NOTES
1. THIS DRAWING IS NOT TO BE SCALED.
2750 POST CENTRES
2. GAP BETWEEN PALES AND BETWEEN PALES AND RSJ TO BE NOT GREATER THAT 50 mm.
FENCE HEIGHT TO BE ADJUSTED AT GATE TO 100
ACHIEVE MIN 2600 mm FROM ROAD LEVEL 3. MINIMUM HEIGHT OF FENCE ON EITHER SIDE OF COMPOUND IS TO BE 2600 mm
4. PALISADE FENCE TO HAVE GREEN POWDER COATING. COLOUR; MOSS GREEN RAL 6005.
TOP OF FENCE
5. ALL DIMENSIONS ARE IN mm. NO DIMENSIONS SHALL BE SCALED FROM THE DRAWINGS.
6. THIS DRAWING IS PRODUCED FOR PLANNING PURPOSES ONLY. ALL DIMENSIONS AND
350
REFERENCES GIVEN ARE SUBJECT TO DETAILED DESIGN. THIS DRAWING IS NOT FOR
CONSTRUCTION.
55 7. CIVIL CALCULATIONS ARE TO BE CARRIED OUT AT THE DETAILED DESIGN STAGE AND TAKE INTO
ACCOUNT SPECIFIC, EXISTING SITE GROUND CONDITIONS.
2600
150
50
50
PANELS EMBEDDED 50 mm IN
CONCRETE PLINTH & 100 mm MINIMUM CONCRETE PLINTH 50 mm MIN.
CONCRETE COVER TO FRONT OF PALES ABOVE & BELOW GROUND LEVEL
CONCRETE FOUNDATIONS
CONCRETE FOUNDATION CONCRETE FOUNDATION
ELEVATION OF FENCE SIDE ELEVATION OF POST
SCALE 1:25 SCALE 1:25
200 4900 200 1100 100
10 TOP OF PALES TO GATES
2445 2445 50 MAX TO BE LEVEL WITH TOP OF
TOP OF FENCE PALES TO FENCE
300
300
2600 FROM TOP OF PLINTH (INSIDE)2600
1160
40
2600
2600
270
3 PROJECT TITLE REVISED SB
2 21.08.23 CHANGED TO A1 SIZE, GATE DETAILS ADDED SB SB SD JMcL
1 29.04.22 PRODUCTION UNIT REVISED SB RH AH SK
1301
0 10.12.20 INITIAL VERSION RK RH BP SK
945
REV DATE REVISION DESCRIPTION DRN PROD VER APP
COPYRIGHT © ESB
ALL RIGHTS RESERVED. NO PART OF THIS WORK MAY BE MODIFIED, REPRODUCED OR COPIED IN ANY FORM
OR BY ANY MEANS - GRAPHIC, ELECTRONIC OR MECHANICAL, INCLUDING PHOTOCOPYING, RECORDING,
TOP OF PLINTH INSIDE TAPING OR USED FOR ANY PURPOSE OTHER THAN ITS DESIGNATED PURPOSE, WITHOUT THE WRITTEN
150
PERMISSION OF ESB.
75
PURPOSE OF ISSUE - PRELIMINARY UNLESS INDICATED
75
CLIENT
APPROVAL PLANNING X TENDER CONSTRUCTION AS-BUILT
CONCRETE
CONCRETE PLINTH
SECTION A
FOUNDATION CLIENT
250 x 150 mm SCALE 1:25 - Oriel Windfarm Limited
DOUBLE GATE ELEVATION PROJECT
SCALE 1:25
Oriel Wind Farm Project
CONCRETE FOUNDATION
CONTRACT
4900
SINGLE GATE ELEVATION 900
DRAWING TITLE
SCALE 1:25 ONSHORE SUBSTATION
CONCRETE PALISADE FENCE AND GATE DETAILS
FOUNDATION
A
850 - 1100
CLEAR OPE ANTI CLIMBING DEVICE PRODUCTION UNIT
GATE TO OPEN INWARDS FIXED TO CORNER POST Civil, Environmental and Renewable Engineering
900
GATES TO OPEN INWARDS
CONCRETE
LEAF 'B' FOUNDATIONS
360
ANTI CLIMBING DEVICE FIXED
LEAF 'A' TO SUPPORT BRACKET
THIS LEAF TO OPEN FIRST
DRAWN PRODUCED VERIFIED APPROVED APPROVAL DATE
HOLDING POINT S.Bolton S.Bolton S. Donnelly J.McLoughlin 21/02/2024
PLAN ON DOUBLE GATE FOR DROP BOLT
PLAN ON SINGLE GATE DETAILS OF ANTI-CLIMBING AID (WHERE APPLICABLE) CLIENT REF NO. OF SHTS SIZE SCALE
TC223815 1 A1 1:25
SCALE 1:25 SCALE 1:25 SCALE 1:25
DRAWING NUMBER SHEET REV
PE605-D027-038-016-003
c:\bc-workspace\bolton_s\m-virtapp928s,d-high voltage\drawings\pe605 design services to aertech\027 - oriel windfarm 220 kv grid connection\pe605-d027-038-016-003.dwg