Interior Toilet & Bath Renovation Estimate

T&B Sample Construction Estimate

Uploaded by

MARIE CARUNUNGAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views1 page

Interior Toilet & Bath Renovation Estimate

T&B Sample Construction Estimate

Uploaded by

MARIE CARUNUNGAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

page 1 of 1 Detailed Estimate

DETAILED ESTIMATE
Pre-Construction Works, Plumbing Works, Electrical Works, and Architectural Works

PROPOSED INTERIOR RENOVATION OF TOILET & BATH No. 2 AND RE-PIPING PORTION OF EXTERIOR WATERLINE
Burgos, Pilar, Bataan
Project Name and Location
LABOR / DIRECT ESTIMATED
Item DESCRIPTION QTY UNIT MATL. EQPT. UNIT DIRECT TOTAL COST UNIT
No. COST COST COST COST COST
(1) (2) (3) (4) (5a) (5b) (5c) (6) (14) (15)
(6)+(13) (14)/(3)

I. PRE-CONSTRUCTION WORKS

I-A Dismantling ( 3.00) cu.m. ( 230.60) ( 10.00) ( 240.60) ( 721.80) ( 721.80) ( 240.60)
I-B Backfill ( 2.00) cu.m. ( 15.00) ( 15.00) ( 30.00) ( 30.00) ( 15.00)
I-D Hauling and Disposal of Debris ( 1.00) lot ( 6,000.00) ( 6,000.00) ( 6,000.00) ( 6,000.00) ( 6,000.00)
I-E Daily Clean-up ( 7.00) days ( 150.00) ( 150.00) ( 1,050.00) ( 1,050.00) ( 150.00)
I-F Mobilization/Demobilization ( 1.00) lot ( 3,000.00) ( 900.00) ( 3,900.00) ( 3,900.00) ( 3,900.00) ( 3,900.00)
Sub-Total ( 7,075.00) ( 10,305.60) ( 11,701.80) ( 11,701.80)

II. ARCHITECTURAL WORK

II-A Tiling Works


1 Floor: 200x600mm Ceramic Floor Tiles and Accent Wall (Lav and WC Area) - Light Wood design ( 30.00) pc ( 100.00) ( 30.00) ( 130.00) ( 3,900.00) ( 3,900.00) ( 130.00)
2 Floor: 300x600mm Ceramic Floor Tiles (Shower Area) - Sugar Finished Tiles ( 10.00) pc ( 205.00) ( 61.50) ( 266.50) ( 2,665.00) ( 2,665.00) ( 266.50)
3 Wall: 600x600mm Ceramic Wall Tiles (Shower Area) - Marble white & gray ( 20.00) pc ( 390.00) ( 117.00) ( 507.00) ( 10,140.00) ( 10,140.00) ( 507.00)
4 Wall: 600x600mm Ceramic Wall Tiles (Lav and WC Area) - Plain white ( 15.00) pc ( 370.00) ( 111.00) ( 481.00) ( 7,215.00) ( 7,215.00) ( 481.00)
5 Tile Adhesive ( 5.00) bag ( 370.00) ( 111.00) ( 481.00) ( 2,405.00) ( 2,405.00) ( 481.00)
6 Tile Grout ( 5.00) bag ( 90.00) ( 27.00) ( 117.00) ( 585.00) ( 585.00) ( 117.00)
7 Cement and Sand ( 3.00) bag ( 370.00) ( 111.00) ( 481.00) ( 1,443.00) ( 1,443.00) ( 481.00)
II-B Doors
1 D-01 Toilet Aluminum Panel Door 0.70m x 2.10m ( 2.00) pc 4,500.00 ( 1,350.00) ( 5,850.00) ( 11,700.00) ( 11,700.00) ( 5,850.00)
2 T&B Door Tubular Lever Type Lockset ( 2.00) pc 800.00 ( 240.00) ( 1,040.00) ( 2,080.00) ( 2,080.00) ( 1,040.00)
3 4"x3"x30 Hinges ( 6.00) pcs 520.00 ( 156.00) ( 676.00) ( 4,056.00) ( 4,056.00) ( 676.00)
4 Concrete Door Jamb 0.70 x 2.10m ( 2.00) set 3,000.00 ( 900.00) ( 3,900.00) ( 7,800.00) ( 7,800.00) ( 3,900.00)
II-C Carpentry / Cabinetry
1 Hanging Cabinets/Shelves including accessories & hardware ( 1.00) set 5,000.00 ( 1,500.00) ( 6,500.00) ( 6,500.00) ( 6,500.00) ( 6,500.00)
2 Lavatory Under Counter Cabinets including accessories & hardware ( 1.00) set 5,000.00 ( 1,500.00) ( 6,500.00) ( 6,500.00) ( 6,500.00) ( 6,500.00)
III-D Ceiling Works and Painting
1 Ficem Board Ceiling Finish including furrings, etc ( 1.00) pcs ( 1,750.00) ( 525.00) ( 2,275.00) ( 2,275.00) ( 2,275.00) ( 2,275.00)
2 Paint and Accessories, etc ( 1.00) set 3,000.00 ( 900.00) ( 3,900.00) ( 3,900.00) ( 3,900.00) ( 3,900.00)
Sub-Total ( 7,639.50) ( 33,104.50) ( 73,164.00) ( 73,164.00)

III. PLUMBING WORK

III-A Fixtures and Accessories


1 Japanese Type Water Closet inc fittings & accessories ( 1.00) pc ( 12,320.00) ( 3,696.00) ( 16,016.00) ( 16,016.00) ( 16,016.00) ( 16,016.00)
2 Lavatory Sink ( 1.00) pc ( 3,160.00) ( 948.00) ( 4,108.00) ( 4,108.00) ( 4,108.00) ( 4,108.00)
3 Stainless Floor Drain ( 2.00) pc ( 850.00) ( 255.00) ( 1,105.00) ( 2,210.00) ( 2,210.00) ( 1,105.00)
4 Stainless Faucet ( 1.00) pc ( 3,300.00) ( 990.00) ( 4,290.00) ( 4,290.00) ( 4,290.00) ( 4,290.00)
5 Shower (Rain Type) ( 1.00) pc ( 8,200.00) ( 2,460.00) ( 10,660.00) ( 10,660.00) ( 10,660.00) ( 10,660.00)
6 Stainless Grab bar - WC ( 1.00) pc ( 3,960.00) ( 1,188.00) ( 5,148.00) ( 5,148.00) ( 5,148.00) ( 5,148.00)
7 Stainless Grab bar- Shower Area ( 2.00) pc ( 1,200.00) ( 360.00) ( 1,560.00) ( 3,120.00) ( 3,120.00) ( 1,560.00)
8 Bathroom Mirror (ordinary 1,800) with LED Lights ( 1.00) pc ( 4,000.00) ( 1,200.00) ( 5,200.00) ( 5,200.00) ( 5,200.00) ( 5,200.00)
9 Bathroom Accessories (Towel holder, Tissue Holder etc.) ( 1.00) pc ( 5,000.00) ( 1,500.00) ( 6,500.00) ( 6,500.00) ( 6,500.00) ( 6,500.00)
III-B Water Line
1 PPR Pipe 3/4"Ø, ½"Ø, Gate valve, G valve Fittings, Teplon , etc ( 1.00) set ( 10,000.00) ( 3,000.00) ( 13,000.00) ( 13,000.00) ( 13,000.00) ( 13,000.00)
2 Sediment Water Filter ( 1.00) pc ( 1,750.00) ( 525.00) ( 2,275.00) ( 2,275.00) ( 2,275.00) ( 2,275.00)
Sub-Total ( 16,122.00) ( 69,862.00) ( 72,527.00) ( 72,527.00)

III. ELECTRICAL WORK

III-A Fixtures, Wiring and Accessories


1 Multi-point Water Heater ( 1.00) pc ( 8,200.00) ( 2,460.00) ( 10,660.00) ( 10,660.00) ( 10,660.00) ( 10,660.00)
2 Ceiling Exhaust Fan ( 1.00) pc ( 1,500.00) ( 450.00) ( 1,950.00) ( 1,950.00) ( 1,950.00) ( 1,950.00)
3 Two way switch (2-gang w/ LED) ( 2.00) pc ( 170.00) ( 51.00) ( 221.00) ( 442.00) ( 442.00) ( 221.00)
4 Convenience Outlet (Duplex Universal) ( 1.00) pc ( 180.00) ( 54.00) ( 234.00) ( 234.00) ( 234.00) ( 234.00)
5 Pinlight with Bulb ( 1.00) pc ( 500.00) ( 150.00) ( 650.00) ( 650.00) ( 650.00) ( 650.00)
6 Wire, Accessories and Other Misc. ( 1.00) set 5,000.00 ( 1,500.00) ( 6,500.00) ( 6,500.00) ( 6,500.00) ( 6,500.00)
Sub-Total ( 4,665.00) ( 20,215.00) ( 20,436.00) ( 20,436.00)

Total Direct Cost (Materials, Labor and Equipment) ( 177,828.80)


Labor and Equipment ( 35,501.50)
Materials Cost ( 142,327.30)
Contractor's Profit 8,891.44
Total Project Cost ( 186,720.24)