Lecture 11-1
Lecture 11-1
Quantitative Aptitude                                                                                       15
                     Time and Work, Pipes and Cisterns
1.    A can copy 100 pages in 5 hr. A and B              5.   Worker A takes 18 days to finish a job.
      together can copy 100 pages in 4 hr. In what            Worker B takes 27 days to finish the same
                                                              job. How long should it take for both A and B,
      time can B copy 20 pages?
                                                              working together to finish the same job?
      (a) 5 hr           (b) 4 hr
                                                                                          4
      (c) 8 hr           (d) 2 hr                             (a) 11 days         (b) 12 days
                                                                                          7
                                                                    4
2.    Mr. Smith can build a shed in x hr. After 2 hr,         (c) 10 days          (d) 13 days
                                                                    5
      he stops his work. What part of the shed is
      left unbuilt?                                      6.   A and B together can complete a piece of
            x−3                  x−4                          work in 15 days while A alone can complete
      (a)                  (b)                                the work in 21 days. How long will B alone
             x                    x
                                                              take to complete the job?
                2                x−2                                1                    1
      (c) 1 +              (d)                                (a) 52 days          (b) 52 days
                x                 x                                 2                    8
                                                                                         3
3.    Five men and two boys working together can              (c) 51 days          (d) 53 days
                                                                                         4
      do four times as much work per hour as a
      man and a boy can complete together in an          7.   Ravi can finish a piece of work in 21 days and
      hour. Compare the work of a man with that of            Prem can finish the same work in half the
                                                              time taken by Ravi. If they work together then,
      a boy.
                                                              what part of the same work can they finish in
      (a) 1 : 1         (b) 1 : 2                             a day?
      (c) 2 : 1         (d) 3 : 1                                                       1
                                                                  1
                                                              (a)                   (b)
                                                                  7                     5
4.    Two pipes can fill a tank in 18 min and 36 min
                                                                    1                    1
      respectively and a waste pipe can empty 2               (c)                  (d)
                                                                    4                    3
      gallons per minute. If all the three pipes work
      together, then the tank is filled in 15 min. The   8.   A certain number of men can complete a job
      capacity of the tank is:                                in 10 days. If there were 2 more men, the job
      (a) 120 gallons       (b) 60 gallons                    can be completed in 2 days less. Initially,
      (c) 240 gallons       (d) 180 gallons                   how many men were there?
                                                              (a) 10                (b) 8
                                                              (c) 6                 (d) 5
QA / Exercise - 15                                                                                          Page 1
9.    Two pipes A and B can fill a tank in 10 min          14.    To complete a certain work, Y would take
      and 15 min respectively. If both the pipes are              three times as long as X and Z together, and
      opened simultaneously, then how long will it                Z takes twice as long as X and Y together.
      take to fill the tank?                                      The three men together can complete the work
      (a) 6 min              (b) 8 min                            in 10 days. How long would each take to
                                                                  complete the work separately?
      (c) 10 min             (d) 5 min
                                                                  (a) 24, 40, 30 days
                                                                  (b) 30, 20, 10 days
10.   Pipe A can fill a tank in 18 min; Pipe B can fill           (c) 15, 20, 35 days
      the tank in 27 min and Pipe C can empty the                 (d) 30, 24, 40 days
      full tank in 36 min. If all of them work together,
      then find the time taken to fill the empty tank.     15 .   Five men can complete a piece of work in 1
                                                                  day whereas 4 women can complete the
                4
      (a) 16      minutes   (b) 20 minutes                        same piece of work in 3 days. How much
                7                                                 time will a man and 2 women take to complete
                                      3                           the same piece of work?
      (c) 12 minutes        (d) 15      minutes                        3                     8
                                      7                           (a) 1 days           (b) 2    days
                                                                       7                     11
11.   A works twice as fast as B and three times                          5                    2
                                                                  (c) 5      days      (d) 2     days
      as fast as C. If C can complete a job in 12 hr,                     11                   9
      then what part of the job can B complete in
      1 hr?                                                16.    A and B can complete a job in 8 days working
                                                                  together. B alone can complete it in 12 days.
            1                     1                               Both of them worked together for 4 days and
      (a)                   (b)
            8                     4                               then B left. How long will A take to complete
                                                                  the remaining work?
            1
      (c)                   (d) 1                                        3                    1
            2                                                     (a) 10 days          (b) 11 days
                                                                         4                    2
                                                                  (c) 16 days          (d) 12 days
12.   A tap can fill an empty tank completely in
      10 hr while another tap can empty the full           17.    Ten men can complete a work in 18 days.
      tank in 20 hr. If both the taps are kept open,              After 6 days, 5 more men joined. In how many
      then in how much time would an empty tank                   days will the remaining work be completed?
      gets filled?                                                (a) 6 days           (b) 12 days
      (a) 15 hr             (b) 20 hr                             (c) 8 days           (d) 10 days
      (c) 10 hr             (d) 40 hr
                                                           18.    A cistern can be filled by a supply pipe in
13.   A team of labourers promises to complete a                                                            4
                                                                  30 min and emptied by a waste pipe in       hr.
      piece of work in 10 days, but 5 of them do not                                                        5
      turn up. If the rest of the team takes 12 days              If both pipes are opened together, then in what
      to complete the work, then find the original                time will the cistern be filled?
      number of labourers.                                             1
                                                                  (a)     hr            (b) 1 hr
      (a) 32                 (b) 25                                    2
      (c) 35                 (d) 30                                       1
                                                                  (c) 1     hr         (d) 2 hr
                                                                          3
Page 2                                                                                      QA / Exercise - 15
19.   A is thrice as fast as B, and therefore is able     24.   A pump can fill a tank in 6 hours. Because of
      to finish a work in 60 days less than B. Find                                            1
                                                                a leak in the tank, it took 6 hours to fill the
      the time in which they can complete it,                                                  2
      working together.                                         tank. If the tank is full, then how much time
      (a) 20 days           (b) 10 days                         will the leak take to empty it?
      (c) 22.5 days         (d) 40 days                         (a) 52 hours           (b) 72 hours
                                                                (c) 91 hours           (d) 78 hours
20.   Three taps A, B and C together can fill a tank
                                                          25.   Two pipes A and B can fill a tank in 12 min.
      in 6 hours. After 1 hour C is closed and the
                                                                and 16 min respectively. If both the pipes are
      tank is filled in 8 more hours. Find the time in          opened simultaneously, after how much time
      which C alone can fill the tank.                          should B be closed so that the tank fills in
      (a) 16 hours           (b) 19 hours                       9 minutes?
      (c) 12 hours           (d) 8 hours                        (a) 4 min          (b) 2 min
                                                                (c) 5 min          (d) 8 min
21.   Tejas can complete as much work in 4 days
      as Aniket in 5 days. Ketan can complete as          26.   A, B and C can complete a assigned work in
      much work in 5 days as Aniket in 3 days. If               8, 16 and 24 days respectively. They all begin
      Tejas takes 30 days to complete a work, in                together. A continues to work till it is finished,
      what time would Ketan complete the same                   C leaves 2 days before its completion and B
                                                                leaves one day before its completion. In what
      work?
                                                                time will the work gets finished?
      (a) 50 days         (b) 62.5 days
                                                                (a) 5 days           (b) 3 days
      (c) 28 days         (d) 75 days                           (c) 4 days           (d) 2 days
                                                                (e) 1 day
22.   Rahul can finish a piece of work in 16 days.
      When he had worked for 4 days Rohit joined          27.   An amount of !99 is paid for a task which A
      him. If they complete the work in 4 more days,            can complete in 32 days, B in 20 days and C
      then in how many days can Rohit alone finish              in 12 days and D in 24 days. If A, B, C and D
      the job?                                                  work together, then how much money should
      (a) 6 days           (b) 4 days                           each receive?
      (c) 8 days           (d) 12 days                          (a) !15, !20, !50, !24
                                                                (b) !32, !20, !12, !24
                                                                (c) !15, !20, !12, !50
                     1                                          (d) !15, !24, !40, !20
23.   A can finish     th of a work in 12 days. B can
                     6                                          (e) !40, !20, !15, !60
      complete 40% of the same work in 40 days
                                                          28.   Two inlet pipes A and B can fill a tank in 15
                           1                                    min and 20 min respectively. A leak in the
      while C can finish     th of the work in 14 days.         pipe can empty the tank in 15 min. Initially
                           5
                                                                pipe A is opened for 5 minutes. Then, pipe B
      Who will complete the work first?
                                                                is also opened. How much more time will it
      (a) A              (b) B                                  take to fill the tank?
      (c) C              (d) At the same time                   (a) 10 mins            (b) 15 mins
                                                                (c) 20 mins            (d) 25 mins
                                                                (e) 12 mins
QA / Exercise - 15                                                                                       Page 3
29.   A can finish a piece of work in 4 days working     33.   Six men earn as much as 8 women, 2 women
      9 hours per day and B can finish it in 6 days            earn as much as 3 boys and 4 boys can earn
      working 7 hours per day. How long will they              as much as 5 girls. If a girl earns !50 a day,
      take to finish the work, working together                then each man earns
        2                                                      (a) !115            (b) !135
      8 hours a day?
        5                                                      (c) !125            (d) !150
      (a) 3 days           (b) 4 days                          (e) None of these
             4                      4
      (c) 3    days        (d) 2      days               34.   Harish, Ramesh and Suresh can finish a
            13                     13                          project in 22, 33 and 44 days respectively.
      (e) 5 days                                               How soon can they finish the project if they
                                                               work jointly?
30.   A and B each working alone can complete a
      job in 12 and 18 days, respectively. They                          2                    2
                                                               (a) 10      days     (b) 12      days
      started working together but B left after                         13                   13
      sometime and A finished the remaining job in
      6 days. After how many days from the start                         2
                                                               (c) 15      days     (d) 17.5 days
      did B leave?                                                      13
            3                                                  (e) None of these
      (a) 2 days         (b) 5 days
            5
            3                                            35.   A, B and C together can complete a job in 15
      (c) 3 days         (d) 4 days
            5                                                  days. After working with B and C for 5 days,
           2                                                   A leaves and then B and C take 20 days more
      (e) 3 days                                               to finish that job. In how many days can A
           5
                                                               complete the job alone?
31.   20 men and 30 women take 5 days to                       (a) 25                (b) 27
      complete a piece of work. It takes 20 days               (c) 32                (d) 30
      for the same work to be completed by 6 men               (e) None of these
      and 5 women. How many days will it take for
      40 men to complete the same work?                  36.   Two inlet pipes can seperately fill a tank in
      (a) 2 days          (b) 3 days                           20 min and 15 min respectively and a
      (c) 4 days          (d) 6 days                           waste pipe can empty the completely filled
      (e) None of these
                                                               tank in 12 min. On a certain day, the two inlet
                                                               pipes are turned on simultaneously to fill the
                                    1                          empty tank. But after 9 min it was found that
32.   A and B can mow a field in 3     days, A and C
                                    2                          the waste pipe was also left opened, it was
      in 4 days, B and C in 5 days. If all are working         closed immediately. How much additional time
      together, then in how many days they can                 is required to fill the tank completely?
      mow the complete field?                                  (a) 5.5 min            (b) 5 min
             74                                                (c) 6 min              (d) 6.2 min
      (a) 2     days       (b) 2 days
            103                                                (e) 6.5 min
             63
      (c) 2     days       (d) 3 days
            103
      (e) None of these
Page 4                                                                                   QA / Exercise - 15
37.   Twenty seven men can complete a piece of               42.   To complete a task in 45 days, a contractor
      work in 21 days working 6 hrs in a day. In                   employs 45 people. Upon reviewing the work
      how many days 18 men working 9 hrs a day                     after 30 days, he notices that only half the
      can complete twice the amount of work. Three                 task is completed. In order to meet the
      person of first group can complete same                      deadline of 45 days, then how many more
      amount of work in 3 days as 3 person of                      people must he employ now?
      second group can complete in two days.                       (a) 25             (b) 15
      (a) 34 days         (b) 42 days                              (c) 60             (d) 45
      (c) 28 days         (d) 21 days                              (e) None of these
      (e) 14 days
                                                             43.   In order to build a wall, A can lay bricks at 30
38.   A and B can complete a piece of work in                      bricks per minute and B at 40 bricks per
      10 days, B and C in 12 days while C and A in                 minute. How much time will it take for A and
      15 days. They all work together for 6 days                   B, working together to build a wall 14 m in
      and then A left. In how many more days can                   height and 6 m in length. If the dimensions of
      B and C together finish the remaining work?                  the bricks are length = 15 cm, height = 5 cm
      (a) 3 days           (b) 5 days                              and width = 7 cm. (Assume that area taken
      (c) 9 days           (d) 12 days                             by cement is negligible)
      (e) 4 days                                                   (a) 2 hrs 20 mins (b) 2 hrs 30 mins
                                                                   (c) 2 hrs 40 mins (d) 2 hrs 50 mins
39.   Twenty men can complete a job in 12 days.                    (e) None of these
      Four days after they started working, 12 more
      men joined them. How many days will they               44.   In a tank there are four outlets A, B, C and D.
      now take to complete the remaining job?                      These outlets can empty the tank in 10 min,
      (a) 7 days           (b) 5 days                              12 min, 15 min and 18 min respectively. If the
      (c) 4 days           (d) 8 days                              tank is full and all the outlets are opened how
      (e) 6 days                                                   much time will it take to empty the whole
                                                                   tank, the outlet A , B are closed after 1 min
40.   Two pipes can fill a cistern in 12 hours and                 and 2 min respectively and the outlet C is
      18 hours respectively. The pipes are opened                  closed 5 minutes before the tank gets empty.
      simultaneously and it is found due to leakage                                             8
                                                                           8
      in the bottom it took 48 min more to fill the                (a) 6      min       (b) 8      min
      cistern. When the cistern is full, then in what                      11                   11
      time will the leak empty it?                                       8
                                                                   (c) 7   min          (d) 9 min
      (a) 48 hours        (b) 84 hours                                  13
      (c) 72 hours        (d) 112 hours
                                                                   (e) None of these
      (e) None of these
                                                             45.   A and B working separately can complete a
41.   If two pipes are opened simultaneously, the
                                                                   piece of work in 6 and 8 days respectively. If
      reservoir will be filled in 6 hr. One pipe fills the
                                                                   they work for a day alternately, beginning with
      reservoir 5 hr faster than the other. How much
                                                                   A, then in how many days the work will be
      time does the slower pipe take to fill in the
                                                                   completed?
      reservoir?
                                                                   (a) 5 days           (b) 6 days
      (a) 10 hr               (b) 3 hr
      (c) 11 hr               (d) 20 hr                                  3                   3
                                                                   (c) 6 days           (d) 7 days
      (e) None of these                                                  4                   4
                                                                   (e) 7 days
QA / Exercise - 15                                                                                        Page 5
46.   A and B can separately do a piece of work in     49.   A can do a work in 12 days. When he had
      20 and 15 days respectively. They worked               worked for 3 days, B joined him. If they
      together for 6 days after which B was replaced         complete the work in 3 more days, in how
      by C. The work was finished in next 4 days.            many days can B alone finish the work ?
      The number of days in which C alone could              (a) 6 days        (b) 12 days
      do the work is                                         (c) 4 days        (d) 8 days
      (a) 30 days           (b) 45 days                      (e) 10 days
      (c) 40 days           (d) 35 days
      (e) 50 days                                      50.   A does half as much work as B in three-fourth
                                                             of the time. If together they take 18 days to
                                                             complete a work, how much time shall B take
47.   A and B can complete a piece of work in 8
                                                             to do it alone?
      days, B and C can do it in 12 days, C and A
      can do it in 8 days. A, B and C together can           (a) 30 days          (b) 35 days
      complete it in                                         (c) 40 days          (d) 45 days
      (a) 4 days           (b) 5 days                        (e) 15 days
      (c) 6 days           (d) 7 days
      (e) 8 days
Page 6                                                                                QA / Exercise - 15
                         Time and work
                efficiency of cat B                 3 2
                                                           1.0
                                                           54
time 11Am E
                                    B      30 days           At B
       A        20 days
MI work 60 unit
           Ac                 34Mt             Bc             2unitlday
                   Go
                               day
       Act BC        SUNI                           A MP
                                                            65      120 days
                         day
      Work         180
1
          Act
                 11
                                  9 unit
                                    day
                                                 Bc
                                                       g    Gygit
                                                                  day
          Act Bc
                             15
                                  Yay't
                                                time   18g
N2 Work 2
          Ac
                 at
                              BC
                                       to
          Act Be             Lot                to Io
                                                             I
      A        12 days             B      20   days
          AtB
     Wook       60 unit
                                               Be     Go    3Untlday
     AC        692       5
                             unitay
                                                            7 5 days
     Act Bc          8
                         Unify
                                               time    81
    A        todays          B     201995              C          days
At Btc
D Won             300
                                                                           20
                                       Be                  60 Cc    311
                          25                30,1
        Ac     304
                                 105
     Act     Bet Cc
                        time            Ef                         O
                  IT
                                        II
     AtB          15   days                 B 40days     A
                        12                  3 Unitda
                 Be             0
                                        8
             i     Act BC
                                    8                  time
                   Act 3                                         go.gg
                       tact                                              ID
                                                 A     20 days    B todays
                            10      days
M        At Btc
         C              won
                                        80 Unit
                                    8
AIL                   8,2
                                                  Cc
                                                         2
                            U                                    40
Ac               Eo                              time802
                                2
    Bc           Yo
                                  in
                                 war  10 days and
         B    can  build  a
A and                               E can destroy
                         whoop as
    day  respectively                     C work
20
                            If A  B  and
                30 days
     wall in                         day   they can
the                  in how many
            than
together
              work 9
complete the
             60 Unit
    Work
                  6
                      Fait
                                       Ba       G   34Gt
    Act
   Ce                  Yat
                             3    2         7
                       6
      Act Beta
                                        g
               time
                           E
Pippandcisti
  D                                                 20 Unit
                                        wok
           A    to his
           B    Long                                          1 unit
                                               Be       29
                               2
               Ac        28
Ac Be 1 203 4
WON 30
A 10 B 15
                3             Be       2
        AC
                                                        t
                          3 2      2
           Act Be
D
          Won    1004mi
                         Unit no
           Is    10g
                 1 0    5 unit hr
           Cc            4 unit hr
                 10,1
                 won     done by AO
another
                                                     720
           work done by A               32      0
                                                10
Total
                          17212
                      LLM 24,32 60
Work    480 unit
  Ac     YE    202ft
                            Be   439      12 t
         4
 Ce            Equity
               20 15 8           43   8   2580 unit
  ActBIG                     23 2          460 Unit
                   15 8
                                                 unit
       BetCc                              Tou
                    work              220
        remaing            2181
 CEX–5315/P1BS/19                  Quantitative Aptitude - 15                                                            P-1(BS)
                              Time and Work, Pipes and Cisterns
                                  Answers and Explanations
   1       b      2     d     3     c    4      a   5    c   6      a     7     a      8        b            9     a     10     d
  11       a      12    b    13     d   14      a   15   b   16     d    17     c     18        c        19        c     20     a
  21       b      22    c    23     c   24      d   25   a   26     a    27     d     28        c        29        d     30     c
  31       c      32    a    33     c   34      a   35   d   36     c    37     c     38        a        39        b     40     c
  41       a      42    d    43     c   44      b   45   c   46     c    47     c     48        a        49        a     50     a
                                                                                                     1
                           2                                 6. a   (A + B)’s 1 day’s work =
2. d   Smith’s 2 hr work =                                                                          15
                           x
                      2 x–2                                                                1
       Work left = 1– =                                             A’s 1 day’s work =
                      x    x                                                               21
                                                                                                1
4. a   Work done by the waste pipe in 1 min.                 7. a   Ravi’s 1 day’s work =          and
                                                                                                21
            1  1    1 
       =     −     +
           15  18 36                                                                         1           2
                                                                    Prem’s 1 day’s work =                =
                                                                                                   1         21
                1                                                                               10
       =−         (minus sign means emptying)                                                      2
               60
                                                                    ∴ (Ravi + Prem)’s 1 day work
                    1                                                   1   2   3 1
       ∴ Volume of    part = 2 gallons                              =     +   =  = th part of the work.
                   60                                                   21 21 21 7
       ∴ Capacity of the tank = 2 × 60 = 120 gallons.
                                                             8. b   Let initial number of men be x.
                              1                                     Number of days is 10, so number of man days is 10x.
5. c   A’s 1 day’s work =       ,                                   If there were 2 more men i.e. (x + 2), it can be completed
                             18
                                                                    in 8 days.
                              1                                     So, 10x = (x + 2)8
       B’s 1 day’s work =                                            ⇒ x = 8.
                             27
QA / Exercise - 15                                                                                                          Page 1
                                                        1                               1 1 1 1
9. a    Part of the tank filled by A in 1 minute =                                       + + =                   ...(iii)
                                                       10                               a b c 10
                                                                                       Subtracting (i) from (iii), we get b = 40 days.
                                                     1
        Part of the tank filled by B in 1 minute =                                     Subtracting (ii) from (iii), we get c = 30 days.
                                                    15                                 Substituting the values of b and c in (iii), we get
        Part of the tank filled by both the pipes in one minute                        a = 24.
                                                                                       ∴ X, Y and Z complete the work in 24, 40 and 30 days
          1    1 1
        =   +    =                                                                     respectively.
         10 15 6
        ∴ The tank can be filled in 6 minutes.                                                                       1
                                                                               15. b   One man can complete            th part of the work in one
                                                                                                                     5
10. d   Work done by the 3 pipes together in 1 minute                                  day.
           1   1   1   5   1   7                                                                                            1
        =    +   −   =   −   =                                                         Also, 1 woman can complete             th part of the work in
          18 27 36 54 36 108                                                                                               12
                                                                                       one day.
                                             108     3                                 Therefore, part of the work completed by a man and
        So, the empty tank will be filled in     = 15 minutes.
                                              7      7
                                                                                                   1 2 1 1 11
                                                                                       2 women =    +    = + =
11. a   Time taken by A, B and C to complete a work                                                5 12 5 6 30
        = 1x, 2x and 3x.                                                               Hence, the number of days required for completing the
        3x = 12 ⇒ x = 4                                                                                      30    8
        Time taken by B to complete the work = 8 hr                                    piece of work =          =2    days .
                                                                                                             11    11
                                       1
        ∴ In 1 hr, B will complete       th of the work.
                                       8                                                                             1
                                                                               16. d   (A + B)’s 1 day’s work =        ;
                                                                                                                     8
        Alternate method:
                                                                                                                     1                    1
        According to the question,                                                     (A + B)’s 4 day’s work =        ; Remaining work =
        A = 2B and A = 3C                                                                                            2                    2
                                                                                                                     1 1        1
                               3                                                       Work completed by A in 1 day =  −     =
        Thus 2B = 3C ⇒ B =         C                                                                                 8 12 24
                               2
                                                                                       ∴ A alone takes 24 days to complete the job.
                                                   1
        Now work completed by C in 1 hr =                                                               1
                                                   12                                  Since only         of the work is left, A will complete the
                                                                                                        2
                                               3        1       1
        ∴ Work completed by B in 1 hr =            ×        =       th part.                                   1
                                               2       12       8                      remaining work in         × 24 = 12 days.
                                                                                                               2
Page 2                                                                                                                     QA / Exercise - 15
                                                                                                       1
18. c   Time required to fill the cistern =
                                                  1
                                                          =
                                                              1         22. c   Rahul’s 1 day’s work =
                                                      5       3                                       16
                                                 2–                             Number of days Rahul worked = 4 + 4 = 8
                                                      4       4
                                                                                                                         1 1
          4       1                                                             ∴ Total work done by Rahul = 8 ×          =
        =   hr = 1 hr                                                                                                   16 2
          3       3
                                                                                                   1
                                                                                The remaining        of the work is done by Rohit in
19. c   !A = 3 B                                                                                   2
        Let A takes x days to complete the work alone.                          4 days.
        ∴ B takes (x + 60) days to complete the work alone.                     ∴ Complete work will be done by Rohit in
                               1                                                     2
        A’s one day’s work =                                                    4×     = 8 days.
                               x                                                     1
                                     1
        B’s one day’s work =
                                  x + 60                                23. c   Whole work completed by A = 12 × 6 = 72 days.
          1     3
                                                                                Whole work completed by B =  40 ×
        ∴ x = x + 60                                                                                                100 
                                                                                                                         = 100 days.
                                                                                                                    40 
        ⇒ x + 60 = 3x ⇒ 2x = 60 ⇒ x = 30 days                                   Whole work completed by C = 14 × 5 = 70 days.
        A can complete the work in 30 days.                                     ∴ C will complete the work first.
        B can complete the work in 90 days.
                    1   1   4   2                                                                                       1   1
        In 1 day      +   =   =   work is completed.                    24. d   Work done by the leak in 1 hour =         −
                   30 90 90 45                                                                                          6 61
                                                                                                                             2
                                  45
        ∴ The work will take         days = 22.5 days.
                                   2                                                                               1 2      1
                                                                                                                    =−   =
                                                                                                                   6 13 78
                                             1                                  ∴ The leak will empty the tank in 78 hours.
20. a   (A + B + C)’s 1 hour’s work =
                                             6
                                                                        25. a   Let B closed after x minutes. Then, part filled by
                                    1 5                                         (A + B) in x min. + part filled by A in (9 – x) min. = 1.
        Remaining part of tank = 1 − =
                                    6 6                                             1   1                1
                                                                                ⇒ x   +    + (9 − x ) × 12 = 1,
                                             5                                      12 16 
        Time taken by (A + B) to fill this     of the tank = 8 hours.
                                                                                  7x (9 − x )
                                             6
                                                                                ⇒     +       = 1 ⇒ x = 4 min.
                                                  48                               48    12
        ⇒ A and B together fill the tank is          hours                      Hence, B must be closed after 4 min.
                                                  5
        Now, we know A + B + C = 6 hours
                                  48                                                                        1
                         A +B =      hours                              26. a   A in 1 day can complete
                                                                                                            8
                                                                                                              th of work.
                                  5
              1 5       1                                                                                    1
        ∴ C=    −    =                                                          B in 1 day can complete
                                                                                                            16
                                                                                                               th of work.
              6 48 16
        Hence, C alone can fill the tank in 16 hours.                                                     1
                                                                                C in 1 day can complete     th of work.
                                                                                                         24
21. b   Ratio in number of days taken by Tejas:Aniket:Ketan
         = 12 : 15 : 25                                                         Let the work completed in x days.
        Let us assume that Ketan can complete the work in                               1     1             1
        x days. Then,                                                           Then,     x+    [ x – 1] +    [ x – 2] = 1
                                                                                        8    16            24
         30 12
            =                                                                        6x + 3x – 3 + 2x – 4
          x   25                                                                ⇒                         = 1 ⇒ 11x – 7 = 48
        ⇒ x = 62.5 days.                                                                      48
                                                                                ⇒ 11x = 55 ⇒ x = 5 days.
QA / Exercise - 15                                                                                                               Page 3
27. d   Ratios of one day’s work of A, B, C and D                    31. c   (20 M + 30 W) × 5 = (6 M + 5 W) × 20
            1    1   1   1                                                    ⇒ 20 M + 30 W = 24 M + 20 W
        =      :   :   :   = 15 : 24 : 40 : 20                                          2
           32 20 12 24                                                       ⇒1W=         M
        Total amount = !99                                                             5
                                                                             ∴ 30 W = 12 M
                      15                                                     Now, we have 20 M + 30 W takes 5 days
        A’s share "      × 99 = !15
                      99                                                     or (20 + 12) men can complete the work in 5 days
                                                                                                                32× 5
                      24                                                     40 men will complete the work in =       = 4 days.
        B’s share =      × 99 = ! 24                                                                             40
                      99
                      40
                         × 99 = ! 40                                          1 1 2
        C’s share "                                                  32. a    + =
                      99                                                     A B 7
                      20                                                     1 1 1
        D’s share "      × 99 = ! 20                                          + =
                      99                                                     B C 5
28. c   Rate of pipe A and the leakage is same i.e. 15 min.                   1 1 1    1 1 1  2 1 1 103
                                                                              + =   ⇒2 + + = + + =
        Thus, when only ‘A’ is opened, by the end of 5 min, the               A C 4    A B C  7 5 4 140
        tank would still be empty.
        When A, B and leak work together,                                        1 1 1  103
                                                                             ⇒ + + =
        Construction by pipe A = destruction by the leak in the                  A B C  280
        tank. Hence, only pipe B will help in filling the tank.              A, B and C together can complete the work in
        Hence, it takes 20 min to fill the tank.
                                                                             280     74
                                                                                 =2     days.
29. d   A can complete the work in 4 × 9 = 36 hours                          103    103
        B can complete the work in 6 × 7 = 42 hours
                                         1   1   13                  33. c   Earning of men, women, boys and girls are
        ∴ (A + B)’s 1 hour’s work =        +   =                                              8
                                        36 42 252                            1 man earning =     woman earning
                                                                                              6
                                          252                                                    3
        ∴ Both will finish the work in        hrs.                           1 woman earning =       boy earning
                                          13                                                     2
                           2            252 5                                                5                 5
        Number of days of 8 hrs. each =    ×                                 1 boy earning =    girl earning =   × 50
                           5            13 42                                                4                 4
                                                                                                8 3 5
                                                 30     4                    ∴ 1 man earning = × × × 50 = !125.
                                             =      =2    days.                                 6 2 4
                                                 13    13
                                                                             Alternate method:
                                      1        work                          Initials used
30. c   A’s work for 6 days = 6 ×       work =
                                     12         2                            Man : M, Woman : W, Girl : G, Boy : B
                                                                             Now according to the question
                          1                                                  6M = 8W
        The remaining       work was completed by A and B
                          2                                                  2W = 3B
        together.                                                            4B = 5G
                                            1   1   5                                    8       3       5          5
        Work completed by A and B in a day =  +   =                          Thus, M =       ×       ×       ×G =       × 50 = !125.
                                           12 18 36                                      6       2       4          2
        ∴ Number of days they worked together
                                                                     34. a   Given Harish, Ramesh and Suresh can finish a project
           1                                                                 in 22, 33 and 44 days respectively. Let they take x
           2   36 18     3                                                   days to complete the job while working together.
        =    =    =   = 3 days .
          5    10   5    5
                                                                               1    1   1                         6+4+3
          36                                                                     +   +    x = 1 ⇒                            x =1
                                                                                22 33 44                           132 
                                3
        Hence, B left after 3     days from the start of the work.                   132                        2
                                5                                            ⇒ x=                ⇒ x = 10         days .
                                                                                      13                       13
Page 4                                                                                                                   QA / Exercise - 15
35. d   As A, B and C together require 15 days to complete the                                              32   2
                                                                                  32 men 1 day’s work =        =
                                1                                                                           240 15
        job, they can complete    rd of the job in 5 days.
                                3                                                      2
        Therefore, amount of work left when A leaves is                           Now,   work is completed by them in 1 day.
                                                                                      15
              1 2                                                                   2                              15 2
        1–       = . It is given that B and C together take 20                    ∴   work is completed by them in   × = 5 days.
              3 3                                                                   3                               2 3
                   2
        days for rd work. Therefore, B and C need 30 days
                   3                                                                                                         1   1     5
                                                                          40. c   Work completed by two pipes in 1 hour =      +    =
        to complete the job.                                                                                                12 18 36
        A’s 1 day’s work                                                          ∴ Time taken by these pipes to fill the tank
        = (A + B + C)’s 1 day’s work – (B + C)’s 1 day’s work                       36     1
                                                                                  =    = 7 hours = 7 hr 12 min.
            1     1    1                                                             5     5
        =      –     =                                                            Due to leakage, time taken = 7 hr. 12 min. + 48 min.
           15 30 30
        A can finish the work in 30 days.                                                                    = 8 hours.
                                                                                  ∴ Work completed by (two pipes + leak) in an hour
36. c   Let total work be 60 units. 1st tap fills 3units per minute,                  1
        2nd tap fills 4 units per minute and waste pipe empties                   =
                                                                                      8
        5 units per minute. So, when opened together all three                                                              5 1 1
        will fill (3 + 4 – 5) = 2 units per min. Hence, in first 9 min,           Work completed by the leak in 1 hour =      − =
                                                                                                                           36 8 72
        18 units of tank is filled. Since the waste pipe is closed                ∴ Leak will empty the full cistern in 72 hours.
        ∴ The remaining 42 units will require
          42
                   = 6 min to fill.
         3+4                                                              41. a   Let the slower pipe takes x hr to fill the reservoir. Then,
                                                                                   1        1      1
37. c   From the given data men in the first group are two-third                     +           =
                                                                                   x    ( x + 5)   6
        as efficient as men from the second group. Hence, 27
                                                                                  ⇒ 12x + 30 = x2 + 5x ⇒ x2 – 7x – 30 = 0
                                                 2
        men of the first group are equivalent to   × 27                         ⇒ x(x – 10) + 3(x – 10) = 0
                                                 3
        = 18 men of second group. Further more                                    ⇒ (x – 10) (x + 3) = 0, i.e x = 10 hr.      (! x ≠ −3)
         (Men × hours per day × number of days ) = cons tan t
                        Work done                                                             1
                                                                          42. d   In 30 days,    of the work was done by 45 people.
        18 × 6 × 21 18 × 9 × D                                                                2
                     =           ⇒ D = 28 days
             x            2x                                                      So, 45 people require 60 days to complete the work.
                                                                                  1 person requires 60 × 45 days.
                                   1                                              ∴ To complete the entire job in 15 days,
38. a   (A + B+ C)’s 1 day’s work =
                                   8                                               60 × 45
        Work completed by A, B and C in 6 day’s                                               = 180 people are required.
             1 3                                                                      15
        = 6× =                                                                                              180
             8 4                                                                  Only half the work is left,   = 90 people are
                                                                                                             2
                              3 1
        ∴ Remaining work = 1 − =                                                  required. As there are already 45 people, 45 more
                              4 4
                                                                                  people are required to complete the job.
                                                  1
        ∴ B and C can finish the remaining          th of the work in
                                                  4                       43. c   If A and B work together, then they can lay 30 + 40
        1                                                                         = 70 bricks per minute.
          × 12 = 3 days.                                                          = (70 × 15 cm × 5 cm) of the wall in 1 minute
        4
                                                                                  (Note → here width of brick = width of wall.
39. b   (20 × 12) men can complete the work in 1 day.                             So, ‘w’ of brick is not required)
                                                                                  Dimensions of the wall = 14 m × 6 m
                                   1
        ∴ 1 man’s 1 day’s work =                                                                14 × 6 × 100 × 100
                                  240
                                                                                  ... Total time =                 (convert cm to m)
                               1       1                                                            70 × 15 × 5
        20 men 4 day’s work =    ×4 =
                              12       3                                          = 160 minutes = 2 hrs and 40 mins.
                            1 2
        Remaining work = 1 − =
                            3 3
QA / Exercise - 15                                                                                                                Page 5
44. b   Let us consider that the total work = 360 units                                    8
                                                                             A+B+C=
        A          B         C            D                                              24 × 2
        10        12         15         18 " (minutes )                                  1
                                                                             A+B+C =
        36        30          24        20 " ( units / minutes )                         6
                                                                             A + B + C complete a work in = 6 days.
        Let us consider that it takes ‘x’ minutes to empty the
        completely full tank.
        ∴ The outlet C does (x – 5 ) × 24 units                      48. a   X is 3 times as fast as Y. Therefore, if x complete a
        The outlet D does x × 20 units.                                      work in 1 day y take 3 days to complet it.
        ∴ 36 × 1 + 30 × 2 + (x – 5) × 24 + 20x = 360                         Therefore, the difference between the working days
                 8                                                           is 2.
        ⇒x=8        min.                                                     But in this case the difference is 40 days.
                 11
                                                                             Therefore, A completes a work in 20 days and B
                                                                             completes the work in 60 days.
                                      1 1 7
45. c   (A + B)’s 2 day’s work =       + =                                   A and B together competes a work
                                      6 8 24
                                                                                  1   1   3 +1    1
                                                7   21 7                     =      +   =      =    = 15 days.
        Work completed in 3 pairs of days = 3 ×   =   = ,                        20 60     60    15
                                                24 24 8
        10   6 4                                                                                            4
           +  + =1                                                           A + B complete work in = 3 ×     = 4 days
        20 15 x                                                                                             3
             1 2 4                                                                                  1 1   1
        ⇒     + + =1                                                         B’s one day work =      −  =
             2 5 x                                                                                  4 12 6
             5+4 4                                                           ∴ B will take 6 days to complete the work.
        ⇒        + =1
              10  x
                                                                     50. a   A complete half as much work as B in three-fourth of
          4       9   1
        ⇒   = 1−    =                                                        the time.
          x      10 10
                                                                              ⇒ A can complete whole work as B in one and a half
        ∴ x = 10 × 4 = 40 days.                                              times.
                                                                             Let the number of days taken by A and B to complete
47. c   A + B complete a work in 8 days                                      the same piece of work be 3x and 2x respectively.
        B + C complete a work in 12 days
                                                                                                1     1 
        C + A complete a work in 8 days                                      A and B completes     +     work in 1 day.
                                                                                                3x   2x 
                                  1 1 1
        (A + B + C) can complete  +   +  work in one                            1   1   1
                                  8 12 8                                   ∴      +   =
        day.                                                                     3x 2x 18
                           3+2+3                                             ⇒ x = 15
        2(A + B + C) =
                             24                                              ∴ B completes the work in 2x days = 30 days.
Page 6 QA / Exercise - 15