810 STEELKOTE PU FINISH
A semi gloss high solids two component polyurethane finish based on hydroxy acrylate and
aliphatic isocyanate.
Topcoat in epoxy and polyurethane coating systems for applications where high demands are set with respect to colour and gloss retention,
resistance to chemicals and mechanical properties. Due to aesthetic properties, pre-eminently suitable for application on sendzimir zinc-
coated substrates, and industrial objects as machinery, containers, trailers, agricultural equipment, etc.
PROPERTIES
Gloss Silky gloss (35 GU ± 5 at an angle of 60°)
Gloss disclaimer The final gloss level is partly determined by the structure of the substrate and the applied layer thickness
and may in some cases deviate from the above values.
Colour Standard colours (e.g. RAL, NCS)
Volume solids ca. 56 vol.% (mixed product, depends on colour)
VOC ≤ 410 g/l
Density At 20 °C ± 1.20 kg/l (mixed product)
Dry film thickness Standard: 60-100 μm (depends on application process)
Theoretical coverage At a dry film thickness of 60 μm: 9.3 m²/l
Practical coverage The performance in practice depends on various circumstances. As a guideline for airless spraying, for large
dimensions: 70% of the theoretical coverage. For small dimensions: 50% of the theoretical coverage.
Packaging 20 litre cans. Thinner in 25 litre jerry cans and 200 litre drums.
Shelf life In original well shut packaging 12 months, stored inside at temperatures between 5 °C and 40 °C.
Heat resistance Maximum 120 ºC (dry load)
Activator 903V (optional 973V)
Thinner PU5801
PRE-TREATMENT
Steel roughness Blasting profile 40 – 70 μm (1.6 – 2.8 mils) or power tool cleaned to minimum ISO-St3 / SSPC SP3
Untreated steel The surface needs to be pretreated according ISO12944 part 4 § 6.2.3. Remove grease, oil, dirt etc. using an
appropriate cleansing agent, for instance ENVICLEAN PR (for use see product sheet) and a high pressure
spraying pistol. Grit blasting to purity degree Sa 2½ in accordance with ISO 8501-1. After blasting remove all
dust from the entire surface with compressed air which is free of moisture and grease. Apply first coating
layer within 6 hours. In case the final coating layer is applied on the construction site, extra precautions
need to be taken.
Hot dip galvanized The surface needs to be pretreated according ISO12944 part 4 §6.2.3.4.1(sweep blast, with inert grit). See
also NEN5254 for Duplex systems. Remove grease, oil, dirt etc. using an appropriate cleansing agent, for
instance ENVICLEAN PR (for use see product sheet). Lightly blast the entire zinc surface with an inert
blasting agent (grain size: 0.3 - 0.5 mm, blasting pressure: 2.0 - 2.5 bar, nozzle opening: 6 mm minimum).
After blasting, the entire surface must have a uniform flat appearance. Depending on the zinc layer
thickness, in accordance with NEN5254, max. 5 - 10 μm of zinc can be removed. After blasting remove all
dust from the entire surface with compressed air which is free of moisture and grease. Apply first coating
layer within 2 hours.
Version date:
26-01-2024
1/3
810 STEELKOTE PU FINISH
WORKING PROCESS
Mixture 810 SteelKote PU Finish, 4 parts by volume.
Standard: Activator 903V, 1 part by volume.
Accelerated curing: Activator 973V, 1 part by volume.
Mixing instructions Mix base component and activator intensively, preferably using a mechanical mixing device. The
temperature of the mixed product should at least be 10 °C during application.
Potlife At 20 °C 6-8 hours (mixed product)
Thinning The paint can be applied with various spray equipment. The necessary amount of PU5801 depends on used
equipment, application method and temperature of the mixed product.
Application conditions The temperature should be at least 10 °C to obtain good drying behaviour and curing. The temperature of
the substrate should be at least 3 °C above dew point. Keep application area well ventilated during
application and drying in order to reduce evaporated solvents. This is necessary to acquire good drying
conditions and for the good of the applicators’ health.
Application method Preferably by means of airless or airmix spray equipment. When using brushes, a different film thickness
and possibly inferior flow will be achieved.
PROCESSING DATA
Airless spray Airmix Brush-roller Airspray
Thinner PU5801 PU5801 S5102 PU5801
Amount 0-5 vol.% 0-10 vol.% 0-5 vol.% 10-20 vol.%
Nozzle min. 0.015 inch min. 0.015 inch n.a. min. 2.0 mm
Flow pressure min. 140 bar min. 70 bar n.a. min. 3-4 bar
Dry film thickness 60-100 μm 60-100 μm 60 μm 60-100 μm
Cleaning tools: Immediately after application using thinner PU5801.
DRYING TIMES
10 °C 20 °C
Dust free 2 hours 1 hour
Manageable 12 hours 6 hours
Recoatable 16 hours 8 hours
Dry times with Activator 903V at 50% RH and standard dry film thickness of 60 μm. (method: BYK Drying recorder)
The maximum interval is unlimited, provided that the surface is clean and free of grease and/or oil. At a higher film thickness longer drying time should be taken in
account. During drying and curing the relative humidity should remain under 80%. Furthermore, any contact with moisture must be avoided during this period.
ENVIRONMENT AND HEALTH
Labelling In accordance with EU directions 67/548/EEG and in accordance with directives on hazardous materials.
Harmful and irritating in contact with skin, eyes and by inhalation. In case of eye contact, immediately wash
with large amounts of water and contact a medical expert. Do not eat, drink or smoke during application.
UN 1263
TOUCH UP
Touching up of damages or untreated parts at the construction site. Remove grease, oil, dirt etc. using an appropriate cleansing agent, for
instance ENVICLEAN PR (for use see product sheet). Remove the rust from all mechanical damage caused by transport and mounting,
untreated welding strips and welding spots and burns with rotating steel wire brushes, sanding discs or steel wire brushes and coarse
sandpaper to purity degree St3, in accordance with ISO 8501-1.Smooth the transition of cleansed parts to parts with intact coats of paint by
sanding and scraping.After sanding, remove all dust from the entire surface with compressed air which is free of moisture and grease. Then
touch up the object with the entire paint system, as described in this paint advice.Touch up light surface damages only with the product of the
top coat, as described in the paint advice.
Version date:
26-01-2024
2/3
810 STEELKOTE PU FINISH
MAINTENANCE
It is recommended to clean the surface regularly and to inspect the coats of paint for defects annually. Touch up any defects with the original
paint system.
TECHNICAL SUPPORT
Baril Coatings B.V. offers more than just advice. We offer a total service solution to the principal, the architect, the main contractor and the
painting contractor. In order to ensure the required performance in terms of durability, Baril Coatings offers full technical support and
supervision during implementation and completion of the application process, all in accordance with the ISO 12944 guideline.The supervision
and support provided by Baril Coatings does not relieve the painting contractor of his responsibility for the work carried out by him. The
painting contractor must thoroughly familiarize himself with the most recently updated product data sheets and the general terms and
conditions of Baril Coatings for protective coatings on steel. Baril Coatings is not responsible for application and the application conditions.
The final durability depends mainly on factors that are outside our control and for that reason we cannot accept any liability.
PROTECTIVE COATINGS
Our ‘protective coatings’ excel by virtue of their durability, flexibility, adhesion, easy application, anti-corrosion, and chemical and mechanical
resistance. This is the result of our vast competence in coating chemistry, combined with a good eye for our client’s requirements and wishes.
The coating systems conform to ISO 12944 and comply with international VOC guidelines.
WARRANTY AND DISCLAIMER
This Product Data Sheet supersedes those previously issued. Data, specifications, directions and recommendations given in this data sheet
represent only test results or experience obtained under controlled or specially defined circumstances. Their accuracy, completeness or
appropriateness under the actual conditions of any intended use of the Products herein must be determined exclusively by the Buyer and/or
User. The Products are supplied and all technical assistance is given subject to our UNIFORM CONDITIONS OF SALE AND DELIVERY FOR PAINT,
PRINTING INK AND OTHER PRODUCTS unless otherwise expressly agreed in writing. The Manufacturer and Seller disclaim, and Buyer and/or
User waive all claims involving, any liability, including but not limited to negligence, except as expressed in said UNIFORM CONDITIONS for all
results, injury or direct or consequential losses or damages arising from the use of the Products as recommended above, on the overleaf or
otherwise. Product data are subject to change without notice.
Version date:
26-01-2024
3/3