LUBEREF - LOG BOOK ENTRY
Job No./ Contract No.: 1170032631 Project Title: Growth-II Project at Luberef , Yanbu
Violation Code Observed During RFI Number
LBE No. Discipline Date Type of Vioaltion Area/ Location
Reference Surveillance/ RFI (If RFI Rejected)
Pro Active SAES-H-003 para
LBE-0024 Civil 22-Oct-24 Surveillance #REF! Growth II TCF Area
Notification 6.1
Observation Description Contractor Reply PMT Reply Remarks
The contractor is pro-actively notified on October
22, 2024, to apply protective coating on all exposed The above ground coating will be
above grade concrete surfaces by following its proceeded as per IFC drawings and
requirements (SAES-H-003 para 6.1) at the new requirements SAES-H-003 para 6.1 at
tank farm area. the final stage of the construction for
the AREA .
Name/ Signature Date Name/ Signature Date Name/ Signature Date Name/ Signature Date
Abdul Nisar Panjala 22-Oct-24 Mr. Peter Milad Sayed Fareiduddin Abdul Nisar Panjala
Original: Quality LBE File cc: Contractor PETROJET TR Ref. No.: _____ Doc. Code: - Approved - For Action - Review With Comments - Reject