0% found this document useful (0 votes)
111 views2 pages

Afandi Fisco CV

Uploaded by

Andres Gonzalez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
111 views2 pages

Afandi Fisco CV

Uploaded by

Andres Gonzalez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Afandi S Fisco C.

Industrial & Mechanical engineer


z

Contact Information Professional Statement


Telephone No. Mechanical and Industrial Engineer with twelve years of experience | Pharma (FAT – SAT), Oil&Gas, Automotive and
(+34) 637 79 56 44 Elevation Industries | Project and Programme Management, Q&A production Management, Product Development,
E-mail Supply chain, Procurement and Sourcing B2B / B2C | Complex problem solving | Strategy development |
Afandi.fisco@gmail.com Multidisciplinary & International Culture |
Address
Kordilgade 16, 4400 Highly skilled analysis, planning, coordination and execution of projects. Properly organized team member with the
KALUNDBORG ability to work with great performance in a complex, busy and quick changing project environment. Effective
DENMARK communicator and business acuity to express ideas. Successful overseeing of projects with high quality standards to
achieve milestone.

Academic Qualifications Employment and Professional Experience

2023 Feb 2024 – Present (CONTRACT ENDING 11/2024)


MSc Project Management Project Manager FAT-SAT, Zaunergroup – Novo Nordisk DK
Universidad Rey Juan Carlos, Madrid, Spain Novo Nordisk PP5 pharma facilities – Kalundborg.

2013 • Planning, scheduling and execution of SAT on site.


BSc Industrial Engineering • Agile strategy and methologies for project handover.
Universidad de los Andes, Bogota, Colombia • Time and resource management.
• Data support analysis – Multiple data sources integration and monitoring - escalating bottlenecks issues.
2012 • Optimize data delivery, back-up and recovery.
BSc Mechanical Engineering • Build tracking system.
Universidad de los Andes, Bogota, Colombia • Client communication and agile adaptation to change request.
• Communication process improvement.

Skills & Competencies May 2023 – Feb 2024


Strong stakeholder management – Engineering Project manager - LCN Automotive Group Spain
and communication
Method statements • Responsible for the development of the RADAR project for GENERAL MOTORS driverless taxi division CRUISE.
Supply chain coordination • Responsible for Ferrari’s parking lock mechanism assembly line.
Collaboration and team integration • Ensure quality requirements for new and ongoing engineering projects.
Multi-discipline project coordination • Validate project timing and material allocation to reach milestone.
Strong planning capability - construction • Keep in touch with Commercial teams to ensure all customer documentation (PFMEA, PPAP, ETC) has been agreed
Allocation of manpower and setting priorities and signed off by all parties.
Strong verbal and written communication skill • Continuous improvement of all MAGNA current projects (BMW, FERRARI and MERCEDES).
Used to fast-paced and tight deadlines and targets • Responsible of the laser welding development.
Flexible and able to implement initiative easily
Experienced in man-management February 2023 – May 2023
Project Management Internship – Schindler Spain
Industry Experience
Pharmaceutical • KPIs performance analysis for project milestone forecast and expenditures.
Automotive • Prepared detailed reports to management director.
Oil and Gas • INEX-tool strategy development to reduce costs and improve efficiency on site.
Building Construction • Track and assign work hours to teams on site.
Elevation • Purchase order tracking.

References Jan 2022 – Oct 2022


NNE, Denmark AUTOMOTIVE BOM ENGINEER - LEAR CORPORATION AMERICA
John Egemar Andersen – Project Quality Manager
• Responsible for Creating, Modifying and Maintain the Bill Of Materials (BOM) for General Motors.
ZaunerGroup • Validates Customer Sales requirements for Current and Pre-Production Builds.
Christoph Wintersteller – Project Manager • Validate the accuracy of the data through analysing customer request to BOM comparison to ensure quality
Camilo Galeano – SAT Manager verification.
• Keep in touch with Commercial teams to ensure all customer documentation has been agreed and signed off by
LCN automotive group all parties, uploaded into the PMA systems so that we can proceed with any component change.
Lorenzo Caballero - Owner • Assist with all Bom change requests to ensure each level of the BOM is updated in accordance with the requested
Jose María Ruíz - CEO change and update PLM & PMA.
• Continuously being proactive by expanding my knowledge into other areas of the company (Failure Mode and
Schindler Spain Effects Analysis).
Javier Reneses – Project Manager
Nov 2019 - March 2020
Lear Corporation, US CONSTRUCTION CONSULTANT ENGINEER – DIAMONTE S.A.S
Jason Elias – Platform Manager
• Project engineer in mechanical systems: Piping, HVAC support team.
• Bioclimatic analysis.
• Procurement and sourcing for build materials.
• BIM modeling implementation.
• Quality standards compliance.
• Risk analysis and budget compliance.

AFANDI FISCO - TEL. (+34) 637795644 - EMAIL: AFANDI.FISCO@GMAIL:COM 1 of 2


Feb 2018 – Jan 2019
PROJECT ENGINEER – SHELL | OIL&GAS
Mechanical Engineer Oil & Gas Industry:

• Nationwide facilities inspection of SHELL gas stations.


• Fuel storage inspection and distribution for the final customer.
• Gas station staff training:
• Inspection of fuel supply network for SHELL gas stations.
• Equipment calibration.
• Ensure compliance of environmental regulations.
• Develop new sales strategies for gas stations.
• Develop standard compliance ASTM.
• Handover documentation.

Feb 2018 – Jan 2019


BIOCLIMATIC CONSULTANT ENGINEER - EKOOBIM S.A.S

• Nationwide facilities inspection of SHELL gas stations.


• Bioclimatic engineer for the new laboratories building of the Javeriana University in Bogotá.
• Development of a new computational model in C/C++ language to establish incident solar radiation in the new
building of engineering laboratories of the Javeriana University according to the US-ASHRAE regulations adapted to
Bogotá.
• Study of natural ventilation in transit spaces (e.g. corridors and atrium) according to US-ASHRAE
regulations
• English technical reports for managers.
• BIM project coordination with civil and architect:
• HVAC piping system analysis.
• Develop standard compliance ASTM.

Feb 2011 – Present


Founder & Owner – Afa Salvage cars

Business Experience:

• New business development methods and techniques.


• Development and selection of national & international suppliers.
• Procurement and sourcing (SCM) of the international supply chain (Allocate, transport, consolidation, dispatch
and delivery).
• Build Business Strategy and alliances.
• Effective Formation and leadership of work teams.
• Technical consultancy in automotive diagnosis and repair.
• CRM.

PAUL BAINES - TEL. 07397 372484 - EMAIL: P.BAINES@LIVE.CO.UK 2 of 2

You might also like