1. What are some SAP recommended guiding principles to achieve clean core operations?
Note:
There are 3 correct answers to this question.
A. Establish regular housekeeping tasks and procedures
B. Define roles and responsibilities as part of a process transformation office.
C. Establish an organizational structure, technical foundation, and transformation methodology for
clean core.
D. Establish release management.
E. Integrate clean core practices in the end-to-end value process chain.
2. What are some benefits of planning with planned independent requirements for finished
materials? Note: There are 2 correct answers to this question.
A. Reduced delivery times
B. Reduced times for final assembly
C. Option to use make-to-order production
D. Option to forecast planning for production resources
3. You are a consultant on an SAP S/4HANA Cloud greenfield project. Which of the following
aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2
correct answers to this question.
A. Efficiency
B. Accuracy
C. Stability
D. Timeliness
4. How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private
Edition? Note: There are 3 correct answers to this question
A. Use quotations for internal and external procurement.
B. Use purchasing costs for automated source prioritization
C. Use purchase orders for external procurement.
D. Use stock transfer reservations for stock transfer.
E. Use run schedule quantities for in-house production.
5. You have a scheduling agreement with a vendor. You want classic MRP to automatically create
schedule lines in case of material shortage. What must you do? Note: There are 2 correct
answers to this question.
A. Add the agreement to the quota arrangement and mark it for MRP relevance.
B. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
C. Add the agreement to the source list and mark it for MRP relevance.
D. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
6. Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2
correct answers to this question.
A. Variable-size item
B. Work item
C. WBS item
D. Preliminary item
7. Which of the following automation options can you use for production orders? Note: There are
2 correct answers to this question.
A. You can use mass processing to read PP master data for production orders.
B. You can use the production scheduling profile to automatically set orders to technically
complete.
C. You can use mass processing to set production orders to technically complete.
D. You can use trigger points to automatically create rework orders via confirmations.
8. How can a material availability check be triggered automatically for a production order? Note:
There are 2 correct answers to this question.
A. By mass processing
B. By capacity planning
C. By order release
D. By order confirmation
9. Which time elements does MRP consider in backward scheduling to determine the basic dates
for components from dependent requirements? Note: There are 2 correct answers to this
question.
A. Planned delivery time
B. Total replenishment lead time
C. Operation duration
D. In-house production time
10. You want to use capacity availability checks for production orders. Which settings have to be
made for this? Note: There are 2 correct answers to this question.
A. The scope of check must be defined in Customizing.
B. An overall profile must be assigned in the checking control.
C. The Relevant for Finite Scheduling indicator must be set.
D. A checking rule must be assigned to the work centers.
11. How can you set up a material as a phantom assembly? Note: There are 2 correct answers to
this question.
A. Select a special MRP type inside the material master.
B. Use a special item category in your material BOM (bill of material).
C. Define the special procurement type inside the material BOM (bill of material)
D. Select a special procurement type inside the material master.
12. What determines whether the planned independent requirements in demand management are
consumed by other requirements? Note: There are 2 correct answers to this question.
A. Planning strategy
B. Order type
C. Requirements type
D. Requirements profile
13. What happens when you set up detailed scheduling with the finite scheduling mode Insert
Operation? Note: There are 2 correct answers to this question.
A. Neighboring operations can be moved in both directions in order to create a slot.
B. Changes are automatically implemented in the complete collective order.
C. Scheduling of an operation takes place as close as possible to the desired date.
D. Sequencing on multi-activity resources is automatically updated.
14. How are dependent requirements for assemblies created? Note: There are 2 correct answers to
this question
A. They are created with exact times in Advanced Planning.
B. They are only created for multilevel bill of material (801\11) structures.
C. They are created together with the independent requirement for the finished product.
D. They are created on assembly level during the planning run.
15. What is a prerequisite for consumption of planned independent requirements to take place for
planning strategy 40 (Planning with final assembly)?
A. A sales order is created.
B. A sales order is delivered.
C. MRP creates a planned order.
D. MRP creates a dependent requirement.
16. Why do you use Engineering Change Management? Note: There are 2 correct answers to this
question
A. To save multiple changes for an object
B. To monitor and document object changes
C. To enable integration into a sales order
D. To monitor and document table changes
17. Which of the following are possible configuration steps when setting up the alert monitor in
Advanced Planning? Note: There are 2 correct answers to this question
A. Assign the alert profile to the overall profile.
B. Create an object selection variant for production-planning-related alerts.
C. Assign the overall profile to the authorization profile.
D. Create an object selection variant for alerts according to the priority of ATP categories.
18. You want to trigger in-house production of a semi-finished material before a sales order for the
corresponding finished good is received. Which planning strategy supports the consumption of
planned independent requirements by dependent requirements for the semi-finished material?
A. Planning with final assembly (40)
B. Planning at assembly level (70)
C. Production by lot size (30)
D. Assembly processing with production orders (82)
19. What information do you have to maintain to define the relationship between supply source
and demand source in the Kanban process? Note: There are 2 correct answers to this question.
A. Routing
B. Production supply area
C. Replenishment strategy
D. Work Center
20. What does forecasting in the demand planning cycle include? Note: There are 3 correct answers
to this question
A. Market intelligence
B. Past sales order quantities
C. Past quotation quantities
D. Past production planning quantities
E. One-off events
21. What are the advantages of collective orders? Note: There are 2 correct answers to this
question.
A. To perform availability checks across the entire collective order
B. To coordinate orders in the planning board for a collective order
C. To post confirmations for the entire collective order
D. To show the flow of batches across the entire collective order
22. You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the
past. How can you parameterize this in the strategy profile?
A. Specify a negative PP/DS horizon.
B. Specify a negative planning horizon.
C. Specify a negative offset time.
D. Specify a negative opening period.
23. During production order creation, several valid production versions are found. How does the
system choose the production version?
A. Planned order or material number
B. Alphanumeric or quota arrangement
C. Validity period or sales order
D. Lot size or material cost
24. What does the material type influence? Note: There are 2 correct answers to this question.
A. Whether the material is produced in-house, procured externally, or both
B. Which plant-specific and plant-independent statuses are allowed
C. Which document types and class categories are allowed
D. Which material master screens appear and in which sequence
25. You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer
decides to remodel an existing business process in accordance with clean core principles. Which
of the following SAP Signavio solutions can be used for the remodeling?
A. SAP Signavio Process Manager
B. SAP Signavio Process intelligence
C. SAP Signavio Process Governance
D. SAP Signavio Process insights
26. In documentation for MRP in Advanced Planning, you read that new orders are created through
infinite planning. What does this mean for the capacity requirements of a new order?
A. MRP assigns the capacity requirements automatically after the last scheduled operation for each
work center.
B. MRP creates the capacity requirements without considering existing load on the work centers.
C. MRP creates the capacity requirements at the earliest possible time.
D. MRP assigns the capacity requirements automatically to work centers with the ear1iest available
capacity.
27. For a production version to be valid and consistent, what requirements must be fulfilled? Note:
There are 3 correct answers to this question
A. The assigned routing and bill of material (BOM) must have the same validity period.
B. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
C. The consistency check must be performed
D. The lot size range must be within the lot size range of the assigned routing.
E. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
28. Where do you maintain the work center that represents the production line for repetitive
manufacturing? Note: There are 2 correct answers to this question
A. Routing
B. Repetitive manufacturing profile
C. Production version
D. Production cost collector
29. Your production planners are allowed to execute planning only for specific resources. How can
you achieve this in Advanced Planning (PP/DS)?
A. Use a propagation range.
B. Use a planning group.
C. Use a planning area.
D. Use a resource group.
30. You have maintained the parameters for simple discontinuation in the material master of a
component. Which business process will be affected if the available stock is zero and the
discontinuation date is in the past?
A. Kanban
B. Material requirements planning
C. Backflushing
D. Production order release
31. What is a work center hierarchy?
A. A group of work centers in a production line being used in sequence for production
B. A group of work centers in a parallel sequence that is used to split production quantities and
work on them in parallel
C. A group of alternative work centers providing a cumulative available capacity for production
D. A group of alternative work centers for production, structured in hierarchy levels by priorities
32. Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA
Cloud Private Edition? Note: There are 2 correct answers to this question
A. Order (pool) chart
B. Orders (dispatched) chart
C. Work center capacities chart
D. Capacity requirements chart
33. Under what circumstances can you change the material type for a material if stocks,
reservations, or purchasing documents exist? Note: There are 2 correct answers to this
question.
A. The same batch management level is used.
B. The same account category is used.
C. The quantity and value updates are the same.
D. The same base unit of measure is used.
34. Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud
Private Edition? Note: There are 2 correct answers to this question
A. 100% check
B. Simultaneous
C. Manual maintenance
D. First in first out (FIFO)
35. What will happen in the MRP run if you have created a new MRP-relevant material that
supports both in-house production and external procurement?
A. The MRP run does NOT consider the material; it has to be planned interactively.
B. The MRP run plans the material only if a quotation has been maintained.
C. The MRP run assumes in-house production.
D. The MRP run assumes external procurement.
36. Why would you use phantom assemblies? Note: There are 3 correct answers to this question
A. To make the assignment of components easier
B. To simplify the structure of bills of material
C. To reduce the number of changes required in bills of material
D. To increase the number of planning levels
E. To reduce the number of material masters
37. What could be the reason for multiple commitments, where several operations have the same
scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this
question.
A. The work center has several individual capacities.
B. The Finite Scheduling indicator is NOT set in the strategy profile.
C. The Change Planning Direction indicator is set in the strategy profile.
D. Alternative work centers are fully occupied.
38. What are the key features of using a low level code? Note: There are 2 correct answers to this
question
A. To determine how costs are rolled up by product costing
B. To determine the priority of alternative components inside ATP
C. To determine the sequence in which materials are planned in MRP
D. To determine the use of subitems inside material BOM (bill of material)
39. Which of the following questions do you have to answer before you start creating a bill of
material (BOM)? Note: There are 2 correct answers to this question
A. Which base unit of measure does the material have?
B. ls the material type allowed in the BOM?
C. What status does the BOM have?
D. In which storage location is the BOM required?
40. Your project uses process orders for the production of liquid chemicals. What can you define to
ensure that production flow only happens in suitable and physically connected tanks? Note:
There are 2 correct answers to this question
A. Resource hierarchy
B. Resource matrix
C. Resource selection
D. Resource network
41. Where do you maintain data to determine the duration of an operation for production? Note:
There are 2 correct answers to this question
A. Work center
B. Production version
C. Routing
D. Material master
42. What could be the reason for different combinations of components in a multiple bill of material
(BOM)? Note: There are 2 correct answers to this question
A. Manufacturing date
B. BOM header status
C. Lot size
D. BOM component status
43. Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data
objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this
question
A. Plant
B. Work center
C. Material
D. Production version
44. Which options do you have to plan both quantities and capacities during line loading in
repetitive manufacturing? Note: There are 2 correct answers to this question
A. Run PP/DS heuristics for repetitive manufacturing.
B. Run MRP with quota arrangement.
C. Run MRP with automatic selection of production version.
D. Assign planned orders manually in the planning table.
45. Which actions does the system perform by default when you save a confirmation for a finished
product in repetitive manufacturing? Note: There are 3 correct answers to this question.
A. Reduce run schedule quantities
B. Create associated capacity requirements.
C. Post production costs to the planned order.
D. Update statistics for the Business Information Warehouse.
E. Post the goods receipt for the finished product.
46. You want to insert an operation at a certain time on a work center in the graphical planning
table. The planning direction is forward. The desired dispatching time coincides with an
operation that has previously been dispatched. How does the insertion take place?
A. The new operation is inserted at the desired time; the previously dispatched operation is moved
backward.
B. The new operation is inserted at the desired time; the previously dispatched operation is moved
forward.
C. The previously dispatched operation stays as is; the new operation is inserted after the
dispatched operation.
D. The previously dispatched operation stays as is; the new operation is inserted before the
dispatched operation.
47. Your company produces a finished good based on a forecast and expects it to be in stock when
customers order it. If customers order more than the forecasted quantity, this must NOT have
any impact on the production program. Which planning strategy do you use?
A. Planning with final assembly (40)
B. Assembly processing with production orders (82)
C. Planning without final assembly (50)
D. Make-to-stock production (10)
48. What time element of midpoint scheduled operations can be reduced by reduction strategy
settings while dispatching? Note: There are 2 correct answers to this question.
A. Setup time
B. Move time
C. Teardown time
D. Queue time
49. Which of the following elements does MRP take into account during net requirement
calculation? Note: There are 2 correct answers to this question.
A. Production orders
B. Planned orders (firmed)
C. Planned orders (unfirmed)
D. ATP quantities
50. What does a line hierarchy in repetitive manufacturing represent?
A. A production line with prioritized alternative work centers
B. A production line with an alternative sequence in the routing
C. A production line with a parallel sequence in the routing
D. A production line with more than one work center
51. What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note:
There are 2 correct answers to this question
A. Planned order
B. Scheduling agreement schedule line
C. Purchase order
D. Production order
52. Which master data fields can have an impact on whether MRP creates planned orders or
purchase requisitions for a material? Note: There are 2 correct answers to this question.
A. MRP type
B. MRP group
C. Material type
D. Procurement type
53. Which information is required when you create a product master in SAP S/4HANA Cloud Private
Edition? Note: There are 2 correct answers to this question.
A. Product type
B. Industry sector
C. Base unit of measure
D. Selection screen for views
54. Mode selection is one of the scheduling options available with Advanced Planning in SAP
S/4HANA Cloud Private Edition. When can you use mode selection?
A. When several operations are maintained for one product
B. When alternative resources are used within one operation
C. When several production versions are maintained for one product
D. When multiple planned orders are scheduled in parallel on one resource
55. Your project team decides to use a make-to-order planning strategy for a strategic material in
discrete manufacturing What are the impacts of this decision? Note: There are 3 correct
answers to this question
A. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
B. Storage location MRP areas are required for sales-order-specific stock.
C. Both the reduction of make-to-order stock and requirements occur on delivery.
D. Production orders are created with sales order reference.
E. Net requirements calculation is carried out for every sales order individually.
56. You want to reduce planning efforts for B and C classified materials. Which planning procedure
do you recommend?
A. Advanced Planning
B. Consumption-Based Planning
C. Material Requirements Planning
D. Subassembly Planning
57. You are trying to create a production order and NO valid production version can be selected.
What could be the reasons? Note: There are 2 correct answers to this question
A. All production versions for the material are locked.
B. NO bills of material (BOMs) are assigned to the production versions.
C. NO production lines are assigned to the production versions.
D. The order lot size is NOT within the validity range of a production version.
58. For production orders, cost object controlling (COC) can be carried out on an order-related or
product-related basis. Which of the following do you have to consider? Note: There are 2
correct answers to this question
A. Product-related COC is used in manufacturing for co-products.
B. In order-related COC, individual production orders do NOT have cost segments.
C. In product-related COC, all costs are debited and credited to a product cost collector.
D. Order-related COC is beneficial in a flexible production environment
59. Your company manufactures materials whose characteristics differ for each manufacturing
process. Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able
to track and use this information in all areas of logistics?
A. Process order management
B. Engineering change management
C. Quality management
D. Batch management
60. What is the difference between co-products and by-products? Note: There are 2 correct
answers to this question.
A. Only co-products have movement type 531.
B. Only co-products appear in the process or production order settlement rule.
C. Only co-products have a non-zero inventory valuation.
D. Only co-products have movement type 101.
61. What options does a planner have in the planning table for repetitive manufacturing? Note:
There are 2 correct answers to this question
A. Reschedule and deallocate operations.
B. Create new production quantities.
C. Dispatch operations to work centers.
D. Change the assignments of production quantities to production lines.
62. What are the options if the Dispatched operation status is set for a production order operation?
Note: There are 2 correct answers to this question
A. You can reschedule the operation using lead time scheduling.
B. You can reschedule the operation using infinite scheduling in a planning table.
C. You can reschedule the operation using finite scheduling in a planning table.
D. You can reschedule the operation in the Manage Work Center Capacity app.
63. Where does the system check master data selection settings during the creation of planned
orders and production orders? Note: There are 3 correct answers to this question.
A. In the MRP controller
B. In the bill of material (BOM)
C. In the work centers
D. In the routing
E. In the production version
64. Which time elements are relevant for lead time scheduling of a production order? Note: There
are 2 correct answers to this question
A. Float after production
B. Total replenishment lead time
C. Opening period
D. Setup time
65. Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2
correct answers to this question.
A. Integrated Business Planning (IBP)
B. Capacity Requirements Planning (CRP)
C. Supply Chain Management (SCM)
D. Material Requirements Planning (MRP)
66. How can you achieve a feasible production plan in case of capacity constraints? Note: There are
3 correct answers to this question
A. Reduce the planning time interval.
B. Form optimum sequences to reduce setup times.
C. Execute an infinite production planning run for the critical resources.
D. Determine a time period with available capacity on the planning board.
E. Increase the capacity supply in a time-phased interval
67. What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note:
There are 2 correct answers to this question
A. Activating the reporting point backflush in the order dependent parameters
B. Activating the reporting point backflush in the work centers
C. Defining the operations as reporting points using the control key
D. Defining the relevant work centers in the routing
68. Which of the following are features of the clean core dashboard? Note: There are 2 correct
answers to this question
A. It can be used in all SAP S/4HANA Cloud editions.
B. Customers can use the dashboard in the dev, test, and production tenants.
C. Customers can grant access to the dashboard to partners.
D. It can be accessed by using SAP For Me.
69. You want to set up a make-to-order planning scenario for a finished product. The bill of material
contains two components: one should be procured for each sales order individually, and the
other should be procured jointly for all independent requirements. Forecasting for the finished
product is NOT possible. Which settings do you make to achieve this?
A. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP
indicator.
B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding
Individual/Collective indicator.
C. Choose planning strategy 50 (Planning without final assembly) and select the corresponding
Mixed MRP indicator.
D. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective
indicator.
70. In your plant, MRP is activated. Which options do you have to exclude a material from the MRP
run? Note: There are 2 correct answers to this question
A. Use a specific material group.
B. Use a specific material status.
C. Use a specific MRP type
D. Use a specific MRP list.
71. You want to create a production order. What methods can you use? Note: There are 2 correct
answers to this question
A. Create without material
B. Convert a purchase requisition
C. Create in Kanban process
D. Create by order release
72. Which of the following processes lead to an entry in the MRP planning file? Note: There are 2
correct answers to this question.
A. Changing the storage bin in warehouse management
B. Changing the procurement type in the product master
C. Changing the stock in inventory management
D. Changing the delivery address in transportation management
73. What can you use standard heuristics in Advanced Planning (PP/DS) for?
A. To solve planning problems for defined objects
B. To optimize costs and times in production plans
C. To automate material movements in material staging
D. To set default values in production master data
74. How would you define pegging in the context of Advanced Planning?
A. An evaluation to identify overstock situations in the balance between the receipt and the issue
elements after the production planning run
B. An evaluation that is ordered according to the bill-of-material structure of all related products
and represents the relationship between the receipt and the issue elements
C. An evaluation that is ordered according to the network structure of all related products and
represents the coverage of issue elements with receipt elements and stock
D. An evaluation to identify material or capacity shortages in the bill-of-material structure after the
production planning run
75. Which business processes are affected by settings in the order-type-dependent parameters?
Note: There are 2 correct answers to this question
A. Schedule production orders.
B. Check material availability.
C. Define integration with cost accounting.
D. Select master data.
76. How can you support a GMP (Good Manufacturing Practice)-compliant production process?
Note: There are 3 correct answers to this question.
A. GMP-compliant flag
B. Recipe approval
C. Batch record
D. Approved resources
E. Digital signature
77. Your quality department detects a deviation in a raw material batch. Unfortunately, this batch
has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
A. Use the batch where-used list.
B. Use batch derivation.
C. Use the Batch Information Cockpit.
D. Use batch determination.
78. What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2
correct answers to this question
A. Status
B. Scrap percentage
C. Installation point
D. Quantity