0% found this document useful (0 votes)
62 views3 pages

PinkyPatel (13y 0m)

Uploaded by

pankaj1999pk.rot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views3 pages

PinkyPatel (13y 0m)

Uploaded by

pankaj1999pk.rot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

PINKY PATEL

Correspondance Address:
Assistant Manager, Project Planning & Management
Kotputli Cement Works (A unit of UltraTech Cement Limited),
Jaipur, Rajasthan Pin- 303108 (Phone: +91 7230010135/ +91 8821876372)
Email: pinkypatel.patel5@gmail.com

ELECTRICAL ENGINEER HAVING 12.7 YEARS OF EXPERIENCE


OBJECTIVE
To excel as an Engineering professional with a growth oriented and reputed organization that utilizes
my expertise to the optimum possible and provides opportunities to achieve both personal and
professional goals.

PROFILE SUMMARY
 Assistant Manager, Project Management at Kotputli Cement Works (Brown field Project) since
06.01.2023 to till date
 Assistant Manager, Project Management at Pali Cement Works (Green Filed Project) since 20.11.2021 to
03.01.2023, successfully plant commissioning done.
 Senior Engineer in Technical Services department at Sidhi Cement Works (UltraTech Cement Ltd) since
30.08.2019 to 16.11.2020 (2 Years).
 Started as GET to grown upto Engineer in Previously worked unit Rawan Cement Works (UltraTech Cement
Ltd) – Completed Brown field Project (as an Electrical Engineer), Looked Electrical Maintenance & Technical
Services since 01.08.2011 to 27.08.2019 (8 Years).

CORE COMPETENCIES
Project Planning & Management (Primavera P6)  Electrical Erection and Commissioning 
Electrical Maintenance  Energy Conservation  Energy Audits  MID Activities (Vibration
measurement, thermography & alignment)  Maintenance Management  SAP Management
 Operation excellence (WCM)

PROFESSIONAL EXPERIENCE & DEVELOPMENT

Kotputli Cement Works – Brown Field Project (UltraTech Cement Limited - From 06.01.2023 to
till)
KEY JOBS EXECUTING:
Successfully pyro commissioning done in 15 months.
→ Project initiation, planning, execution & tracking (Micro planning of Civil, Mech., E&I, Process activity with
successor & predecessor in Primavera)
→ Drawing Management - monitoring All function related drawings availability with HO as well as Suppliers
→ Resource Management - Equipments Delivery tracing & Monitoring with suppliers, other resources like
lifting/shifting etc. monitoring
→ Day basis setting realistic deadlines same to communicate them consistently to teams
→ Supporting Project execution teams of cross functional related, timely risk/delay awareness etc.
→ Various MIS & Dashboard preparation for Project progress & Highlights
→ Equipments readiness tracking along with supplier’s erection & operational deputed personals (All functions)
→ Team Management & development

Pali Cement Works – Green Filed Project (UltraTech Cement Limited -From 27.11.2021 to
02.01.2023)
KEY JOBS EXECUTED:
Successfully commission Pre-Clinker on 30th Nov’22 (Feed by 4th Dec’22) & Post-Clinker on
12th Dec’22
→ Define project’s scope, determining availability of resources, strategic Planning & Analysis
→ Project Scheduling – All function’s & Day to Day monitoring Planning Vs Achieved
→ Day basis setting realistic deadlines same to communicate them consistently to teams
→ Supporting Project execution teams
→ MIS & Dashboard preparation for Project Highlights

Sidhi Cement Works (UltraTech Cement Limited - From 30.11.2019 to 23.11.2021)


KEY JOBS EXECUTED:
→ Planning & monitoring of Shutdown activity through SDM software.
→ MID Activities (Vibration, Alignment, Thermography, UT & MPT).
→ Energy Monitoring & Job execution
→ Conductions & Participation in Process studies & Energy Audits
→ SAP PM Power User (PM Compliance & Various reports preparation)
→ MIS Preparation related to business level & unit level
Additional Job:
→ UTCL level Shutdown task force details preparation for time reduction with action plan
→ UTCL level Reliability improvement taskforce details preparation with action plan

Rawan Cement Works Brown filed Project & Operation (UltraTech Cement Limited - From
01.08.2011 to 26.08.2019)
KEY JOBS EXECUTED:

→ Electrical Equipment’s Operation & Maintenance


→ Executed Electrical equipment’s Erection & commissioning of 10,000 TPD close circulating project (132KV Switch
Yard, HT-LT Pannel of Smart MCC), CEIG (Govt.) Approval for All HT Equipment’s
→ Executed Shutdown Planning & Execution in MS-Project & SDM software linked with SAP
→ Worked in technical services – PM Management, Energy Cell & Inspection cell
→ Process optimization - False air & bag filter study
→ WCM (GRT, KFA, Area Ownership, BCE, Maintenance Audit & External Audits i.e. IMS, Awards & ISO)

PROJECTS COMPLETED (At Rawan Cement Works)

 132 KV Interconnection Lines between Rawan to Hirmi (Grid Surrender at Hirmi).


 Specific power consumption reduction of RWCW Unit-2 to <50 KWh/MT of Clinker (Various Encon Projects done)
 Specific power reduction from 21 kWh/MT of Material to 17.5 kWh/MT of Material in Line-1 Raw Mill
 Conversion of all old ESPs (Line-1 Raw Mill, Coal Mill & Cement Mill) to Baghouse
 Major fans (12 nos.) inlet damper removal job on account of high pressure drop study with team
 VFDs Capex for Bag filters proposed (total 65 nos.) & Phase-I (35 nos.) installed, commissioned & Optimized
 Major fans saving optimization after inlet box modification.
 Re-prism Ultra project selected in Rawan top 3 (Water conservation through 4R approach).

PROFESSIONAL ACHIEVEMENTS

 Integrated Management System” External Certified training by QJS (ISO 9001:2015, ISO 14001:2015, OHSAS
18001:2007 and SA 8000:2014).
 Internal BCE Auditor.
 CII 18th National Award for Excellence in Energy Management 2017.
 Prepared Best Practices and Initiatives taken for Energy Conservation.
 Participation in ABG Reprism-2017.
 Qualified & presented Reprism 2019 for Regional Round (Bhuvneshwar).

INTERNSHIPS (During Diploma)


▪ Six One month industrial training at C.S.P.D.C.L. Supela Sub-station Chawani.

EDUCATIONAL & PROFESSIONAL CREDENTIALS


AMIE (Electrical Engineering) - (Batch: Summer 2013- Winter 2014)
Secured 63 %; From Institution of Engineers (India) Kolkata
Diploma (Electrical Engineering) - (Batch: 2008- 2011)
Secured 75.5 %; From Govt. Polytechnic Durg (C.G.)
Intermediate (PCM) in Year - 2008
Secured 69 %; School – Shram Niketan Higher Secondary School, Bhilai, CG Board
Matriculation in Year - 2006
Secured 82.3 %; School - Shram Niketan High School, Bhilai, CG Board
COMPUTER PROFICIENCY

 P6 (Primavera), MS Project & Shutdown Management System


 SAP (PM Module) – Power User
 7QC tools (Fish bone, Pareto etc.)
 TM-1, KAROMI, Confluence, Qualisof & ICSI
 Operating Systems: Latest version of Windows
 Software’s: MS-Office (Word, Excel, PPT), Outlook mail and other important tools.

SKILLS/ABILITIES

 Conceptual Skills: Ability to use information to solve business problems, recognizing problem areas &
implementing solutions, selecting critical information, understanding organization's business model.
 Communication Skills: Ability to transform ideas into words / actions, credibility among colleagues, peers, and
subordinates, presentation skills and spoken format, presentation skills; written / graphic formats.
 Interpersonal Skills: Mentoring skills, diversity skills, working with diverse people and culture, networking
within the organization, networking outside the organization, working in teams, cooperation and commitment.

PERSONAL INFORMATION
Date of Birth : 1st July 1991
Marital Status : Un-Married
Languages Known : English, Hindi

Date: 11-03-2024

Place: Kotputli Cement Works, Rajasthan, India (Pinky Patel)

You might also like