0% found this document useful (0 votes)
35 views34 pages

POL Compliance Monitoring

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views34 pages

POL Compliance Monitoring

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 34

PRODU

PLANT : Sapphire
Month : September

Net RUNNING
Scheduled PLANNED Available L.E.
Date Week No Line Run VOLUME, kg Packed, Time, (Hr)
TIME,
(%)
(kg) (Hr)

01-Oct-24 40 1 DMBH 9,927 9299 22 17.22 78%

01-Oct-24 40 2 DMBH 12,739 17726.021 22 25.578673 116%

01-Oct-24 40 4 MAC H HP 14,369 10046.131 23 12.074676 52%

01-Oct-24 40 CWC 5,371 5888 24 23.552 98%

01-Oct-24 40 TST 9,978 10319 23.25 24.223005 104%

02-Oct-24 40 1 MED P FT 8,897 7,123.56 22.5 14.718099 65%

02-Oct-24 40 2 MED P FT 16,048 15,227.46 22.5 19.447587 86%

02-Oct-24 40 4 MED P FT 13547.174 22.5 15.553587 69%

16746.4575
02-Oct-24 40 CWC 5,371 4352 24 17.408 73%
02-Oct-24 40 TST 9,667 12020.321 23.25 28.216716 121%

03-Oct-24 40 1 P MED FT 8,354 11382.552 21.25 23.42089 110%

03-Oct-24 40 2 P MED FT 12,875 11936.329 21.25 16.624413 78%

03-Oct-24 40 4 P MED FT 15,969 16909.53 22.5 19.106814 85%

03-Oct-24 40 CWC 4,371 5376 24 23.9875 100%

03-Oct-24 40 TST 3,326 4536 8 10.647887 133%

04-Oct-24 40 1 EFS HP 10,463 10467 23.25 20.934 90%

04-Oct-24 40 2 TF REG 8,558 12021 23.25 13.769759 59%

04-Oct-24 40 4 MAC H HP 19,047 12137 22.5 13.591265 60%

04-Oct-24 40 CWC 5,371 4864 24 19.456 81%

05-Oct-24 40 1 EFS HP 5,708 5965 15 11.93 80%


05-Oct-24 40 2 TF REG 4,669 10,524.00 15 25.731051 172%

05-Oct-24 40 4 MED H HP 13,330 13,192.00 15.5 13.192 85%

05-Oct-24 40 CWC 5,371 2,816.00 24 11.264 47%

06-Oct-24 41

07-Oct-24 41 1 P MED FT 3,065 3575 7.75 9.4279835 122%

07-Oct-24 41 2 P MED FT 5,528 4582 7.75 5.2485682 68%

07-Oct-24 41 4 P MED FT 5,210 4582 7.5 5.0296378 67%

07-Oct-24 41 CWC 1,790 2048 8 8.192 102%

08-Oct-24 41 1 P MED FT 9,194 10280.754 22.25 21.15 95%

08-Oct-24 41 2 P MED FT 16,583 13889.926 22 15.91 72%

08-Oct-24 41 4 P MED FT 16,746 17015.105 22 18.68 85%

08-Oct-24 41 CWC 4,371 5376 24 21.504 90%

09-Oct-24 41 1 P MED FT/MRC HP 7,046 9064.252 21.25 21.841571 103%


09-Oct-24 41 2 P MED FT/TF REG 12,834 14,805.12 21.25 19.819442 93%

09-Oct-24 41 4 P MED FT 18,540 20,289.75 22.5 20.917264 93%

09-Oct-24 41 CWC 5,371 5,376.00 24 21.504 90%

10-Oct-24 41 1 MRC HP 6,856 7484.3509 22 19.643966 89%

10-Oct-24 41 2 TF REG 12,177 10455.411 22.5 15.285689 68%

10-Oct-24 41 4 MED H HP 19,350 17000 22.5 17 76%

10-Oct-24 41 CWC 4,371 4608 24 18.432 77%

11-Oct-24 41 1 EFS HP 8,224 4763 21.25 9.526 45%

11-Oct-24 41 2 TF REG 12,582 11244 23.25 16.438596 71%

11-Oct-24 41 4 MED H HP 19,350 14450 22.5 14.45 64%

11-Oct-24 41 CWC 5,371 3328 24 13.312 55%


12-Oct-24 41

13-Oct-24 42 1 EFS HP 2,999 2948 7 5.896 84%

13-Oct-24 42 2 TF REG 4,194 3742 6.33 5.4707602 86%


13-Oct-24 42 4 6,665 3750 7 3.75 54%

MED H HP

13-Oct-24 42 CWC 1,140 2304 8 9.216 115%

14-Oct-24 42 1 EFS HP 8,998 9635 22 19.27 88%

14-Oct-24 42 2 TF REG 12,582 16897 23 24.703216 107%

14-Oct-24 42 4 MED H HP/DMBH 19,995 17998 22 19.478355 89%

14-Oct-24 42 CWC 5,371 5632 24 22.528 94%

15-Oct-24 42 1 EFS HP 8,708 11226.526 22 22.453053 102%

15-Oct-24 42 2 TF REG 12,177 14741.903 22 21.55249 98%

15-Oct-24 42 4 MED H HP 19,350 16000 22 16 73%

15-Oct-24 42 CWC 5,371 5376 24 21.504 90%

16-Oct-24 42 1 EFS HP 8,708 9797.6957 22 19.595391 89%

16-Oct-24 42 2 TF REG 12,582 14242.947 22 20.823021 95%

16-Oct-24 42 4 MED H HP 19,350 16500 22 16.5 75%


16-Oct-24 42 CWC 4,371 4608 20 18.432 92%

17-Oct-24 42 1 EFS HP 8707.5 22 17.463485 79%


8731.7427
17-Oct-24 42 2 MED H HP 11,800 14432.482 21 21.038604 100%

17-Oct-24 42 4 MED H HP 19,995 17,250 22 17.25 78%


17-Oct-24 42 CWC 5371 5,376 24 21.50 90%

To-Date 1265 1079 85.32%

LE 85.32%
EPL 0.50%
OPL 16.68%
Plant Sapphire Emerald Diamond

Line 1
2
3
4
A
B
C
D

Cell Input done


not done

Month January
February
March
April
May
June
July
August
September
October
November
December
PRODUCTION OPERATION LOGSHEET COMPLIANCE MONITORING

POL COMPLIANCE CHECK


P V A P L L E O
l o v r i o P P
a l a o n s L L
n u i d e s
m l u D D
e a c E T e e
EPL OPL Comp., b t f i t t
EPL, (%) OPL, (%) l i f m a a
(Hr) (Hr) (%) e v i e i i
e c l l
T i s s
i t e
m i n
e m c
e y

4.78 0.21725589 91.67%

83.33%

2.5 10.87% 8.4253235 36.63% 91.67%

0 0.448 1.87% 100.00%

0 91.67%

7.7819012 34.59% 100.00%

3.0524128 13.57% 100.00%

6.9464132 30.87% 100.00%

6.592 27.47% 100.00%


0.00% 91.67%

0.00% 83.33%

4.6255869 21.77% 91.67%

3.3931864 15.08% 91.67%

0.0125 0.05% 100.00%

0.00% 83.33%

2.316 9.96% 91.67%

9.4802405 40.78% 91.67%

8.9087346 39.59% 91.67%

4.544 18.93% 100.00%

3.07 20.47% 100.00%


0.00% 83.33%

2.308 14.89% 91.67%

12.736 53.07% 100.00%

0.00%

91.67%

2.5014318 32.28% 100.00%

2.4703622 32.94% 100.00%

91.67%

1.1 4.94% 91.67%

6.09 27.68% 91.67%

3.32 15.09% 91.67%

2.496 10.40% 100.00%

91.67%
1.4305577 6.73% 100.00%

1.5827356 7.03% 100.00%

2.496 10.40% 100.00%

2.3560344 10.71% 100.00%

7.2143108 32.06% 100.00%

5.5 24.44% 100.00%

5.568 23.20% 100.00%

11.724 55.17% 100.00%

6.8114035 29.30% 100.00%

8.05 35.78% 100.00%

10.688 44.53% 100.00%


0 0.00%

1.104 15.77% 100.00%

1.6 25.28% 100.00%


0.66 9.43% 2.59 37.00% 100.00%

91.67%

2.73 12.41% 100.00%

0.00% 91.67%

2.521645 11.46% 100.00%

1.472 6.13% 100.00%

91.67%

0.4475098 2.03% 100.00%

6 27.27% 100.00%

2.496 10.40% 100.00%

2.4046085 10.93% 100.00%

1.1769787 5.35% 100.00%

5.5 25.00% 100.00%


1.568 7.84% 100.00%

1.41 3.1265146 14.21% 100.00%


0.00% 100.00%

0.1666667 0.76% 4.58 20.83% 100.00%


2.496 10.40% 100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

6.337 0.50% 211 16.68% 96.43% 100% 100% 100% 100% 100% 100% 100% 100%
NG

ANCE CHECK
S S B O
h u a t
i p l h
f t a e
t . n r
c s
R S e REMARKS
e i
p g
o .
r
t

a. 2:00-3:15PM - Shift change cleaning


b. 5:30-7:00PM Load cut off due to low pared meat supply
c. Incomplete signature - 2nd shift PQC

a. 1st shift 22-26rpm straight loading


b. 2nd shift 22rpm straight loading
c. 3rd shift 26rpm - 10:00-11:00PM underwent shift change cleaning
d. Total reworked = 6376.7 kg
e. Incomplete signature - 2nd shift PQC

a. 6:00-7:00AM- Underwent shift change cleaning


b. 7:25-9:30AM - delayed loading due to blinding of coil of 1st compt (door & fan
side both 1st layer) - EPL
c. Incomplete signature - 2nd shift PQC

a. 1st shift flowrate = 3500lph


b. 2nd shift flowrate = 3300lph
c. 3rd shift flowrate = 3800lph
No abnormalities encountered.
a. Straight loading
b. Incomplete signature - 2nd shift PQC

a. 1st shift - run under capacity due to low supply of pared meat
b. 2nd shift - 2:00PM-9:30PM - Unable to load due to low pared meat supply.
Reloaded at 9:30pm MedP FT @14rpm.
a. 1st shift - run under capacity due to low supply of pared meat
b. 2nd shift - 2:30-2:40PM - Switch load to MedP FT @22-20rpm

a. 1st shift - run under capacity due to low supply of pared meat
b. 2nd shift - 2:50-3:00PM Switch load to MedP FT @22-20rpm
c. 2nd shift - 9:30-10PM load cutoff and proceed to shift change cleaning
d. 3rd shift - 10:00-11:00PM underwent shift change cleaning

a. 1st shift - conducted CIP


Straight loading

a. 1st shift started at 15 rpm only


b. 2nd & 3rd shift - straight loading at 14 rpm
c. Incomplete signature - 1st shift Dry Process Foreman, PQC & WDS

a. 1st shift - 6:00-7:00AM - underwent shift change cleaning (planned)


b. Reloaded 7:00AM - 30 rpm
c. 2nd shift 3:00PM - reduced rpm from 30 to 24
d. 2nd shift 4:00PM - reduced rpm from 24 to 20 run under capacity
e. 3rd shift run under capacity at 20rpm
f. Incomplete signature - 1st shift Dry Process Foreman, PQC & WDS
a. 1st tp 3rd shift run under capacity at 20rpm
b. Incomplete signature - 1st shift Dry Process Foreman, PQC & WDS

a. 1st shift flowrate = 3500lph


b. 2nd shift flowrate = 3300lph low water collection
c. 3rd shift flowrate = 3000lph
No abnormalities encountered.
a. Proceeded to shutdown cleaning
b. Incomplete signature - 1st shift Dry Process Foreman, PQC & WDS

a. 1st shift - 5:20AM load cut off underwent cleaning, reloaded 7:30AM
b. 2nd shift - 6:10-6:20PM cutting head sudden stoppage proceed to replacement
c. 2nd shift - 8:35-9:20PM encountered Packer bucket entanglement (not EPL)
d. Incomplete signature - 1st shift Dry Process Foreman & PQC

a. 1st shift - 6:00am-8:00AM - Product type change cleaning. Reloaded at 8am TF


Reg @26-28rpm
b. 2nd shift - reduced rpm drom 28 to 22 run under capacity
c. 2rd shift - run at 26 rpm but still under capacity
d. Incomplete signature - 1st shift Dry Process Foreman & PQC

a. 1st shift 6:00-6:40AM - switch load; delayed loading due to low pared meat
supply
b. 2nd shift - run under capacity
c. Incomplete signature - 1st shift Dry Process Foreman & PQC

a. 1st shift 6:00-8:00 standby for process waiting for raw cocowater build up
b. 1st shift flowrate = 3800lph reduced to 3500
c. 2nd shift flowrate = 3000lph
d. 3rd shift flowrate = 3800-4000lph

a. 1st shift- straight run at 22Hz pre-sizer setting


b. 2nd shift - 2:40-4:30PM encountered Bucket entanglement
c. 8:30PM cut off load upon consuming all nuts, proceeded to shutdown cleaning
due to inavailabilty of nuts
d. Incomplete signature - 1st shift Dry Process Foreman & PQC
a. 1st shift- straight run at 28rpm
b. 2nd shift - 2:40-4:30PM encountered Bucket entanglement
c. 10:00PM cut off load upon consuming all nuts, proceeded to shutdown cleaning
due to inavailabilty of nuts
d. Incomplete signature - 1st shift Dry Process Foreman & PQC

a. 1st shift- straight run at 22Hz pre-sizer setting


b. 2nd shift - 10:15PM cut off load upon consuming all nuts, proceeded to
shutdown cleaning due to inavailabilty of nuts
c. Incomplete signature - 1st shift Dry Process Foreman & PQC
a. 1st shift = 3000lph low flowrate due to low supply of raw cocowater
b. 8:30PM stop evaporation process proceeded to shutdown cleaning/CIP
Shutdown

a. 1st shift - Shutdown


b. 2nd shift - Start-up
c. 3rd shift - Operation
d. 3rd shift 4:40AM load cut off due to low pared meat supply
e. Encountered product off sieve; generated off sieve:
P Med FT = 143kg
Mac = 136 kg

a. 1st shift - Shutdown


b. 2nd shift - Start-up
c. 3rd shift - Operation - run at 22 rpm under capacity

a. 1st shift - Shutdown


b. 2nd shift - Start-up
c. 3rd shift - Operation
d. Encountered product off sieve; generated 136kg off sieve

a. 1st shift - Shutdown


b. 2nd shift - Start-up/CIP
c. 3rd shift - Operation - flowrate at 3500lph

a. 1st shift - no POL report


b. 2nd shift - 5:00-6:20PM - load cut off due to low supply of pared meat
c. 3rd shift - straight loading at 14rpm only

a. 1st shift - no POL report


b. 2nd shift - straight loading at 20rpm only
c. 3rd shift - straight loading at 24-28rpm

a. 1st shift - no POL report


b. 2nd shift - straight loading at 20rpm only
c. 3rd shift - 10:00-11:20PM underwent shift change cleaning

a. 1st shift flowrate = 3500lph


b. 2nd shift flowrate = 3000lph low cocowater collection
c. 3rd shift flowrate = 3000-3500lph

a. 1st shift - straight run at 14 rpm; encountered off sieving


b. 2nd shift - Load cutoff at 5:15pm, proceed to product type change cleaning,
reloaded at 6:45pm with MRC HP
a. 1st shift -straight run
b. 2nd shift - Load cutoff at 6:40pm after consuming all FT nuts and proceeds to
intensive cleaning. Reloaded at 8:20pm with TF Reg

a. 1st shift - straight run


b. 2nd shift - Load cutoff at 6:50pm after consuming all FT nuts, switch load to
Med H HP @45hz

a. 1st shift flowrate = 3000lph


b. 2nd shift flowrate = 3300lph
c. 3rd shift flowrate = 3300-3500lph
a. 3rd shift - 4:20-6:00AM- load cut off upon completion of MRC HP requirements
proceed to intensive cleaning
a. 2nd shift - 3:00-4:20PM / 9:00-9:40PM - Load cut off due to low pared meat
supply

a. 1st shift flowrate = 3000lph


b. 2nd shift - Drilling stopped 3:50pm and proceeds to 4-step CIP. Resume drilling
at 5:35pm.
• Pasteurizer: process stop at 4:40pm and proceeds to 6-step CIP, process
resumed 8:50pm at 4200lph
• Evaporator: process stop at 5:30pm and proceeds to 6-step CIP, process
resumed 9:00pm at 3800lph
c. 3rd shift flowrate = 3800lph

a. 1st shift - 6:00-6:25AM - Underwent cleaning reloaded at 6:25am EFS HP @20hz


b. 9:10PM load cut off upon consuming all nuts
c. 3rd shift - proceeded to shutdown cleaning due to inavailability of nuts

a. 10:30PM load cut off upon consuming all nuts


b. 3rd shift - proceeded to shutdown cleaning due to inavailability of nuts

a. 10:45PM load cut off upon consuming all nuts


b. 3rd shift - proceeded to shutdown cleaning due to inavailability of nuts
Proceeded to shutdown CIP
Shutdown

a. 1st shift - shutdown


b. 2nd shift - start up
c. 3rd shift - operation, loaded 9:00PM

a. 1st shift - shutdown


b. 2nd shift - start up
c. 3rd shift - loaded 11:40PM, delayed loading due to blinding of coil in Compt. 1
a. 1st shift - shutdown
b. 2nd shift - start up
c. 3rd shift - loaded 10:30PM, delayed loading due to blinding of coil in Compt. 1
Fanside and Doorside

a. 1st shift - shutdown


b. 2nd shift - start up
c. 3rd shift - operation; flowrate 3500-3800lph

a. 1st shift - run at 20-22Hz, no abnormalities encountered


b. 2nd shift - run at 22Hz, no abnormalities encountered
c. 3rd shift - 4:30-4:50AM experienced clogged cutting head

a. 1st shift - run at 28-30rpm, no abnormalities encountered


b. 2nd shift - Run at 30rpm, no abnormalities encountered
c. 3rd shift - Run at 30rpm, no abnormalities encountered

a. 1st shift - Run at 45Hz presizer frequency, no abnormalities encountered


b. 2nd shift - 3:00PM-3:10PM cut off load switched load to DMBH
c. 5:45PM-5:55PM cut off load switched back to Med H HP
c. 3rd shift - Run at 40Hz presizer frequency, no abnormalities encountered

a. 1st shift - Straight process at 3500lph-3300lph


b. 2nd shift - Straight process at 3500lph
c. 3rd shift - Straight process at 3500lph

a. 1st shift - run at 22Hz, no abnormalities encountered


b. 2nd shift - run at 24Hz, no abnormalities encountered
5:15PM reduced capacity to 20Hz
c. 3rd shift - increased capacity to 24Hz, no abnormalities encountered

a. 1st shift - run at 30-32rpm, no abnormalities encountered


b. 2nd shift - reduced rpm to 24rpm, no abnormalities encountered
c. 3rd shift - 10:00-10:45PM underwent shift change cleaning

a. 1st shift - run at 40-42Hz, no abnormalities encountered


b. 2nd shift - reduced capacity to 35Hz, no abnormalities encountered
c. 3rd shift - run at 42Hz, no abnormalities encountered

a. 1st shift flowrate - 3000lph; 9:00AM reduced flowrate to 2700lph


b. 2nd shift flowrate - 3000-3500lph
c. 3rd shift flowrate - 3500lph
a. 1st & 2nd shift - straight loading but run under capacity due to low pared meat
supply

a. 2nd shift - 2:00-3:00PM underwent shift change cleaning


b. 3rd shift - load cut off 5:00AM after completing the TF reg proceeded to product
type change cleaning
a. 3rd shift - 10:00-11:00PM shift change cleaning
Underwent CIP
a. 2nd shift - load cut off 5:45PM-7:10Pm due to low pared meat supply and
detached holder of batchweigher. Proceed to unscheduled cleaning
a. 1st shift - 5:00-7:00AM underwent shift change cleaning
b. 2nd shift - 6:15-7:00PM load cut off due to low pared meat supply
a. 2nd shift 9:10-9:20PM sudden stoppage of Comitrol due to low oil level

95% 79% 83% 100%


100.00%

637670.00%

100.00%

100.00%

104.18%

100.00%

100.00%

100.00%
W
121.36%

110.22%

100.00%

100.00%

100.00%

133.10%

100.00%

100.00%

100.00%

100.00%

100.00%
171.54%

100.00%

100.00%
0.00%

121.65%

#REF!

135.34%

#REF!

unn

100.00%

100.00%

100.00%

102.78%
100.00%

100.00%

100.00%

100.00%

100.00%
100.00%

100.00%

100.00%

100.00%

100.00%
100.00%
0.00%

100.00%

111.70%
100.00%

115.20%

100.00%

107.41%

100.00%

100.00%

102.06%

100.00%

100.00%

100.00%

100.00%

100.00%
100.00%
100.00%

93.59%
100.18%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

102.50%
30.00%

PLANT PERFORMANCE 25.00%

20.00%

15.00%
16.
68% 10.00%
0.5
0% 5.00%

0.00%
y) lt
pt esu
m
(e tal R
-5.00%
To

10

85.32% 9

LE EPL OPL 1

0
(empty) Total
Resul
30.00% Plant EPL (%)
25.00%

20.00%

15.00%

10.00%

5.00%

0.00%
y) lt
pt esu
m
(e tal R
-5.00%
To

Plant EPL, (Hr)


10

0
(empty) Total
Result
100.00%
Plant OPL (%)
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.00%

Plant OPL (Hr )


12

10

0
(empt Total
y) Result
POL MTD Compliance

Over All 96.43%

Others 100%
0 0 0 0 0 0 0

Balance 83%

Supt. Sig. 79%

Shift Report 95%

OPL Details 100%

EPL Details 100%

Loss Time 100%

Line Efficiency 100%

Productive time 100%

Available Time 100%

Volume 100%

Plan 100%

0% 20% 40% 60% 80% 100%


96.43%

100%

83%

9%

95%

100%

100%

100%

100%

100%

100%

100%

100%

80% 100% 120%


Column E (empty)
(empty)
Total Result
AT LE EPL OPL
% 88.67% 3.80% 7.53%
HR 463.5 411 17.6 34.9
Column E (empty) Column E (empty)
(empty) (empty)
Total Result Total Result
Column E (empty) Column E (empty)
(empty) (empty)
Total Result Total Result