BUILD UP AREA:
PRO - G . FLOOR AREA 208 . 25 SQ.M
NOTES : -
HT - HOLDING TANK - 3.00 X 2.00 X 2.50 M
3.10 M
1. ALL THE BOUNDARY POINTS (ALAMA) GIVEN IN KROOKIE
7.60 M
3.10 M
3 SHALL BE ESTABLISHED AT SITE BY APPROVED AUTHORITY ,
BEFORE THE START OF EARTH WORK EXCAVATION.
2. THE SITE SHALL BE CLEANED PROPERLY REMOVING BUSHES ,
DEBRIS OR OLD DAMAGED BUILDING IF ANY.
9.30 M COMPOUND
WALL
20.00 M
GATE LIGHT
G2
.
M ONLY
14.40 M
14.90 M
20.00 M
BE FOR 5
C COPYRIGHT : -
EDGE
PROPOSED This drawing is protected by copyright. All rights are reserved.
0.50M
G . FLOOR No part of this drawing may in any form or by any means be reproduced,
E ROAD
SHOULD
OULD BE PHALT ROAD ,
ST published, broadcast or transmitted without the prior written permission
of the Muruj Engineering consultancy office.
UP TO TH
NO: DATE REVISION BY: APP:
INTERLOC
2.00 M
&
NY
THAT SH
NG I NNN ER I NG CON S UL TA
1 MURUJ
1.50M
UJ E
G1
2.00 M
MU R
Al Kamil
WhatsApp:- 90 90 45 60
30.00 M COMPOUND
WALL
GATE LIGHT
Email : - murujalkamil@gmail.com
CLIENT NAME :
10
M F.G.L.
10
10
M MARBLE ( TREAD,RISER,SKIRTING & LANDING)
10
30
30
30
M
10
W1 W1
40
40
10
10 WHITE POWDER COATED ALUMINUM
BATH CAREFULLY BEFORE THE COMMENCEMENT
250
W1 F1
C1 S
W2 100 X 200 WINDOW 9.2cm SECTION WITH 6 mm
170 X 220 OF WORK. REFLECTIVE GLASS.
W1 F1
STORE
340
W2 F2 C1 S +077
C1 2. ALL DIMENSIONS ARE IN CENTIMETERS, WHITE POWDER COATED ALUMINUM
200 X 310 F.F.L
V V 50 X 120 VENTILATOR HALF LOUVERED AND
BED ROOM
470
arch
500 X 440 F.F.L
+080
3. WRITTEN DIMENSIONS ARE TO BE
+080 FOLLOWED, NO DIMENSION SHALL BE
F.F.L
CUPBOARD
F.F.L
DRESS
220
SCALED FROM THE DRAWINGS.
190 X 150
arch
W1 F1 4. ALL DRAWINGS ARE INTER-RELATED AND
130
C1 S D1 W1 F1
20 C1 S SHALL BE READ IN CONJUNCTION WITH
D1
OTHER DRAWINGS.
2 arch 2
CUPBOARD
W2 F2
C1
19 20 21 22 23 24 5. ANY AMBIGUITIES / DISCREPANCIES FOUND
140
arch
WASH 18 M M M IN THE DRAWING SHALL BE BROUGHT TO
210
190 X 120
UP
210
THE NOTICE OF THE ENGINEER, BEFORE THE
17 M
D2
HALL M
COMMENCEMENT OF RELEVANT ITEM OF
W2 F2 16 1
V C1
15 M 500 X 310 M 2 WORK.
3
1440
1440
BATH
190
380
C1
10
500 X 800 CONSTRUCTION.
BATH
270
F.F.L
610
+077 PLASTERING AT CONCRETE BLOCK WORK
F.F.L F.F.L
V JOINTS IN SUPER STRUCTURE.
W1 F1
D2 9. ALL EXPOSED CORNERS SHALL BE PROVIDED
C1 S
500 X 600 MD
10. ELECTRICAL , WATER AND OTHER SERVICE
WASH
+080
210
210
arch
W1 F1
ENTRANCE 200 X 260
W W
5 PLASTERING. This drawing is protected by copyright. All rights are reserved.
No part of this drawing may in any form or by any means be reproduced,
190 X 120 +077 STANDARD NOTES:-
10
140
130
Beam
+080
110 100 80 100 110 F.F.L of the Muruj Engineering consultancy office.
Beam
15
F.F.L
±000 45
1. ALL MATERIALS USED FOR CONSTRUCTION NO: DATE REVISION BY: APP:
6 M
D
W W
Beam
M
F.G.L.
6 SHALL COMPLY WITH RELEVANT OMANI
10
45 M M STANDARDS.
10
10
±000
15
40
M M
20 35 2. ALL CONSTRUCTION MATERIALS SHALL BE S
M F.G.L. M V I CE
SER
TESTED AS PER SPECIFICATIONS AND
&
NY
NG I NNN ER I NG CON S UL TA
10 190 520 220 540 10 STANDARDS.
3. ALL CONCRETE STRUCTURAL MEMBERS
UJ E
AS SPECIFIED BY THE ENGINEER.
MU R
Al Kamil
4. ALL BLOCKS FOR CONSTRUCTION SHALL BE WhatsApp:- 90 90 45 60
A B D F H OF GOOD QUALITY AND SUPPLIED BY Email : - murujalkamil@gmail.com
APPROVED MANUFACTURER. CLIENT NAME :
5. ORDINARY PORTLAND CEMENT TO BE USED
Mr . TAAEER BADAR TAAEER AL RASBI
GROUND FLOOR PLAN FOR ALL THE CONCRETE, BLOCK
PLASTERING, AND TILE WORKS. UNLESS
PLOT NO : - LOCATION : - J . B .BUALI,
SCALE 1:100 ( ALL DIM ARE IN CM'S) 6 - 15 - 087 - 05 - 030 AL OLA P/A NORTH
OTHERWISE SPECIFIED.
TITLE : -
6. SULPHATE RESISTANT CEMENT HAS TO BE G.F FLOOR PLAN
USED FOR ALL WORKS UNDER GROUND
DESIGNED : - JOB NO : -
LEVEL, UNLESS OTHERWISE SPECIFIED. Hari 0083 / MECS
CHECKED : - SCALE : -
NOTES:- Ram 1 : 100 (A3)
By Eng:REEM HILAL ALRASBI at 10:14 am, Oct 08, 2023
· USE NON SLIPPERY GROOVED STEP TILES CAD DESIGNER : - DATE : -
Saleesh Khan 01 / 10 / 2023
OR MARBLES FOR ENTRANCE STEPS AND
USE & NO OF FLOORS : - NO OF SHEET : -
STAIRCASE Residential & G +1 2 / 21
INTERNAL FINISHES
FINISHING CODES SCHEDULE OF DOOR'S
WALL FLOOR
SCHEDULE CEILING SKIRTING SOLID MIRANTI WOOD DECORATIVE
MD 150 X 250
TYPE DESCRIPTION
DOOR
10
REFLECTIVE GLASS.
10
30
10
10
40
40
10
W2 F2 185 150 185
W2 F2
C1 OF WORK. REFLECTIVE GLASS.
C1
W2 D2 BATH
100
10
W1 F1 10 2. ALL DIMENSIONS ARE IN CENTIMETERS, WHITE POWDER COATED ALUMINUM
250 X 120 BATH
250
C1 S
V 50 X 200 VENTILATOR HALF LOUVERED AND
170 X 220 UNLESS OTHERWISE SPECIFIED. HALF FIXED TYPE
330
190
250 X 170 BED ROOM D2
SCALED FROM THE DRAWINGS.
520 X 440
4. ALL DRAWINGS ARE INTER-RELATED AND
D1 D1
CUPBOARD
SHALL BE READ IN CONJUNCTION WITH
220
DRESS
OTHER DRAWINGS.
arch
170 X 150
140
18 M M M
DN
CUPBOARD
210
W1 F1
W2 F2
C1 S BATH WORK.
17 M
C1 S DRESS 280 X 190 6. PLINTH LEVELS SHALL BE ESTABLISHED AT
330
W2 220 X 190 D2
100
1440
14 13 12 11 10 9 8 7 6
30 240 300 BROUGHT TO THE KNOWLEDGE OF THE
105
M M M M D1
CONSULTANCY BEFORE THE
40
4 X D1 X CONSTRUCTION.
8. METAL MET SHALL BE FIXED BEFORE
W2 F2
10 C1 PLASTERING AT CONCRETE BLOCK WORK
W1 F1
BATH JOINTS IN SUPER STRUCTURE.
270
C1 S
30 160 X 250 9. ALL EXPOSED CORNERS SHALL BE PROVIDED
BED ROOM
610
V
500 X 590 WITH GI CORNER BEADING FINISHING.
W1 F1 10. ELECTRICAL , WATER AND OTHER SERVICE
D2 C1 S
CONDUIT , CHASING / CUTOUTS SHALL BE
M. BED ROOM
PROPERLY PACKED WITHOUT CAVITY AND
720 X 600
W1 F1 METAL NET TO BE FIXED BEFORE C COPYRIGHT : -
CUPBOARD
C1 S
PLASTERING. This drawing is protected by copyright. All rights are reserved.
DRESS No part of this drawing may in any form or by any means be reproduced,
350
W W
10
5 1. ALL MATERIALS USED FOR CONSTRUCTION NO: DATE REVISION BY: APP:
SHALL COMPLY WITH RELEVANT OMANI
130
110 100 80 100 180 100 50
15
CUPBOARD 45 STANDARDS.
6 W W
6 2. ALL CONSTRUCTION MATERIALS SHALL BE
TESTED AS PER SPECIFICATIONS AND
S
V I CE
SER
&
10
45
NY
10
10
NG I NNN ER I NG CON S UL TA
STANDARDS.
15
40
20 35
3. ALL CONCRETE STRUCTURAL MEMBERS
SHALL BE CAST USING CONCRETE OF GRADE MURUJ
10 190 520 220 540 10 Engineering Consultancy & Services
UJ E
AS SPECIFIED BY THE ENGINEER.
MU R
Al Kamil
4. ALL BLOCKS FOR CONSTRUCTION SHALL BE
1490 OF GOOD QUALITY AND SUPPLIED BY
WhatsApp:- 90 90 45 60
Email : - murujalkamil@gmail.com
APPROVED MANUFACTURER. CLIENT NAME :
5. ORDINARY PORTLAND CEMENT TO BE USED
A B D F H FOR ALL THE CONCRETE, BLOCK
Mr . TAAEER BADAR TAAEER AL RASBI
PLOT NO : - LOCATION : - J . B .BUALI,
PLASTERING, AND TILE WORKS. UNLESS
6 - 15 - 087 - 05 - 030 AL OLA P/A NORTH
FIRST FLOOR PLAN 6.
OTHERWISE SPECIFIED.
SULPHATE RESISTANT CEMENT HAS TO BE
TITLE : -
G.F FLOOR PLAN
SCALE 1:100 ( ALL DIM ARE IN CM'S) USED FOR ALL WORKS UNDER GROUND
DESIGNED : - JOB NO : -
LEVEL, UNLESS OTHERWISE SPECIFIED. Hari 0083 / MECS
CHECKED : - SCALE : -
NOTES:- Ram 1 : 100 (A3)
By Eng:REEM HILAL ALRASBI at 10:14 am, Oct 08, 2023
· USE NON SLIPPERY GROOVED STEP TILES CAD DESIGNER : - DATE : -
Saleesh Khan 01 / 10 / 2023
OR MARBLES FOR ENTRANCE STEPS AND
USE & NO OF FLOORS : - NO OF SHEET : -
STAIRCASE Residential & G +1 3 / 21
ELECTRICAL SYMBOLS
ELECTRICAL NOTES:-
E E
G
IN
CEILING FAN CALLING BELL 2.20M
IL
1. THIS ELECTRICAL PLAN SHALL BE READ
CE
TWO GANG
WITH ARCHITECTURAL DRAWINGS AND
G
20 mm PVC CONDUIT TO METER BOARD
IN
CHANDELIER SWITCH TWO 2.20M
IL
CE
WAY
SPECIFICATIONS.
NG
FLUORESCENT BOX
I
MIRROR LIGHT 2.20M
IL
2. ALL ELECTRICAL WORKS SHALL BE CARRIED DOUBLE TUBE LIGHT
CE
G
OUT AS PER APPROVED DRAWING TO FLUORESCENT BOX
IN
FAN REGULATOR 1.50M
IL
DOUBLE TUBE LIGHT
CE
CONFORM WITH THE LATEST OMAN
FLUORESCENT BOX ONE GANG
G
1.50M
IN
ELECTRICAL STANDARDS AND SINGLE TUBE LIGHT
IL
SWITCH
CE
REGULATIONS. CEILING LIGHT TWO GANG
1.50M
SWITCH
3. SEPARATE D.B. SHALL BE USED FOR EACH
SPEAKER AC SOCKET & 1.50M
FLOOR AND ONE ADDITIONAL D.B FOR SWITCH
CAMERA 3.40M TV SOCKET & 1.50M
EXTERNAL WORKS SUCH AS SERVANT SWITCH
ROOM,PENT HOUSE, TERRACE FLOOR, WATER HEATER
WINDOW TYPE AC 2.20M SWITCH 1.50M
WATER PROOF & COMPOUND WALL LIGHTS AND PUMPS ETC.,
SPLIT UNIT AC 2.20M COOKER 0.80M
WEATHER PROOF 4. D.B'S SHALL BE INSTALLED IN COMMON
SOCKET (TYP) WALL LIGHT 2.20M T.V POSITION 0.50M
HALL.
EXHAUST FAN 2.20M TELE PHONE 0.50M
5. ALL WIRING SHALL BE WITH COLORS CODE
AND LABELED IN SERIAL NUMBER. WATER HEATER 2.20M INTERCOM 0.50M
6. ALL LOAD MUST BE BALANCED. 13 AMP SOCKET BELL PUSH Ext-
1.50M
TL
EL
7. EACH D.B SHALL BE EARTH IN SEPARATE AND SWITCH BUTTON Wall
MAIN DISTRIBUTION 2.20M
EARTH PIT. BOARD
1.50M SPOT LIGHT
8. ALL EARTH PITS SHALL BE PROVIDED WITH KEY HOLDER 2.20M SWITCH BOARD 2.20M
MDB
SPECIAL NOTES OF HIGH RISE BUILDINGS:
HDU
WATER PROOF & 10. HIGH RISE BUILDINGS SHALL BE PROVIDED
WEATHER PROOF
SOCKET (TYP) WITH LIGHTNING CONDUCTOR WITH
SEPARATE EARTH AS BRIEFED IN OES -4
(CLAUSE 8.19).
11. A SEPARATE ELECTRICAL ROOM SHALL BE
PROVIDED AND EQUIPPED WITH A/C UNIT,
WATER PROOF &
LAMP AND A RUBBER MAT IN FRONT OF THE
WEATHER PROOF
EL SOCKET (TYP) MAIN PANEL BOARD WITH SUFFICIENT
WORKING SPACE.
12. TWO SETS OF LINE DIAGRAM OF LOAD
EL DISTRIBUTION HAS TO BE SUBMITTED IN C COPYRIGHT : -
This drawing is protected by copyright. All rights are reserved.
ADVANCE FOR APPROVAL. No part of this drawing may in any form or by any means be reproduced,
published, broadcast or transmitted without the prior written permission
13. NEW APPROVED LINE DIAGRAM SHALL BE
of the Muruj Engineering consultancy office.
PRODUCED AT THE TIME OF INSPECTION. NO: DATE REVISION BY: APP:
S
V I CE
SER
&
NY
CABLE& CONDUIT FOR TELEPHONE TO OUT SIDE
NG I NNN ER I NG CON S UL TA
TO THE BOUNDARY WALL CABLE & CONDUIT
MURUJ
+1C X 15 SQ MM EARTH WIRE EXTENDED
UJ E
MU R
Al Kamil
FOR GATE LIGHTS & BELL SWITCH
WhatsApp:- 90 90 45 60
Email : - murujalkamil@gmail.com
CLIENT NAME :
G
IN
CEILING FAN CALLING BELL 2.20M
IL
1. THIS ELECTRICAL PLAN SHALL BE READ
CE
TWO GANG
WITH ARCHITECTURAL DRAWINGS AND
G
IN
CHANDELIER SWITCH TWO 2.20M
IL
CE
WAY
SPECIFICATIONS.
NG
FLUORESCENT BOX
I
MIRROR LIGHT 2.20M
IL
2. ALL ELECTRICAL WORKS SHALL BE CARRIED DOUBLE TUBE LIGHT
CE
G
OUT AS PER APPROVED DRAWING TO FLUORESCENT BOX
IN
FAN REGULATOR 1.50M
IL
DOUBLE TUBE LIGHT
CE
CONFORM WITH THE LATEST OMAN
FLUORESCENT BOX ONE GANG
G
1.50M
IN
ELECTRICAL STANDARDS AND SINGLE TUBE LIGHT
IL
SWITCH
CE
REGULATIONS. CEILING LIGHT TWO GANG
1.50M
SWITCH
3. SEPARATE D.B. SHALL BE USED FOR EACH
SPEAKER AC SOCKET & 1.50M
FLOOR AND ONE ADDITIONAL D.B FOR SWITCH
CAMERA 3.40M TV SOCKET & 1.50M
EXTERNAL WORKS SUCH AS SERVANT SWITCH
ROOM,PENT HOUSE, TERRACE FLOOR, WATER HEATER
WINDOW TYPE AC 2.20M SWITCH 1.50M
COMPOUND WALL LIGHTS AND PUMPS ETC.,
SPLIT UNIT AC 2.20M COOKER 0.80M
EL 4. D.B'S SHALL BE INSTALLED IN COMMON
EL
WALL LIGHT 2.20M T.V POSITION 0.50M
HALL.
EXHAUST FAN 2.20M TELE PHONE 0.50M
5. ALL WIRING SHALL BE WITH COLORS CODE
AND LABELED IN SERIAL NUMBER. WATER HEATER 2.20M INTERCOM 0.50M
6. ALL LOAD MUST BE BALANCED. 13 AMP SOCKET BELL PUSH Ext-
1.50M
7. EACH D.B SHALL BE EARTH IN SEPARATE AND SWITCH BUTTON Wall
MAIN DISTRIBUTION 2.20M
EARTH PIT. BOARD
1.50M SPOT LIGHT
8. ALL EARTH PITS SHALL BE PROVIDED WITH KEY HOLDER 2.20M SWITCH BOARD 2.20M
MDB
FOOT LAMP AT 3PIN 166 SWITCH
9. METER BOARD SHALL BE INSTALLED 2.20M SOCKET OUTLET
9"LVL
AT 1800 mm
WATER PROOF &
HDU
OUTSIDE OF THE HOUSE, PREFERABLY NEAR
WEATHER PROOF EMERGENCY CEILING ROSE
EL
THE ENTRANCE GATE PROJECTING INSIDE LIGHT
SOCKET (TYP)
THE COMPOUND WALL AS DETAILED IN THE WIFI - POINT
EL
DRAWING WITH VIEWING GLASS OUT SIDE.
SPECIAL NOTES OF HIGH RISE BUILDINGS:
10. HIGH RISE BUILDINGS SHALL BE PROVIDED
EL WITH LIGHTNING CONDUCTOR WITH
SEPARATE EARTH AS BRIEFED IN OES -4
(CLAUSE 8.19).
11. A SEPARATE ELECTRICAL ROOM SHALL BE
EL
PROVIDED AND EQUIPPED WITH A/C UNIT,
LAMP AND A RUBBER MAT IN FRONT OF THE
MAIN PANEL BOARD WITH SUFFICIENT
WORKING SPACE.
12. TWO SETS OF LINE DIAGRAM OF LOAD
DISTRIBUTION HAS TO BE SUBMITTED IN C COPYRIGHT : -
This drawing is protected by copyright. All rights are reserved.
ADVANCE FOR APPROVAL. No part of this drawing may in any form or by any means be reproduced,
published, broadcast or transmitted without the prior written permission
13. NEW APPROVED LINE DIAGRAM SHALL BE
of the Muruj Engineering consultancy office.
PRODUCED AT THE TIME OF INSPECTION. NO: DATE REVISION BY: APP:
S
V I CE
SER
&
NY
NG I NNN ER I NG CON S UL TA
MURUJ
F.F.ELECTRICAL PLAN Engineering Consultancy & Services
UJ E
MU R
SCALE 1:100 ( ALL DIM ARE IN CM'S)
Al Kamil
WhatsApp:- 90 90 45 60
Email : - murujalkamil@gmail.com
CLIENT NAME :
B2 10 A 3X1.5 SQMM LIGHTS & FANS BED ROOM - 2 & BATH 0.9 VIEWING GLASS
GATE (G2)
R3 30 A 3X6.0 SQMM AIR CONDITIONER FAMILY HALL 2.5
3 Y3 16 A 3X2.5 SQMM SOCKETS FAMILY HALL 0.5
PANEL BOARD ( TYP )
B3 10 A 3X1.5 SQMM LIGHTS & FANS FAMILY HALL 1.0
R4 30 A 3X6.0 SQMM AIR CONDITIONER KITCHEN & STORE 2.5
4 Y4 16 A 3X2.5 SQMM SOCKETS KITCHEN & STORE 0.5
UPVC CABLE DUCT UPVC CABLE DUCT
B4 10 A 3X1.5 SQMM LIGHTS & FANS KITCHEN & STORE 0.8 CABLE FROM POLE CABLE TO MAIN BUILDING
30CM
B5 20 A 3X4.0 SQMM WATER HEATER BED ROOM - 2 & BATH 1.5 CABLE TO M.D.B
IN SIDE
R6 SPARE
6
Y6 40 A 3X6.0 SQMM COCKER KITCHEN 4.0 G1 C COPYRIGHT : -
B6 10 A 3X1.5 SQMM LIGHTS & FANS PASSAGE 0.6
OUT SIDE This drawing is protected by copyright. All rights are reserved.
R7 30 A 3X6.0 SQMM AIR CONDITIONER G.MAJLIS & BATH 2.5 PANEL BOARD
No part of this drawing may in any form or by any means be reproduced,
BOUNDARY WALL
GATE 'G1'
7 Y7 16 A 3X2.5 SQMM SOCKETS G.MAJLIS & BATH 0.5 published, broadcast or transmitted without the prior written permission
B7 10 A 3X1.5 SQMM LIGHTS & FANS G.MAJLIS & BATH of the Muruj Engineering consultancy office.
1.0
ELECTRICAL PANEL BOARD DETAIL
R8 30 A 3X6.0 SQMM AIR CONDITIONER M.BED ROOM & BATH 2.5 NO: DATE REVISION BY: APP:
8 Y8 16 A 3X2.5 SQMM SOCKETS M.BED ROOM & BATH 0.5
B8 10 A 3X1.5 SQMM LIGHTS & FANS M.BED ROOM & BATH 1.0
R9 SPARE
9 Y9 20 A 3X4.0 SQMM WATER HEATER G.MAJLIS & BATH 1.5
S
V I CE
SER
B9 20 A 3X4.0 SQMM WATER HEATER
&
M.BED ROOM & BATH 1.5
NY
NG I NNN ER I NG CON S UL TA
R10 SPARE
10 Y10 SPARE
B10
R11
SPARE MURUJ
SPARE
Engineering Consultancy & Services
UJ E
11 Y11 SPARE
MU R
B11
Al Kamil
SPARE
WhatsApp:- 90 90 45 60
R12 SPARE
Email : - murujalkamil@gmail.com
12 Y12 SPARE
B12 SPARE
CLIENT NAME :
TOTAL PHASE LOAD 16.5 10.0 9.2 Mr . TAAEER BADAR TAAEER AL RASBI
TOTAL LOAD 35.70 KW
PLOT NO : - LOCATION : - J . B .BUALI,
6 - 15 - 087 - 05 - 030 AL OLA P/A NORTH
EARTH TITLE : -
PIT GRAND TOTAL = 35.70 KW ELECTRICAL LOAD CALCULATION
DESIGNED : - JOB NO : -
Hari 0083 / MECS
CHECKED : - SCALE : -
Ram 1 : 100 (A3)
By Eng:REEM HILAL ALRASBI at 10:14 am, Oct 08, 2023
CAD DESIGNER : - DATE : -
Saleesh Khan 01 / 10 / 2023
SPARE
CONSIDERATION, THE CHANGES OF LOCAL AUTHORITY REGULATIONS
FROM TIME TO TIME WHEN PROVIDING SHOP DRAWINGS FOR
CONSULTANTS APPROVAL. NO CLAIM IN THIS REGARD SHALL BE
MAIN PANEL BOARD WITH CONSIDERED
METAL CABINET AS LOCATED 4C 35 SQMM/XLPE/SWA/PVC CU CABLE.
IN SITE PLAN 4. ANY CHANGES IN REQUIREMENTS BY CLIENT /CONTRACTOR EXCEEDING
+ 1 C 35 SQMM PVC CU. CABLE
THE SANCTIONED LOAD LIMIT WILL ALTER THE BASIC PROVISIONS , AND
100ATP
MCCB HENCE SUCH CHANCES IF ANY SHALL BE PROPOSED WITH SHOP
EARTH OUT.
DRAWINGS FOR CONSULTANTS APPROVAL NO CLAIM IN THIS REGARD
PIT
SHALL BE CONSIDERED.
30CM
CABLE TO M.D.B
R5 20 A 3X4.0 SQMM WATER HEATER 1.5
IN SIDE
5 Y5 20 A 3X4.0 SQMM WATER HEATER BED ROOM - 1 & BATH 1.5
B5 SPARE G1 C COPYRIGHT : -
R6 SPARE OUT SIDE This drawing is protected by copyright. All rights are reserved.
PANEL BOARD
Y6 40 A 3X6.0 SQMM BOUNDARY WALL No part of this drawing may in any form or by any means be reproduced,
GATE 'G1'
6 published, broadcast or transmitted without the prior written permission
B6 10 A 3X1.5 SQMM LIGHTS & FANS PASSAGE 0.6
of the Muruj Engineering consultancy office.
R7 30 A 3X6.0 SQMM AIR CONDITIONER G.MAJLIS & BATH 2.5 ELECTRICAL PANEL BOARD DETAIL
NO: DATE REVISION BY: APP:
7 Y7 16 A 3X2.5 SQMM SOCKETS G.MAJLIS & BATH 0.5
B7 10 A 3X1.5 SQMM LIGHTS & FANS G.MAJLIS & BATH 1.0
R8 SPARE
8 Y8 SPARE S
V I CE
SER
B8 SPARE
&
NY
NG I NNN ER I NG CON S UL TA
R9 20 A 3X4.0 SQMM WATER HEATER BED ROOM - 2 1.5
9 Y9 20 A 3X4.0 SQMM WATER HEATER G.MAJLIS & BATH 1.5
B9 10 A 3X1.5 SQMM LIGHTS EXTERNAL SIDE 1.5 MURUJ
R10 30 A 3X6.0 SQMM AIR CONDITIONER BED ROOM - 2 2.5
Engineering Consultancy & Services
UJ E
10 Y10 16 A 3X2.5 SQMM SOCKETS BED ROOM - 2 0.5
MU R
Al Kamil
B10 10 A 3X1.5 SQMM LIGHTS & FANS BED ROOM - 2 0.7 WhatsApp:- 90 90 45 60
R11 SPARE Email : - murujalkamil@gmail.com
11 Y11 SPARE By Eng:REEM HILAL ALRASBI at 10:14 am, Oct 08, 2023 CLIENT NAME :
B11 SPARE
R12 SPARE Mr . TAAEER BADAR TAAEER AL RASBI
12 Y12 SPARE
PLOT NO : - LOCATION : - J . B .BUALI,
B12 SPARE
6 - 15 - 087 - 05 - 030 AL OLA P/A NORTH
TOTAL PHASE LOAD 15.5 9.5 6.5
TITLE : -
TOTAL LOAD 31.50 KW ELECTRICAL LOAD CALCULATION
DESIGNED : - JOB NO : -
EARTH
GROUND FLOOR TOTAL LOAD = 31.50 KW GRAND TOTAL = G.F + F.F = 35.70 + 31.50 = 67.00 KW CHECKED : -
Hari
SCALE : -
0083 / MECS
DH HEAT DETECTOR
EL FIRE ALARM (battery type)
( 2Kg)
FB DH
EL
140W X 80L X 100 H
GD
CYLINDER ROOM
(battery)
GAS
50 700 50
50
EXITINGUISHER
IN ARABIC
750
AND ENGLISH
50
FRONT VIEW
HOSE
REEL
2kg.CO2
AFF
C COPYRIGHT : -
This drawing is protected by copyright. All rights are reserved.
No part of this drawing may in any form or by any means be reproduced,
published, broadcast or transmitted without the prior written permission
VIEW WITH DOOR OPEN of the Muruj Engineering consultancy office.
NO: DATE REVISION BY: APP:
S
V I CE
SER
&
NY
NG I NNN ER I NG CON S UL TA
MURUJ
FIRE FIGHTING PLAN Engineering Consultancy & Services
UJ E
MU R
Al Kamil
SCALE 1:100 ( ALL DIM ARE IN CM'S)
700
WhatsApp:- 90 90 45 60
Email : - murujalkamil@gmail.com
AFF CO2
CLIENT NAME :
300
6 - 15 - 087 - 05 - 030 AL OLA P/A NORTH
TITLE : -
FIRE FIGHTING PLAN
DESIGNED : - JOB NO : -
FINISHED FLOOR LEVEL
Hari 0083 / MECS
CHECKED : - SCALE : -
Ram 1 : 100 (A3)
By Eng:REEM HILAL ALRASBI at 10:14 am, Oct 08, 2023
FIRE EXTINGUISHER CABINET CAD DESIGNER : - DATE : -
Saleesh Khan 01 / 10 / 2023
To Septic Tank
CONNECTION FITTINGS, AS PER F.T
FLOOR TRAP STAINLESS STEEL
SINK
MANUFACTURERS INSTRUCTIONS.
GT GULLY TRAP OVEN
3. ALL BATH ROOMS / TOILETS SETS SHALL
COMPRISE OF THE UNITS SHOWN ON THE MH MAN HOLE COVER WATER HEATER
SHALL BE MOUNTED ON THE TERRACE WITH 3 FROM FLOOR DROP TO GULLY TRAP 55 mm Ø
F.T
FLOAT STOP VALVE AND MOUNTING 5 PIPE FOR SEWER LINE (UPVC) 150 mm Ø
F.T
SADDLES, OVERFLOW OUTLET, WASH WATER 6 WASTE WATER PIPE (UPVC) 100 mm Ø
OUTLET ETC., 7 VENT PIPE AND VENT STACK (UPVC) 100 mm Ø
5. HOLDING TANK AND SEPTIC TANK SHALL BE
8 RAIN WATER PIPE (UPVC) 100 mm Ø
CONSTRUCTED WITH SOLID/ REINFORCED
MH
BLOCK WORK/ RCC.
6. ALL THE ST & HT WALLS CONSTRUCTED
WITH BLOCK WORK SHALL BE RENDERED TO
MAKE WATER PROOF PLASTER.
150 mm DIA - UPVC PIPE
S
V I CE
SER
&
NY
NG I NNN ER I NG CON S UL TA
MURUJ
Engineering Consultancy & Services
UJ E
MU R
Al Kamil
WhatsApp:- 90 90 45 60
Email : - murujalkamil@gmail.com
CLIENT NAME :
TO M H TO M H
DRAWING AND OTHER ACCESSORIES SUCH AS EXHAUST FAN
TAPS , VALVES, ANAL SPRAY , SOAP TRAY,
DRAINAGE CONNECTION
PAPER ROLL HOLDER , MIRROR UNIT ETC.,
F.T
F.T
1 FROM WASH BASIN, BIDET 36 mm Ø
4. UNLESS OTHERWISE SPECIFIED 600 GALLON
2 FROM SINK, BATH AND SHOWER 42 mm Ø
CAPACITY POLYETHYLENE WATER TANK
SHALL BE MOUNTED ON THE TERRACE WITH 3 FROM FLOOR DROP TO GULLY TRAP 55 mm Ø
S
V I CE
SER
&
NY
NG I NNN ER I NG CON S UL TA
F.F.SANITARY PLAN
SCALE 1:100 ( ALL DIM ARE IN CM'S)
MURUJ
Engineering Consultancy & Services
UJ E
MU R
Al Kamil
WhatsApp:- 90 90 45 60
Email : - murujalkamil@gmail.com
CLIENT NAME :
( e en e
MAIN LINE WITH CONTROL VALVE
25 mm DIA. HIGH P.P.R. PIPE FROM
EMPLOYING SPECIALIZED TEAM OF PEOPLE
WATER TANK
600 GALLON POLYETHYLENE
EXTERNAL ELEVATION EXTERNAL ELEVATION
IN THIS FIELD.
un ar
GRC
SHALL BE PROTECTED PROPERLY , NO
GRC
Drainage pipe Drainage pipe PUNCHING OF HOLES,SCRATCHING OR
a )
OUT SIDE OUT SIDE TEARING ON THE TOP SURFACE.
PLAN PLAN
TYPE 2
TYPE 1
4. NO WHEELING OR PULLING OF HEAVY
RAIN WATER RAIN WATER
10
RAIN WATER MATERIALS OVER THE TOP SURFACE OF
U.P.V.C PIPE (TYP) U.P.V.C PIPE (TYP)
U.P.V.C PIPE (TYP) WATER PROOFING MEMBRANE.
EXTERNAL ELEVATION EXTERNAL ELEVATION
IN SIDE IN SIDE
A . C UNIT A . C UNIT
PIPE
PIPE
10
Drainage pipe
Drainage pipe
WASH GRC
GRC
OUT SIDE OUT SIDE
RIDGE LINE
CENTRAL ANTENNA PLAN PLAN
PLAT FORM
200 mm HIGH SOLID
CONTROL VALVE
TYPE 1 TYPE 2
S
V I CE
25
SER
&
NY
100mm uPVC PIPE CLAMPED 1m c/c
NG I NNN ER I NG CON S UL TA
MURUJ
Engineering Consultancy & Services
UJ E
TERRACE PLAN
MU R
DETAILS OF WATER PROOFING AT RAIN WATER DISPOSAL PIPE
Al Kamil
SCALE 1:100 ( ALL DIM ARE IN CM'S) WhatsApp:- 90 90 45 60
SCALE 1:100 ( ALL DIM ARE IN CM'S) Email : - murujalkamil@gmail.com
CLIENT NAME :
BUILDING
PLOT NO : - LOCATION : - J . B .BUALI,
6 - 15 - 087 - 05 - 030 AL OLA P/A NORTH
PCC TITLE : -
TERRACE PLAN
FGL
DESIGNED : - JOB NO : -
Hari 0083 / MECS
X CHECKED : - SCALE : -
SECTION X-X SPLASH BLOCK Ram 1 : 100 (A3)
By Eng:REEM HILAL ALRASBI at 10:14 am, Oct 08, 2023
UPVC RAIN WATER PIPE CONNECTION AT GROUND DETAILS CAD DESIGNER : - DATE : -
SCALE 1:100 ( ALL DIM ARE IN CM'S)
Saleesh Khan 01 / 10 / 2023
15
30
1. 16 mm THICK CEMENT MORTAR PLASTER FINISH.
2. 32mm THICK CEMENT MORTAR PLASTER MAKING
150
150
DESIGNED CARVING WORK.
3. 20mm WIDE GROOVE IN 16mm THICK PLASTER.
4. 50mm WIDE RECESS IN 16mm THICK PLASTER FOR
8mm DEEP.
5. 100mm WIDE RECESS IN 16mm THICK PLASTER FOR
340
340
8mm DEEP.
200
200
6. ONE COAT OF ALKALI RESISTANT GOOD
QUALITY ACRYLIC PRIMER.
950
950
7. TWO COATS OF EXTERIOR MATT EMULSION
OVER PRIMER COAT.
180
180
800
800
8. TWO COATS OF TEXTURE PAINT OVER PRIMER
COAT.
9. NON-GLOSY / MATT FINISHED CERAMIC TILED
380
380
FINISHING.
200
200
10. SAND STONE TILED FINISHING.
NOTE:-
· DO NOT USE NORMAL GLAZED CERAMIC
TILES FOR ENTRANCE STEPS AND STAIRCASE.
130
130
· ALL THE EXTERNAL FINISHES SHALL BE
80
80
F.G.L F.G.L APPROVED BY THE ENGINEER.
20
20 35 35
FRONT ELEVATION
SCALE 1:100 ( ALL DIM ARE IN CM'S)
150
C COPYRIGHT : -
This drawing is protected by copyright. All rights are reserved.
1 6
8 * No part of this drawing may in any form or by any means be reproduced,
published, broadcast or transmitted without the prior written permission
1 6
8 * of the Muruj Engineering consultancy office.
1 6
8 *
NO: DATE REVISION BY: APP:
340
340
120
S
V I CE
SER
&
NY
NG I NNN ER I NG CON S UL TA
950
950
MURUJ
260
800
800
1 6
Engineering Consultancy & Services
UJ E
8 *
MU R
Al Kamil
WhatsApp:- 90 90 45 60
Email : - murujalkamil@gmail.com
380
380
CLIENT NAME :
120
120
1 6
8 * Mr . TAAEER BADAR TAAEER AL RASBI
PLOT NO : - LOCATION : - J . B .BUALI,
6 - 15 - 087 - 05 - 030 AL OLA P/A NORTH
180
180
TITLE : -
ELEVATION
80
80
15
PROJECTION
30
DESCRIPTION
15
1. 16 mm THICK CEMENT MORTAR PLASTER FINISH.
150
150
2. 32mm THICK CEMENT MORTAR PLASTER MAKING
1 6
8 * DESIGNED CARVING WORK.
3. 20mm WIDE GROOVE IN 16mm THICK PLASTER.
1 6
4. 50mm WIDE RECESS IN 16mm THICK PLASTER FOR
1 6
8 * 8 *
8mm DEEP.
120
5. 100mm WIDE RECESS IN 16mm THICK PLASTER FOR
340
340
8mm DEEP.
6. ONE COAT OF ALKALI RESISTANT GOOD
QUALITY ACRYLIC PRIMER.
950
950
15
260
7. TWO COATS OF EXTERIOR MATT EMULSION
OVER PRIMER COAT.
800
800
15
8. TWO COATS OF TEXTURE PAINT OVER PRIMER
10 COAT.
9. NON-GLOSY / MATT FINISHED CERAMIC TILED
380
380
120
320
FINISHING.
10. SAND STONE TILED FINISHING.
1 6
8 *
NOTE:-
210
· DO NOT USE NORMAL GLAZED CERAMIC
TILES FOR ENTRANCE STEPS AND STAIRCASE.
80
80
· ALL THE EXTERNAL FINISHES SHALL BE
F.G.L F.G.L APPROVED BY THE ENGINEER.
40 40
PLASTER DESIGN
PLASTER DESIGN
RIGHT SIDE ELEVATION
SCALE 1:100 ( ALL DIM ARE IN CM'S)
150
1 6
8 *
1 6
8 *
1 6
8 *
1 6
8 * C COPYRIGHT : -
1 6
This drawing is protected by copyright. All rights are reserved.
120
8 *
340
340
No part of this drawing may in any form or by any means be reproduced,
published, broadcast or transmitted without the prior written permission
of the Muruj Engineering consultancy office.
NO: DATE REVISION BY: APP:
950
950
260
S
800
800
V I CE
SER
&
NY
NG I NNN ER I NG CON S UL TA
MURUJ
380
380
120
120
UJ E
1 6
MU R
8 * Al Kamil
WhatsApp:- 90 90 45 60
Email : - murujalkamil@gmail.com
210
210
CLIENT NAME :
80
40 40 TITLE : -
40 PLASTER DESIGN ELEVATION
PLASTER DESIGN
DESIGNED : - JOB NO : -
Hari 0083 / MECS
LEFT SIDE ELEVATION By Eng:REEM HILAL ALRASBI at 10:14 am, Oct 08, 2023
CHECKED : -
Ram
SCALE : -
1 : 100 (A3)
SCALE 1:100 ( ALL DIM ARE IN CM'S) DATE : -
CAD DESIGNER : -
Saleesh Khan 01 / 10 / 2023
40
40
RIM NIGHT LATCH ALSO.
F.F.ROOF SLAB
2. FOR ALL OTHER DOORS, PROVIDE MORTISE
(REFER SCH.)
150
150
F.F.ROOF BEAM LOCK WITH CYLINDER SASH, INCLUDING
10
(REFER SCH.) LEVER HANDLE SET AND 3 Nos. OF KEYS.
3. ALL THE DOORS SHALL BE FIXED WITH
MINIMUM 3 Nos OF BUTT HINGES(100mm).
4. PROVIDE 200mm TOWER BOLTS AT TOP AND
BOTTOM FOR ALL THE DOORS.
340
340
STAIR CASE DETAILS HOLLOW BLOCK
WIDTH = 120CM
TREAD = 30CM G.F.ROOF SLAB 5. PROVIDE A DOOR STOPPER FOR EACH DOOR
RISER = 15.20CM
(REFER SCH.)
SHUTTER (EITHER AT FLOOR LEVEL OR AT
G.F.ROOF BEAM
SIDE WALL, ACCORDING TO THE POSITION OF
950
950
(REFER SCH.)
THE DOOR.)
800
800
6. PROVIDE DUST EXCLUDER FOR ALL EXTERNAL
DOORS AT BOTTOM.
HOLLOW BLOCK
7. ALL THE BATHROOM DOORS SHALL BE
380
380
PROVIDED WITH MORTISE LOCK WITH
THUMB TURN HANDLE AND INDICATOR
8. UNLESS OTHERWISE SPECIFIED THE
PLINTH BEAM
IRONMONGERY SHALL BE IN STAINLESS
(REFER SCH.)
STEEL.
SOLID BLOCK
9. ALL THE IRONMONGERY SHALL BE APPROVED
80
80
F.G.L F.G.L BY THE ENGINEER.
DIST.VARIES
DIST.VARIES
40
40
40
30 30 30 10. ANTI-TERMITE TREATMENT SHALL BE
N.G.L REFER DETAIL C-C N.G.L APPLIED FOR TIMBER WORKS AS PER
MANUFACTURER'S INSTRUCTIONS.
NOTES:-
REFER DETAIL D -D
· ALL THE CEILING SURFACES SHALL BE
SECTION X - X CLEANED BY REMOVING SHEET JOINT LINES ,
SCALE 1:100 ( ALL DIM ARE IN CM'S) TAPES , NAIL STRIP HOLES , CEMENT GROUT
PLUMS ETC., TO GET SMOOTH SURFACE FOR
PRIMER AND PUTTY WORK.
60
10
C COPYRIGHT : -
This drawing is protected by copyright. All rights are reserved.
No part of this drawing may in any form or by any means be reproduced,
10
20
15
S
V I CE
GL
30
SER
&
NY
NG I NNN ER I NG CON S UL TA
10
40
10 MURUJ
Engineering Consultancy & Services
UJ E
MU R
Al Kamil
WhatsApp:- 90 90 45 60
60
SOLID BLOCK WORK Email : - murujalkamil@gmail.com
CLIENT NAME :
P C C (1:3:6) Mr . TAAEER BADAR TAAEER AL RASBI
PARAPET DETAIL 10 10 10
40 PLOT NO : - LOCATION : - J . B .BUALI,
6 - 15 - 087 - 05 - 030 AL OLA P/A NORTH
TITLE : -
By Eng:REEM HILAL ALRASBI at 10:14 am, Oct 08, 2023 SECTION X - X
SECTION ON Z - Z
DESIGNED : - JOB NO : -
Hari 0083 / MECS
CHECKED : - SCALE : -
Ram 1 : 100 (A3)