list
2 Permanent installation
M P
SA C O
3 Input supply available & termination complete
4 Check the cleanness inside the panel

5 All bolted connection inspected for tightness

6 All input / out put wiring sized correctly


7 Proper termination of cable and wiring continuity.
9 Check all connection are tightened

9 Proper earthing of panel

10 IR check of incoming and out going cables

TESTS :
Sr No. ACTIVITY REMARKS
FUNCTIONAL TEST OF
a) Voltmeter
1 b) AMP meter
c) KWH meter
d) PF meter
2 Check O/P supply at each individual feeder
STATUS COMMENTS :

A ACCEPTED
B ACCEPTED AS NOTED

C NOT ACCEPTED

Remarks if any

CHECKED & VERIFIED BY

KPIL EIL/ NRL

SIGNATURE

NAME

DATE