Elect Format 1
Elect Format 1
S Conduit
LOCATION / AREA
Point Wiring
Submains/ Power & Light Plug From To
S NO Area Conduit Size Length Conduit Size Length REMARKS
Point
Two Point One
One Point One Switch
Switch
L
P Y
AM P
S CO
E
Total
Length
KPIL EIL/NRL
SIGN:
NAME:
DATE:
Inspection report for Conduiting (Slab/Wall)& Wiring Work
CONTRACTOR: KALPATARU POWER PROJECTS INTERNATIONAL LTD.(FORMERLY) KALPATARU POWER TRANSMISSION LIMITED
PL Y
2 WIRING
AM P
S CO
2.1 Identification of circuit check.
2.2 Check the size of wire & colour code
2.3 Check the earth continuity
2.4
2.5
2.6
Insulation test
Testing of earth continuity
Earthing of switch boxes
E
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR INSTALLATION, TESTING & COMMISSIONING OF EXTERNAL,INTERNAL
LIGTHING/LIGHTIN POLE/EX- FAN & FAN
CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD.(FORMERLYKALPATARU POWER TRANSMISSION LIMITED) Location / Area
S No. Area/Location Type of Fitting / Fixture/Pole /EX - Fan &Ceiling Fan Qty Remarks
PL Y
AM P
S CO
E
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR BURRIED CABLE TRENCH/ RCC CABLE TRENCH
PL Y
AM P
S CO
E
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR IR VALUE OF CABLE (BEFORE/AFTER) LAYING
CONTRACTOR: KALPATARU PROJECTS INTERNATIONAL LTD.(FORMERLY) KALPATARU POWER TRANSMISSION LIMITED WEATHER :
LOCATION / AREA
PL Y
AM P
S CO
E
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR CABLE LAYING
LOCATION / AREA
S.No. Cable Tag No. Cable Size Cable Length Cable From Cable To Continuity Remarks
PL Y
AM P
S CO
E
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR CABLE TERMINATION
O
REMARKS
C
1 Verification of respective Post cable laying reports
2 Visual check
L E
P
3 Proper cable setting
AM
5
6
Correct phase sequence
Proper Glanding
S
7 Proper tags on terminal, cable cores & cross ferruling check
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR INSTALLATION OF LT PANELS / DISTRIBUTION BOARDS
PL Y
2 Proper support of panels
3 Proper earthing of panels
M P
4 Check all connection for tightening of wires, busbars, etc.
A
5 Proper termination of cable
6
7
Main Busbar Connection and Alignment
10 Cleaning of Panels
11 IR Value
R-E Y-E B-E N-E R-Y Y-B B-R R-N Y-N B-N
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR INSTALLATION OF LIGHTING DISTRIBUTION BOARDS / JUNCTION BOX / WR
LOCATION / AREA
REF. DRG / DOC
Insulation Testing Equipment Manufacture
Modal No : Serial No :
Name:
Calibration Date: Expiry Date : Test Voltage:
PL Y
6
M
8 IR Value in M ohm
S. No.
Lighting/Power Distribution
Location R-Y Y-B
A P
B-R R-N/E Y-N/E B-N/E Remarks
S CO
Board No.
E
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR EARTHING
No of Earth
S. No. Location / Area Size of Earth Strips Length of Strips Electrodes / Remarks
Busbar
L E
P
AM P Y
S CO
Remarks if any
KPIL EIL/NRL
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR EARTH RESISTANCE TEST
EARTH RESISTANCE
SL.NO AREA / LOCATION EARTH PIT NO. REMARKS
WITH OUT GRID WITH GRID
PL Y
AM P
S CO
Remarks if any
E
CHECKED & VERIFIED BY
KPIL EIL/NRL
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR BATTERY CHARGER
LOCATION /AREA
AM P
4 IR check
S CO
E
Remarks
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR COMMISSIONING OF LT PANELS / DISTRIBUTION BOARDS
PL Y
1
list
2 Permanent installation
M P
3 Input supply available & termination complete
A
4 Check the cleanness inside the panel
S CO
5 All bolted connection inspected for tightness
E
7 Proper termination of cable and wiring continuity.
9 Check all connection are tightened
TESTS :
Sr No. ACTIVITY REMARKS
FUNCTIONAL TEST OF
a) Voltmeter
1 b) AMP meter
c) KWH meter
d) PF meter
2 Check O/P supply at each individual feeder
STATUS COMMENTS :
A ACCEPTED
B ACCEPTED AS NOTED
C NOT ACCEPTED
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR INSTALLATION OF TRANSFORMERS
LOCATION / AREA.
PL Y
3 Check all connection for tightening of wires, etc.
AM P
S CO
6
Damage,paint & crack check
7 lable/marking rating plate correctness check
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR LIGHTNING PROTECTION
LOCATION / AREA
1.2 Earth electrode , Pit & their connections are to be checked for proper installation
PL Y
1.5 Check the welding of earth strip
2 LIGHTNING PROTECTION EQUIPMENT
M
2.1 Installed as per Drawing
A P
2.3
2.4
Earth taps and down conductors as per specification
Taps and conductors securely fixed S CO
E
2.5 Conductors cross connection and bonding tight
2.6 Disconnect fecilities installed
2.7 Connection to earth network as per drawing
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR INSTALLATION OF BUS DUCT
KPIL/EIL/NRL/E&I/PNCPL/IR/F-00, REV.0
LOCATION / AREA
PL Y
SL.NO INSPECTION ITEM OBSERVATION REMARKS
3 Check whether all the joint bolts are sheared @14-15 kg-m. and tightening of joint bolt
AM P
4
S CO
Check whether earthing run along with Bus duct is physically connected to both the ends of the busduct flanged & equipment.
E
5 Check whether all the bolts at Flanged end are tightened
Check whether all the supports to the risers and bus duct line are installed properly to carry the tue required weight of Busduct
6
7 Check whether the entire name plates on Tap Off Box & panels indicating outgoing location of supply.
8 Check whether earthing wire is connected to Tap Off Box door & bus duct housing.
Insulation resistor
Quantity/
BUS DUCT Rating of Bus duct LENGTH
Location
S. No. R-N Y-N B-N R-E Y-E B-E N-E R-Y R-B B-Y
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION TEST PLAN FOR INSTALLATION, TESTING & COMMISSIONING OF
Record to be submitted by
Sr. No. Activity Description Inspection KPTL Verification by EIL
KPTL
5.1 Earth electrode , Pit & their connections are to be checked for proper installation W RM
Legend
W : Witness. AP :Approval
RM : Random Checking & Witnesss H :Hold
R : Review Documents.
CHECKED & VERIFIED BY
KPIL EIL/NRL
SIGNATURE
NAME
DATE
Page 26 of 30
INSPECTION REPORT FOR INSTALLATION OF LT PANEL / DISTRIBUTION BOARD
PL Y
2 Proper support of panels
3 Proper earthing of panels
M P
4 Check all connection for tightening of wires, busbars, etc.
A
5 Proper termination of cable
6
7
Main Busbar Connection and Alignment
10 Cleaning of Panels
R-E Y-E B-E N-E R-Y Y-B B-R R-N Y-N B-N
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR INSTALLATION OF PV SOLAR MODULE
LOCATION / AREA
L E
P
1 Proper Alignment
2 Proper earthing of
3
4
Check all connection for tightening of wires, etc.
Proper termination of cableS
AM P Y
S CO
5 Wiring as per drawing:
6 Damage,paint & crack check
7 lable/marking rating plate correctness check
S. No. PV Solar Module No. Rating of PV Solar Module Quantity Location Remarks
Remarks if any
LOCATION / AREA
C O
E
1 Proper Alignment
L
2 Proper earthing of
P
3 Check all connection for tightening of wires, etc.
M
4 Proper termination of cableS
A
5 Wiring as per drawing:
8
Damage,paint & crack check
lable/marking rating plate correctness check S
S. No. PV Solar Module No. Rating of PV Solar Module Quantity Location Remarks
Remarks if any
SIGNATURE
NAME
DATE
INSPECTION REPORT FOR COMMISSIONING OF LT PANELS / DISTRIBUTION
BOARDS
L E OBSERVATION REMARKS
1
P
Verification of Inward Inspection report/Pre-commissioning report & check
Y
list
2 Permanent installation
M P
SA C O
3 Input supply available & termination complete
4 Check the cleanness inside the panel
TESTS :
Sr No. ACTIVITY REMARKS
FUNCTIONAL TEST OF
a) Voltmeter
1 b) AMP meter
c) KWH meter
d) PF meter
2 Check O/P supply at each individual feeder
STATUS COMMENTS :
A ACCEPTED
B ACCEPTED AS NOTED
C NOT ACCEPTED
Remarks if any
SIGNATURE
NAME
DATE