0% found this document useful (0 votes)
155 views3 pages

ECA Form1,2,3

Uploaded by

2024408836
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
155 views3 pages

ECA Form1,2,3

Uploaded by

2024408836
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

ROYAL INSTITUTION OF SURVEYORS MALAYSIA

BUILDING COST INFORMATION CENTRE

ELEMENTAL COST ANALYSIS - Form 1

JOB TITLE: CADANGAN PEMBANGUNAN 1 UNIT PEJABAT PENTADBIRAN CLIENT: YP PLANTATION HOLDINGS SDN. BHD.
2 UNIT RUMAH PENGURUS, 4 UNIT RUMAH PENOLONG PENGURUS,
16 UNIT RUMAH BERKEMBAR KAKITANGAN,1 UNIT PONDOK PENGAWAL
DAN 1 UNIT PENCAWANGAN TNB DI LADANG SG.KEMBAR,
DAERAH ROMPIN PAHANG DARUL MAKMUR.
LOCATION: DAERAH ROMPIN PAHANG DARUL MAKMUR. TENDER DATE: 2-Feb-12

INFORMATION TOTAL PROJECT


Project and Contract Information
Project Details and Site Condition: Contract:
Standard Form P.W.D FORM 203

Market Conditions:
Contract Particulars: Competitive Tender List

Type of Contract: Cost Fluctuation: Yes RM Int (jv)/L

No /
Basis of Tender Open/Selected
Bills of Quantities / Competition Government

Bills of Appr. Quant. Negotiated Private /

Sched. Of Rates/ Provisional Sum RM 155,000.00


Spec. & Drawings Serials
Prime Cost Sum RM 0.00
Contract Period Stip. By Client: 15 months
Preliminaries RM 333,920.00
Contract Period Offered by Builders: 15 months
Contingencies RM 0.00
Number of Tenders Issued:
Contract Sum RM 6,471,000.00
Number of Tenders Received:

ANALYSIS OF SINGLE BUILDING


Design/Shape Information

Accommodation and Design Features:

Areas: Functional Unit: Design/Shapes


Percentage of Gross Floor Area
Lower Ground Floor N/A m2
Ground Floor m2 External Wall Area (a) Below Grd. Flr. %
Upper Floor m2 Gross Floor Area
GROSS FLOOR AREA m2 (b) Single Storey
Construction 100%
Usable Area m2 =
Circulation Area m2 (c) Two-Storey
Ancillary Area m2 Storey Heights: Construction %
Internal Division m2
GROSS FLOOR AREA m2 Av. Below Grd. Floor m (d) 3-Storey
Construction %
Floor Space NOT Enclosed m2 At Ground Floor m
(e) - Storey
Roof Area m2 Above Ground Floor m Construction %
(Structural & Plant Rooms)
Brief Cost Information
Contract Sums RM 6,471,000.00 Functional Unit Costs
Provisional Sums RM 155,000.00 excluding external works:
Prime Cost Sums RM 0 0
Preliminaries RM 333,920.00 being % of remainder
Contingencies RM 0 being % Contract Sum
Contract Sums less Contingencies RM
INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTRE

ELEMENTAL COST ANALYSIS - Form 2

ELEMENT COST ANALYSIS - Form 2

SUMMARY OF ELEMENT COSTS

GROSS FLOOR AREA: TENDER DATE:

Preliminaries Shown Separately


Total Cost Cost per m2 Element Element Unit Element Reinforced Reinforcement Formwork
of Element GFA Unit Rate Ratio Concrete kg m2
RM RM Quantity RM per m2 GFA m3

1 Substructure
1A Piling
1B Work Below Lowest 105,385.80
Floor Finish
Group Element Total 105,385.80
2 Superstructure
2A Frame 51,633.50
2B Upper Floors
2C Roof 90,725.70
2D Stairs
2E External Walls 11,395.00
2F Windows & External Doors 32,224.00
2G Internal Walls & Partitions 19,422.00
2H Internal Doors 6,171.00
Group Element Total 51,633.50
3 Finishes
3A Internal Wall Finishes 19,392.90
3B Internal Floor Finishes 24,135.60
3C Internal Ceiling Finishes 32,003.60
3D External Finishes 22,843.40
Group Element Total

4 Fittings and Furnishings P.C. Sum Allowed Tendered Sum

5 Services
5A Sanitary Appliances 7,510.00
5B Cold Water System & Plumbing
Installation 12,750.00
5C Refuse Disposal
5D Air-conditioning & Ventilation 57,000.00
System
5E Electrical Installation 46,210.00
5F Fire Protection Installation 1,440.00
5G Lift & Conveyor Installation
5H Communication Installation 450.00
5J Special Installations
5K Builder's Profit & Attendance
on Services
5L Builder's Work in Connection 5,143.56
with Services
Group Element Total

Sub-total exc. External Works,


Preliminaries and Contingencies

6 External Works
6A Site Work
6B Drainage 144,950.00
6C External Services
6D Sewerage 176,226.00
6E Water Reticulation 259,360.00
Group Element Total

Preliminaries 333,920.80

TOTAL (less Contingencies)


INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTRE

ELEMENTAL COST ANALYSIS - Form 3

BRIEF SPECIFICATION
GROSS FLOOR AREA: TENDER DATE:

ELEMENT SPECIFICATION
1 Substructure
1A Piling
1B Work Below Lowest Floor Finish

2 Superstructure
2A Frame
2B Upper Floors
2C Roof
2D Stairs
2E External Walls
2F Windows & External Doors
2G Internal Walls & Partitions
2H Internal Doors

3 Finishes
3A Internal Wall Finishes
3B Internal Floor Finishes
3C Internal Ceiling Finishes
3D External Finishes

4 Fittings and Furnishings

5 Services
5A Sanitary Appliances
5B Plumbing Installation
5C Refuse Disposal
5D Air-conditioning & Ventilation System
5E Electrical Installation
5F Fire Protection Installation
5G Lift & Conveyor Installation
5H Communication Installation
5I Special Installation
5J Builder's Profit & Attendance on Services
5K Builder's Work in Connection
with Services

6 External Works
6A Site Work
6B Drainage
6C External Services
6D Ancillary Buildings
6E Recreational Facilities

You might also like